| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 2 | Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operationisspecificallyascertained as per direction of the Engineer-in-charge. |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 nm. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required completea) Depth of excavation not exceeding 1,500 mm. |
| 4 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing thesausage cage in position, filling the same with boulder or lump agreegates complete as perdirectionoftheEngineer-in-charge butexcludingthecostof boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces )(i) 1.20 metre x 0.60 metre nominal section |
| 5 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends,with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge.a) Mesh size 125 mm x 125 mm with 10 SWG wire |
| 6 | Supply of stone / laterite boulder at siteincluding cost of materials, loading, unloadingand carriage and including all incidental chargeslike Royalty, complete.Royalty certificate inoriginal from concerned authority are to besubmitted along with the bill) Cost of stone /laterite boulder at quarry site including Royalty(Royalty certificate in original from competentauthority are to be submitted along with thebill, otherwise amount due towards Royalty ofstone/laterite boulder will be deducted fromthe bills of works) .a) Panchami source (Each weighing 25 kg &above) |
| 7 | Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge.a) Boulder of size above 20 kg |
| 8 | Darma mat stiffened with split bamboo wailing pieces in both direction @ 50 cm c/c, placed, fitted and fixed with frame work or behind piling works and tied with 22 SWG, GI wire as per direction including cost, carriage and supplying all materials to site complete.A) Where boats are not necessary |
| 9 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5cm.diameter. (Dia.tobe measured at mid length). |
| 10 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary |
| 11 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on roadby all means,including other incidental charges complete.Note:Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.” |
| 12 | Labour charges for filling HDPE bagswith filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 13 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge withina lead of,NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.a) Beyond 1.00 km and upto 2.00 km |
| 14 | Earthwork from borrow pitsover existingembankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |