}

Tender For Cooling Tower - Fill + Service - 19Mw - 1Item, Hazira-Gujarat

Arcelor Mittal Nippon Steel India Limited has published Tender For Cooling Tower - Fill + Service - 19Mw - 1Item. Submission Date for this Tender is 24-04-2025. Cooling Tower Tenders in Hazira Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

48749433
Tender For Cooling Tower - Fill + Service - 19Mw - 1Item
Open Tender
NCB
Gujarat
Hazira
24-04-2025

Tender Details

Tender For Cooling Tower - Fill + Service - 19Mw - 1Item 2 2000166248 10 30 10 COOLING TOWER PVC FILLS REPLACEMENT 1 LO Email : ROHIT.YADAV1@AMNS.IN Contact : Name : Rohit Yadav Item Details : --- Scope of work- Vendor 1) Safety is first condition for working at AMNSIL. Adhere <(>&<)> follow AMNS all safety standard during the work execution. 2) Removal of existing fill packs from cooling tower cell <(>&<)> installation of new fill packs. 3) Necessary arrangement for fill pack removal <(>&<)> installation like Ladder, covering platform to avoid dust ingress in sump, Man lifter, Trucks etc. will be in vendor scope (Except scaffolding) 4) Vendor must ensure correct pattern of fill packs arrangement during installation. 5) Fill pack replacement <(>&<)> installation services is only for one no. cooling tower cell. 6) Vendor must dispose removed/used fill packs from site immediately after replacement. 7) Required tools tackles, Full Body harness (with shock absorber) <(>&<)> Safety PPES are in vendor scope. 8) Vendor must complete removal of old fills and installation of new one in four days. More than stipulated time frame, it will attract suitable penalty. 9) Vendors need to submit four days detailed working schedule depicting each activity with resource, time <(>&<)> manpower deployment before starting job. (Day<(>&<)> might schedule). 10) Removal of fill pack dust cakes residues from cooling tower cell <(>&<)> site are in vendor scope. 11) Required arrangement for shifting of removed fill packs and dust cakes from site and its disposal as per guidelines are under vendor scope. 12) Maximum one-week time will be given at site for fill pack assembly job. Vendor must ensure correct pattern of fills during fill pack assembly job. 13) Fill pack size 2X1X4 FEET - Qty - 200 Nos for removal <(>&<)> installation. 14) Fill pack size 2X2X4FEET - Qty- 400 Nos for removal <(>&<)> installation. 15) Job should be carried out by only competent, skilled/experienced <(>&<)> physically fit manpower. 16) Vendors need to arrange Work at Height pass for their manpower as per AMNSIL safety guidelines. 17) New fill packs should not get damage during handling at the time of fill pack installation <(>&<)> vendor has to make immediate arrangement for damaged fill pack replacement if it is damaged by vendor. 18) Vendor has to clear cooling tower sump <(>&<)> cell from any fill pack residue, dust cakes, plate form, scaffolding or any other material used for job by vendor in given timeline of four days only. 19) Lodging, boarding <(>&<)> travelling are in vendor scope. 20) Vendor need to arrange gate pass for all manpower required for fill replacement as well as fill removal job from site. 21) Supervisor must be fit to work at height as per AMNS safety guidelines and available at site during job execution. 22) Vendor must remove cooling tower nozzles and diffuser rings before starting fill pack replacement job and again fix it as per correct pattern. 23) Vendor must ensure not to damage any other spares of cooling tower during fills replacement and fills discarding job. 24) FRP helmet, Safety goggle <(>&<)> safety shoes are mandatory PPEs for working at AMNSI site. 25) Apart from mandatory PPEs, vendor must use job specific PPEs such as full body harness with shock absorber for working at height, Chemical resistance gloves <(>&<)> nose mask for fill pack gluing job. -- Movement of Manpower / Associates at our Hazira Site. Page 2 of 2 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000132432 Date 17.04.2025 Submission Date 24.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Anand Talabhatula Contact Email anand.talabhatula@amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass --- Scope of Work- AMNSIL 1. To issue work permits and ensure work to be carried out in a safe manner. 2. Necessary utility supply arrangements for job execution. 3. Fixing of scaffolding at cooling tower cell for fills replacement requirement. 4. Material – fill pack and glue. --- Specific Penalty for non-performance by vendor and must be cardinally measured. Due to non-performance which leads to unnecessary delay in job, unavailability of skilled manpower, poor quality job Vendor will be penalized from his Bill according to criticality of reasons

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail