| 1 | Dismantlingbrick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60metres. |
| 2 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (as per S.I. No. 251) |
| 3 | Granular Sub-base with Well Graded Material (Table 400.1)By Mix in Place Method (Blanket coat)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 4 | Granular Sub-base with Well Graded Material (Table 400.1)By Mix in Place Method (GSB)Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. |
| 5 | Providing and Laying of Rubble moulded Zig Zag InterlockingConcrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
| 6 | Cement concrete with 4cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. .(S.I. NO-279) |
| 7 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work.(S.I. NO-305) |
| 8 | Cement concrete with 2cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 3:1.5:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (S.I. NO-279b) |
| 9 | Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. |
| 10 | 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 2 part of find sand of 1.25 fineness modulus. |
| 11 | Supply of M.S. Grill of a approved quality and drawing made of flat iron not bigger then 20x4 mm size including supply of materials, fabrication, labour, T&P and also one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site. |
| 12 | Providing & Planting of plant with iron Tree guard as per dirction of E/I . All lawn & plants maintenance free for three months after complation of works. |
| 13 | Supply of fixing of 10mm copper armed cable including all required material labour T&P etc for proper completion of the work. |
| 14 | Supply of fixing of granite stone bences including all mererial labour T&P etc. required for proper completion the work. |
| 15 | Painting work with enemal paint including all material labour T&P etc. required for proper completion of the work. |
| 16 | Supply& Fixing of inaguration BG stone including all material labour T&P etc. Required for proper completion of works as per direction of engineer in charge. |
| 17 | Cement concrete with 2cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. S.I no-279a |
| 18 | Providng and laying of 8 to 10mm thick ivory or light shade vitrified tiles of 600mm x 600mm size in flooring or skirting laid with 1 : 3 cement mortar (1 cement , 3 coarse sand) finishing with cement sturry & with pigment grouting & Polishing complete I/C S/O all material labour T & P etc. required for proper completion of work excluding base contrete. S.I. No- ch-14 Add New Item |
| 19 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. DSR-14.23 |
| 20 | Excavation in foundations in ordinary soil (Loam clay orsand) including lift upto 1.5 m.(5 fts.) and lead upto 30m.(100 fts.) & including filling. watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30 m.(100 fts.) from the foundation trenches. DSR-2.1.1 |
| 21 | Cartage of dismantied malba/earth including loading and unloading but excluding stacking. On pacca roads. Assume that 7 tonners truck will carry 4 cm Mater of material. |