| 1 | Professional Staff : |
| 2 | Team Leader Cum Senior Highway Engineer |
| 3 | Senior Bridge Engineer |
| 4 | Highway cum Pavement Engineer |
| 5 | Material-cum-Geotechnical Engineer-Geologist |
| 6 | Senior Survey Engineer |
| 7 | Traffic and Safety Expert |
| 8 | Environmental Specialist cum Forest Expert |
| 9 | Quantity Surveyor/Documentation Expert |
| 10 | Land Acquisition Expert |
| 11 | Utility Expert |
| 12 | Sub Professional Staff : |
| 13 | Design Engineer |
| 14 | Drafts Person |
| 15 | Surveyor |
| 16 | Support Staff (To be assessed by consultant as per requirment) |
| 17 | Office Manager |
| 18 | Typist |
| 19 | Office Boy |
| 20 | Transportation :Vehicle provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. |
| 21 | For Conusltant: Innova or Equivalent (Not more than 2 years old) |
| 22 | Duty Travel to Site (Fixed Costs) : |
| 23 | Office Rent :(The rent cost includes maintenance, cleaning, repairs, etc. ) |
| 24 | Office Supplies, Utilities and Communication : |
| 25 | Office Supplies Drafting |
| 26 | Supplies Computer |
| 27 | Running Costs |
| 28 | Domestic & International Communication |
| 29 | Office Furniture and Equipment (Rental) : |
| 30 | Reports and Document Printing |
| 31 | Monthly Report (3 Per Month) |
| 32 | Inception Report & QAP |
| 33 | Environment and Social Impact Screening Report |
| 34 | Draft Feasibility Report |
| 35 | Final Feasibility Report |
| 36 | Strip Plan with L.A. Reports & Forest Reports |
| 37 | Draft Environmental Assessment report & RAP |
| 38 | Final Environmental Assessment report & RAP |
| 39 | Draft Detailed Design Report& Drawings etc. (& Draft EMP) |
| 40 | Draft Bidding Documents(& Draft EMP) |
| 41 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.(& Final EMP) |
| 42 | Final Bidding Documents |
| 43 | Survey and Investigation : |
| 44 | A. Topographical Survey : |
| 45 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer etc. |
| 46 | B. Investigation (Fixed Cost) |
| 47 | Road and Bridge Inventory |
| 48 | Material Survey and Investigation |
| 49 | Sub-grade Investigation & Geotechnical Investigation for all strutures |
| 50 | Traffic Survey |
| 51 | Socio-economic & Census Survey / Studies |
| 52 | C. Net Work Survey and GPR : |
| 53 | Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. |
| 54 | GPR Survey for detection of underground utilities. |
| 55 | Detailed Project Report preparation for Flyover in Portion if found feasible. |
| 56 | *Sub-Soil Investigation (Boring) for all structures if found feasible.a) Boring in all type of soils (other than hard rock): 500 mtr |
| 57 | b) Boring in Hard Rock : 100 Mtr |
| 58 | Cost of supply and fixing Boundary Pillars : |