Short Term Rate Contract For Loading, Unloading, Shifting And Transportation Including Round Trip Of Different Material From Outside And With In Bktpp Operational Area For Six Months-- 1 Transportation: Carriage of steel and steel materials including fabricated one by road outside of BKTPP 2 FOR 05 MT:Mode of transport: By truck - Upto 6 metre length and distance carriage upto 10 KM. Minimum chargeable tonnage is 5 MT/10 MT and minimum chargeable distance is 10 KM in case of truck.Mode of transport: By trailer - Above 6 meter length but upto 13.2 metres. Minimum chargeable tonnage is 18 MT& minimum chargeable distance is 10 KM in case of trailer (Certificates from the consignee officer regardingutilisation of trailer by contractor is required). 3 FOR 10 MT:Mode of transport: By truck - Upto 6 meter length and distance carriage upto 10 KM. Minimum chargeable tonnage is 5 MT/10 MT and minimum chargeable distance is 10 KM in case of truck.Mode of transport: By trailer - Above 6 meter length but upto 13.2 meters. Minimum chargeable tonnage is 18 MT and minimum chargeable distance is 10 KM in case of trailer (Certificates from the consignee officer regardingutilization of trailer by contractor is required). 4 FOR 18 MT:Mode of transport: By truck - Upto 6 meter length and distance carriage upto 10 KM. Minimum chargeable tonnage is 5 MT/10 MT and minimum chargeable distance is 10 KM in case of truck.Mode of transport: By trailer - Above 6 meter length but upto 13.2 meters. Minimum chargeable tonnage is 18 MT and minimum chargeable distance is 10 KM in case of trailer (Certificates from the consignee officer regardingutilization of trailer by contractor is required). 5 FOR 05 MT: For carriage beyond 10 KM & upto 50 KM 6 FOR 10 MT: For carriage beyond 10 KM & upto 50 KM 7 FOR 18 MT: For carriage beyond 10 KM & upto 50 KM 8 FOR 05 MT: Extra over item for “1.01” to “1.06” for every additional 1KM beyond 50 KM and upto 100 KM 9 FOR 10 MT: Extra over item for “1.01” to “1.06” for every additional 1KM beyond 50 KM and upto 100 KM 10 FOR 18 MT: Extra over item for “1.01” to “1.06” for every additional 1KM beyond 50 KM and upto 100 KM 11 FOR 05 MT: Extra over item for “1.01” to “1.09” for every additional 1KM and upto any distance beyond 100 KM 12 FOR 10 MT: Extra over item for “1.01” to “1.09” for every additional 1KM and upto any distance beyond 100 KM 13 FOR 18 MT: Extra over item for “1.01” to “1.09” for every additional 1KM and upto any distance beyond 100 KM 14 Transportation of all items except steel material and item covered under SL. No. 3 (Scope : Transportation of the above items from transporter’s Godown/Rail godown/Supplier’s godown/Power Station on road to BKTPP or from BKTPP to the above location for a maximum load of 1.5MT/5MT/10MT/above 10 MT 15 FOR 1.5 MT: BKTPP to Asansol (to and fro)(Distance-120KM) 16 FOR 5.0 MT: BKTPP to Asansol (to and fro)(Distance-120KM) 17 FOR 10 MT: BKTPP to Asansol (to and fro)(Distance-120KM) 18 FOR 1.5 MT: BKTPP to Durgapur/Raniganj(to and fro) (Distance-76KM) 19 FOR 5.0 MT: BKTPP to Durgapur/Raniganj(to and fro) (Distance-76KM) 20 FOR 10 MT: BKTPP to Durgapur/Raniganj(to and fro) (Distance-76 KM) 21 FOR 1.5 MT: BKTPP to Kolkata (to and fro) (Distance-226 KM) 22 FOR 5.0 MT: BKTPP to Kolkata (to and fro) (Distance-226 KM) 23 FOR 10 MT: BKTPP to Kolkata (to and fro) (Distance-226 KM) 24 For above 10MT charges will be on pro-rata basis. 25 For any other place not mentioned above, charge will be as per followings. FOR 5.0 MT: Carriage upto minimum chargeable distance 20 KM 26 For any other place not mentioned above, charge will be as per followings. FOR 10 MT: Carriage upto minimum chargeable distance 20 KM 27 For any other place not mentioned above, charge will be as per followings. FOR 5.0 MT: Carriage beyond 20 KM and upto 50 KM 28 For any other place not mentioned above, charge will be as per followings. FOR 10 MT: Carriage beyond 20 KM and upto 50 KM 29 For any other place not mentioned above, charge will be as per followings. FOR 5.0 MT: For carriage beyond 50 KM upto any distance 30 For any other place not mentioned above, charge will be as per followings. FOR 10 MT: For carriage beyond 50 KM upto any distance 31 For above 10MT charges will be on pro-rata basis. Crane if required to be used hire charges should be included @ Rs. 150.00 per MT of materials handled with submission of valid bill(For lifting of material outside BKTPP) 32 Carriage of Carbon dioxide and Nitrogen cylinders (maximum load of 60 cylinder)/H2(Maximum load of 100 cylinder)/Chlorine(Maximum 6 nos. toner). (Scope of works: Loading of empty cylinders from different points of BKTPP, carrying to manufacturers/suppliers works including unloading and loading and return with full cylinders and unloading to different point of BKTPP) 33 From BKTPP to Durgapur (to and fro) empty and filled cylinders 34 From BKTPP to Kolkata and adjacent areas ( to and fro) empty and filled cylinders (Distance 250 KM and above) 35 LOADING/UNLOADING AND STACKING OF MATERIAL AT DESTINATION:For Chemicals 36 Loading, unloading of drums from truck and stacking the same at BKTPS Store & Chemical area - Filled 37 Loading, unloading of drums from truck and stacking the same at BKTPS Store & Chemical area - Empty 38 Loading/ unloading, carrying, stacking of 200 litr. Jar loaded with chemicals: Jar loaded with chemicals. 39 Loading/ unloading, carrying, stacking of 200 litr. Jar loaded with chemicals:Empty Jar. 40 LOADING/UNLOADING AND STACKING OF MATERIAL AT DESTINATION:For Chemicals 41 Trolley Van 42 China Motor van / Toto 43 Small vehicles / Tempo 44 Full loaded Truck of capacity up to 4MT & above but below 10MT 45 Six wheeler vehicle having load upto 10 MT 46 10 wheeler vehicle and load more than 10 MT 47 Extra Rate of per MT.6wheeler vehicle and load more than 10MT 48 For the following materials though transported by above vehicles, but if not on full truck basis, then a separate rate would be given: CGI Sheet / Asbestos Sheet, MS pipe up to 100mm, GI pipe, Gratings 49 LOADING /UNLOADING, CARRYING, STACKING OF 50 Ordinary sizes Iron materials 51 SHIFTING OF MATERIALS WITH STACKING, WITH LOADING AT LIFTING POINT AND UNLOADING AT DESTINATION WITHIN FUNCTIONAL AREA OF BKTPS: 52 Shifting of steel and steel materials like MS rod, TMT bar, etc: Length of each piece being upto 6.0 meters 53 Shifting of steel and steel materials like MS rod, TMT bar, etc: Length of each piece being above 6.0 meters 54 Shifting of materials: Wooden poles/Timber/PCC Poles/Steel tubular Poles/ Wooden Sleepers etc. 55 Shifting of materials: RCC Poles 56 All materials other than those specified at Sl. No. “8.01” to “8.04”: Weight of each piece being less than or equal to500 kgs 57 All materials other than those specified at Sl. No. “8.01” to “8.04”: Weight of each piece being above 500 kgs but upto 1. 5 MT 58 All materials other than those specified at Sl. No. “8.01” to “8.04”: Weight of each piece being above 1.5 MT but upto 5 MT 59 All materials other than those specified at Sl. No. “8.01” to “8.04”: Weight of each piece being above 5 MT but upto 50 MT 60 SHIFTING OF MATERIALS WITH STACKING, WITH LOADING AT LIFTING POINT AND UNLOADING AT DESTINATION WITHIN FUNCTIONAL AREA OF BKTPS: 61 FOR 1.5 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 5 KM 62 FOR 5.0 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 5 KM 63 FOR 10.0 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 5 KM 64 FOR 1.5 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 10 KM 65 FOR 5.0 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 10 KM 66 FOR 10.0 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 10 KM 67 FOR 1.5 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 35 KM 68 FOR 5.0 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 35 KM 69 FOR 10.0 MT: Excluding loading/unloading (Transporting part): Up & down distance up to 35 KM 70 FOR 40 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance up to 5KM 71 FOR 80 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance up to 5KM 72 FOR 120 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance up to 5KM 73 FOR 40 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance up to 10KM 74 FOR 80 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance up to 10KM 75 FOR 120 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance upto 10KM 76 FOR 40 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance up to 35KM 77 FOR 80 NOS CYLINDERS: Excluding loading/unloading (Transporting part), For Cylinder basis (except Chlorine), Up & down distance up to 35KM 78 FOR 120 NOS CYLINDERS: Excluding loading/unloading (Transporting part),For Cylinder basis (except Chlorine), Up & down distance up to 35KM 79 For Drum (210 litr.) basis (25 drum): Up & down distance up to 5 KM, Excluding loading/unloading (Transporting part) 80 For Drum (210 litr.) basis (25 drum): Up & down distance up to 10 KM, Excluding loading/unloading (Transporting part) 81 For Drum (210 litr.) basis (25 drum): Up & down distance up to 35 KM, Excluding loading/unloading (Transporting part) 82 Lub. Drums/Chemical drums/Container, Full Drum (210 litre each): Only loading / unloading (Labour part)[payable as pro-rata basis]1LOT=25DRUM 83 Lub. Drums/Chemical drums/Container, Empty Drum (210 L cap.):Only loading/unloading(Labour part)[payable as pro-rata basis] 1LOT=25DRUM 84 Full gas cylinder: Only loading / unloading (Labour part) [payable as pro-rata basis] --- 1 LOT = 80 CYLINDER 85 Empty gas cylinder: Only loading / unloading (Labour part) [payable as pro-rata basis.] --- 1 LOT = 80 CYLINDER 86 Alum / Salt: Only loading / unloading (Labour part) [payable as pro-rata basis.] 87 Hydrated lime / Caustic soda flakes: Only loading / unloading (Labour part) [payable as pro-rata basis.] 88 Any type of scrap materials: Only loading / unloading (Labour part) [payable as pro-rata basis] 89 GST as applicable will be paid extra on production of proper documents. => Limited