| 1 | Dismantling reinforced cement concrete or reinforced brick work,i/c stacking of ……(SOR-694) |
| 2 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m. & lead upto 30m. Including filling , watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) (S.I.No-251) |
| 3 | Concrete with 4.00cm (1½\") gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of materials, labour T&P etc. required for the proper completion of the work. (S.I.NO-281) |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level (D.S.R. No-5.33.1/2018) |
| 5 | Mild steel or iron work or plain work such as RCC or RB work (when or included in all over rate ) wrought ironto required shape as necessary including bending for proper …DSR-5.22.6/2023 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Fo ndations, footings, bases of columns, etc. for mass concrete (D.S.R. No-5.9.1) |
| 7 | Construction of embankment with approved material obtained from pits…MORT&H specification |
| 8 | Construction of granular sub base by providing course graded materials spreading in uniform layers etc completed. SI 401 (Approved Rate) |
| 9 | P/L 125 micron polythene sheet as per direction of E/I(PWD SOR 2014) |
| 10 | P/L of Design Mix C.C M-30 Grade for Road as Per (D.S.R 2023/16.43.1) |
| 11 | Road cutting by Mechanical Equipment with all complete work…. |
| 12 | R.C.C Work in 1:1½ : 3in slabs.(SOR/ SNo 284 A)/2020 |
| 13 | Mild steel or iron work or plain work such as RCC or RB work (when or included in all over rate ) wrought ironto required shape as necessary including bending for proper …DSR-5.22.6/2023 |
| 14 | S/F of PVC pipe 160 mm kgpressure.. (SOR 2020/ SI No.Mat/30) |
| 15 | P/L of factory made 80mm thick rubber moulded interlocking Cement Concrete Tiles (30mpa) ncluding 25mm ...work.SOR New Item 1/2020 |