| 1 | carting of boring machine |
| 2 | Carting of boring machine & materials as casing pipe caping set T & P etc. from store to site and return of above assembly after completion of work |
| 3 | Supply of Tubewell Assembly |
| 4 | 225 mm dia pipe Housing pipe of 10 kg pressure cm2 ISI Mark. |
| 5 | 225 mm dia pvc slotted pipeof 10 kg pressure cm2 ISI Mark |
| 6 | Drilling of Bore |
| 7 | Drilling of 600 m bore from GL to 60m BGL |
| 8 | Drilling of 600mm Bore 60 M to105 M BGL |
| 9 | Water arrangement for construction of T.W |
| 10 | Lowering of Tubewell assembly |
| 11 | Lowering of 225 mm dia pvc pipe from GL to 50 m BGL |
| 12 | Lowering of 225 mm dia pvcBlind/Slotted pipe from 50 m to 100 BGL. |
| 13 | Supply of 1.6 mm to 4.8 mm size pea gravel from Lal Quan Quarry |
| 14 | Development of Tubewell |
| 15 | Erection of compressor Unit and cap equipage |
| 16 | Dismantling of above after completion of work |
| 17 | Development of Tube Well by 250 PSI Capacity air Compressor |
| 18 | Erection of O.P Unit and Camp equipage |
| 19 | Dismentling of above after completion of work |
| 20 | Development of Tube Well by O.P Unit |
| 21 | Yield and Verticality test of Tube Well |
| 22 | Chemical and bacteriological test of water. |
| 23 | Rental charges of Rig Machine, Air compressor and O.P Unit |
| 24 | Site Clearance after completion of T.W & cutting, welding of well cap after development and earth filling in water pits. |
| 25 | PUMPING PLANT FOR TUBEWELL |
| 26 | Switch gear panel for 15 HP along with cubical panel, starter , power wring and earthing material complete in all resect. |
| 27 | 10H.P. ISI mark submersible motor pump set |
| 28 | 6.00 mm three core flat P.V.C. cable submersible use, IS 694 make Havells, finolex |
| 29 | Construction of mini tube well chamber as per type of design and direction of engineer in charge including all materials labours T&P etc completion of work |
| 30 | Installation charges including angle iron frame box ply board and fixing materials etc. complete. |
| 31 | Supply of ‘B’ class ISI mark M.S. pipe 100 mm dia flang in the length of 3 mts. as per (IS 3589-200) |
| 32 | Supply & fixing of C.I.D.F. Reflux valve 100 mm dia ISI mark heavy duty |
| 33 | Supply & Fixing CIDF sluice valve 100 mm dia I.S 14846, CI Body/Wedge/brozegings/SS 410 shaft construction SS IS 6603 (ISI marked) |
| 34 | Installation of Electrical fitting charge with all labour and t&P etc complete of work |
| 35 | Connection with main line including cutting of main line & all required item’s(PVC)up to 15m |
| 36 | GST 18% |