Rural Development Government Departments Closing in 0 days TDR #48765244

Construction/Upgradationofndbfundedmmgsyand Their Maintenance For Five Years

Issued by Government Departments · gogri, Bihar
Tender Value
5.81 Crore
Estimated cost
Bid Submission
24 Apr 2025
0 days left
EMD
11.63 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
gogri → Bihar
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction/UpgradationofNDBFundedMMGSYand their Maintenance for Five years

BOQ

Name of Work: Ratan douragachhiToDouragachhi mushahari,Bhuria to bharreTosadipur musahri,Rwd road pakrailTokamat tola,NH 31 deotha paharpur nabbed roadToBasudeopur,Panchayat pcc road near middle school katgharaTokatghara tola ward no 12,Patel Nagar RajdhanToBishvkarma Tola Rajdhan,Dakshin harizan Tola sahronTosahroun Harijan Tola uttar,Sahroun pcc Road ward no 1ToSharma Tola dakshin sahroun,DIVISION-GOGARI, DISTRICT-KHAGARIA
Sl. No. Item Description
1Ratan douragachhiToDouragachhi mushahariSetting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
2Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
3Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
4For 1000 m lead
5For 100 m lead
6Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
7Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
8Water Bound Macadam with Stone ScreeningsWBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
9Cement Concrete Pavement Construction of un-reinforced , dowel jointed at expansion and construction joint only , plain cement thickness as per design , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceeding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501.
10ii) Ordinary Kilometer Stone (Precast)
11iii) 200 m stone (Precast)
12(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
13Printing New Letters and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Clause 1701
14Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
15i) 600 mm equilateral & triangle
16iii) 600 mm circular
17v) 600 mm x 450 mm rectangular
18Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
19Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104
20Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-10 Grade
21Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203PCC M-15 Grade
22Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC M-15 Grade
23Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
24Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M-25 Grade
25Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
26Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(With Sandy Materials )
27Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8
28Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (Coping - PCC M-20 Grade )
29Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M-25 Grade
30Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
31Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
32Drainage spouts complete as per drawing and technical specifications Clause 1209
33Add Labour Cess @ 1%
34Add Seigniorage Fee @ 10% on Material Cost only
35Add GST @ 18%
36Maintenance cost of Road
37Add Labour Cess @ 1%
38Add Seigniorage Fee @ 10% on Material Cost only
39Add GST @ 18%
40Bhuria to bharreTosadipur musahriSetting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
41Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
42Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
43For 1000 m lead
44For 100 m lead
45Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
46Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
47WBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
48Prime Coat (Low porosity)Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
49Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface tretaed with Primer and clened with hydraulic broom as per technical specification aclouse 503.
50Mix Seal SurfacingProviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 Type B
51ii) Ordinary Kilometer Stone (Precast)
52iii) 200 m stone (Precast)
53(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
54Printing New Letters and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Clause 1701
55Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
56i) 600 mm equilateral & triangle
57iii) 600 mm circular
58v) 600 mm x 450 mm rectangular
59Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
60Planting of Trees and their Maintenance for one YearPlanting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year.
61Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104
62Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
63Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 )
64Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106
65Add Labour Cess @ 1%
66Add Seigniorage Fee @ 10% on Material Cost only
67Add GST @ 18%
68Maintenance cost of Road
69Add Labour Cess @ 1%
70Add Seigniorage Fee @ 10% on Material Cost only
71Add GST @ 18%
72Rwd road pakrailTokamat tolaSetting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
73Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
74Box Cutting:-Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
75Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 100 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess).60% QTY FROM EXCAVETED METARIAL From Box Cutting
76Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
77For 1000 m lead
78For 100 m lead
79Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
80Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
81Water Bound Macadam with Stone ScreeningsWBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
82Cement Concrete Pavement Construction of un-reinforced , dowel jointed at expansion and construction joint only , plain cement thickness as per design , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceeding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501.
83Dry Lean Cement ConcreteConstruction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and find aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15:1 aggregate gradation after blending to be as per table 600-1 cement content not to be less than 150kg/cum optimum moisture content to be determined during trial length construction, concrete strength not be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
84ii) Ordinary Kilometer Stone (Precast)
85iii) 200 m stone (Precast)
86(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
87Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
88Rumble StripsProvision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.
89i) 600 mm equilateral & triangle
90iii) 600 mm circular
91v) 600 mm x 450 mm rectangular
92Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
93Add Labour Cess @ 1%
94Add Seigniorage Fee @ 10% on Material Cost only
95Add GST @ 18%
96Maintenance cost of Road
97Add Labour Cess @ 1%
98Add GST @ 18%
99NH 31 deotha paharpur nabbed roadToBasudeopurSetting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
100Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
101Box Cutting:-Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
102Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 100 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess).60% QTY FROM EXCAVETED METARIAL From Box Cutting
103Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
104For 1000 m lead
105For 100 m lead
106Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
107Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
108Water Bound Macadam with Stone ScreeningsWBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
109Cement Concrete Pavement Construction of un-reinforced , dowel jointed at expansion and construction joint only , plain cement thickness as per design , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceeding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501.
110Dry Lean Cement ConcreteConstruction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and find aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15:1 aggregate gradation after blending to be as per table 600-1 cement content not to be less than 150kg/cum optimum moisture content to be determined during trial length construction, concrete strength not be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
111Brick Soling on Edge of CC PaymentLaying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with threewheel road roller 80-100 kN as per Technical Specification Clause 412
112Kilometer stone Reinforced cement concrete M15 grade kilometer local stone of standard design asper IRC:8 fixing in position including painting and printing , etc as per drawing and technical specification clause 1703.
113ii) Ordinary Kilometer Stone (Precast)
114iii) 200 m stone (Precast)
115(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
116Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
117i) 600 mm equilateral & triangle
118iii) 600 mm circular
119v) 600 mm x 450 mm rectangular
120Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
121Add Labour Cess @ 1%
122Add Seigniorage Fee @ 10% on Material Cost only
123Add GST @ 18%
124Maintenance cost of Road
125Add Labour Cess @ 1%
126Add GST @ 18%
127Panchayat pcc road near middle school katgharaTokatghara tola ward no 12Setting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
128Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
129Box Cutting:-Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
130Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 100 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess).60% QTY FROM EXCAVETED METARIAL From Box Cutting
131Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
132For 1000 m lead
133For 100 m lead
134Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
135Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
136WBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
137Prime Coat (Low porosity)Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
138Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface tretaed with Primer and clened with hydraulic broom as per technical specification aclouse 503.
139Mix Seal SurfacingProviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 Type B
140Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
141Water Bound Macadam with Stone ScreeningsWBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
142Cement Concrete Pavement Construction of un-reinforced , dowel jointed at expansion and construction joint only , plain cement thickness as per design , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceeding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501.
143Dry Lean Cement ConcreteConstruction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and find aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15:1 aggregate gradation after blending to be as per table 600-1 cement content not to be less than 150kg/cum optimum moisture content to be determined during trial length construction, concrete strength not be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
144ii) Ordinary Kilometer Stone (Precast)
145iii) 200 m stone (Precast)
146(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
147Printing New Letters and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Clause 1701
148Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
149i) 600 mm equilateral & triangle
150iii) 600 mm circular
151v) 600 mm x 450 mm rectangular
152Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
153Planting of Trees and their Maintenance for one YearPlanting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year.
154Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104
155Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
156Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 )
157Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106
158Add Labour Cess @ 1%
159Add Seigniorage Fee @ 10% on Material Cost only
160Add GST @ 18%
161Maintenance cost of Road
162Add Labour Cess @ 1%
163Add Seigniorage Fee @ 10% on Material Cost only
164Add GST @ 18%
165Patel Nagar RajdhanToBishvkarma Tola RajdhanSetting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
166Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
167Box Cutting:-Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
168Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 100 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess).60% QTY FROM EXCAVETED METARIAL From Box Cutting
169Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
170For 1000 m lead
171For 100 m lead
172Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
173Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
174WBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
175Prime Coat (Low porosity)Providing and applying primer coat with Bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
176Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface tretaed with Primer and clened with hydraulic broom as per technical specification aclouse 503.
177Mix Seal SurfacingProviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 Type B
178Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
179Water Bound Macadam with Stone ScreeningsWBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
180Cement Concrete Pavement Construction of un-reinforced , dowel jointed at expansion and construction joint only , plain cement thickness as per design , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceeding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501.
181Dry Lean Cement ConcreteConstruction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and find aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15:1 aggregate gradation after blending to be as per table 600-1 cement content not to be less than 150kg/cum optimum moisture content to be determined during trial length construction, concrete strength not be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
182ii) Ordinary Kilometer Stone (Precast)
183iii) 200 m stone (Precast)
184(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
185Printing New Letters and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Clause 1701
186Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
187i) 600 mm equilateral & triangle
188iii) 600 mm circular
189v) 600 mm x 450 mm rectangular
190Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
191Planting of Trees and their Maintenance for one YearPlanting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year.
192Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104
193Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
194Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 )
195Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106
196Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe
197Add Labour Cess @ 1%
198Add Seigniorage Fee @ 10% on Material Cost only
199Add GST @ 18%
200Maintenance cost of Road
201Add Labour Cess @ 1%
202Add Seigniorage Fee @ 10% on Material Cost only
203Add GST @ 18%
204Dakshin harizan Tola sahronTosahroun Harijan Tola uttarSetting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
205Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
206Box Cutting:-Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
207Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 100 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess).60% QTY FROM EXCAVETED METARIAL From Box Cutting
208Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
209For 1000 m lead
210For 100 m lead
211Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
212Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
213Water Bound Macadam with Stone ScreeningsWBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
214Cement Concrete Pavement Construction of un-reinforced , dowel jointed at expansion and construction joint only , plain cement thickness as per design , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceeding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501.
215ii) Ordinary Kilometer Stone (Precast)
216iii) 200 m stone (Precast)
217(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
218Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
219i) 600 mm equilateral & triangle
220iii) 600 mm circular
221v) 600 mm x 450 mm rectangular
222Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
223Add Labour Cess @ 1%
224Add Seigniorage Fee @ 10% on Material Cost only
225Add GST @ 18%
226Maintenance cost of Road
227Add Labour Cess @ 1%
228Add GST @ 18%
229Sahroun pcc Road ward no 1ToSharma Tola dakshin sahrounSetting Out Pillars :-Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I
230Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I
231Box Cutting:-Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
232Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 100 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5(Including Royality & Labour Cess).60% QTY FROM EXCAVETED METARIAL From Box Cutting
233Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m & 100 m as per Technical Specification Clause 301.5 .(Including Royality & Labour Cess).
234For 1000 m lead
235For 100 m lead
236Construction of subgrade and earthen shoulders:- with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess).
237Granular Sub-base with Well Graded Material (Table 400.1)For GradingI Material (With Stone Screening)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
238Water Bound Macadam with Stone ScreeningsWBM Grading 3 (By Machanical Means ) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
239Cement Concrete Pavement Construction of un-reinforced , dowel jointed at expansion and construction joint only , plain cement thickness as per design , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coarse and fine aggregate maximum size of aggregate not exceeding 25mm , mixed in a concrete of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork ( steel channel ,laying and fixing of 125 micron thick plythene film ,wedges ,steel plates including levelling the formwork as per drawing ) spreading the concrete with shovels , rakes , compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion , construction joints ,applying debonding strips , primer , sealant , dowel bars , near approaches to bridge/ culvert and construction joints, admixtures as approved , curing of concrete slab for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification clause 1501.
240ii) Ordinary Kilometer Stone (Precast)
241iii) 200 m stone (Precast)
242(I)Providing and Fixing \"Logo\" ofProject Providing and fixing of typical MMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1Providing and Fixing \"Logo\" ofProjectAs per DrawingCitizen Information Board As per Drawing5-Year Informatory Maintenance Board
243Boundary Pillar/Gaurd PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
244i) 600 mm equilateral & triangle
245iii) 600 mm circular
246v) 600 mm x 450 mm rectangular
247Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface & Cement Concrete Pavement Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
248Add Labour Cess @ 1%
249Add Seigniorage Fee @ 10% on Material Cost only
250Add GST @ 18%
251Maintenance cost of Road
252Add Labour Cess @ 1%
253Add GST @ 18%

AI Tender Summary

OUR REF NO 48765244
AUTHORITY Government Departments
TENDER VALUE 5.81 Crore
LAST DATE 24-04-2025
Authority
Authority Name Rural Works Department
Work Description Construction/UpgradationofNDBFundedMMGSYand their Maintenance for Five years
Basic Detail
Tender No NDB-BRRP2-788-GOGARI
Bidding Type Tender
Location
City gogri
State Bihar
Key Dates
Publish Date 18 Apr 2025
Submission Date 24 Apr 2025
Open Date 24 Apr 2025
Finance
Tender Value 5.81 Crore
Tender Fee 10000
EMD 11.63 Lakhs
Exemption Not Available
Document List
332e9476-f680-47ec-88ef-f8f5bce3377b.html
788SBD.pdf
BOQ_218945.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 18, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 24, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 24, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

332e9476-f680-47ec-88ef-f8f5bce3377b.html

pdf

788SBD.pdf

xls

BOQ_218945.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders