Tender For Maintenance An Repairing To Left Embankment Of River Hoogly For A Total Length Of 70.00 M In Mouza-Bishnurampur, Block - Kulpi, Dist - South 24 Pgs Under Canals Division During 2025-26. (2Nd Call Of E-Nit No. Wbiw/Ee-Ii/Cd/E-Nit-38E/2024-25/
Tender Overview
Project Description
Maintenance An Repairing To Left Embankment Of River Hoogly For A Total Length Of 70.00 M In Mouza-Bishnurampur, Block - Kulpi, Dist - South 24 Pgs Under Canals Division During 2025-26. (2Nd Call Of E-Nit No. Wbiw/Ee-Ii/Cd/E-Nit-38E/2024-25/Sl.No.0
BOQ
| Sl. No. | Item Description |
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.Where boats are necessary. |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete(capacity 50 kg). |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 6 | Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 8 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 9 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3Size of Nylon crate is 1metre X 1metre X 1metre(b) Where boats are necessary. |
| 10 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead ofE) Beyond 4.00 km and upto 5.00 km,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note: For compensation of earth for land owned and arranged by contractor add 25.00 per Cum extra over rate of E/W for land woned /arranaged by the Department. Royalty charge on earth @ 29.00 Per Cum and cesses charges @ 5.30/ cum (ie Rs 15 per 100 cft )as per Govt. notification, which will be paid on production of necessary document in support of payment made towards royalties& cesses. |
| 11 | (A) Materials delivered and stacked at site(5) Ordinary bats. |
| 12 | Cost of stone / laterite boulders at quarry site including Royalty (Royalty certificate in original from concerned authority are to be submitted along with the bill, otherwise amount of Royalty will be deducted from the bill) c) Laterite Boulder (Each weighing 20 kg & upto 40 kg) |
| 13 | Labour charges for stacking unloaded boulder/ shingles to make themconvenient for measurement as per direction of the Engineer-in-chargea) Boulder of size above 30 kg . |
| 14 | Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg &above / Shingles / Brick Bats, from stack of worksite with all leads andlifts in water or spreading the same on the slope of the bank ofRiver/Sea or the slope of the embankment or in the River/ Sea bed toan uniform thickness as per direction of the Engineer-in-chargeincluding cost of all accessories and other incidental charges. (b) Boulder 25kg & above where boats arenecessary. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender