| 1 | Dismentalement Charges of 22kV HT line. |
| 2 | Dismentalement charges of ST poles D/Pole Str. (with complete accessories.) |
| 3 | Erection of 22kV H.T Line |
| 4 | Erection of 10mtr. Long ST pole. |
| 5 | Erection of pole.Digging of pit,(ii) Laying of RCC muff (iii) Drilling of holes in X-bracing set, X-arms (iv) Erection of pole (v) fixing of insulator,X-arm, Knee bracing set, Top Clamp (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming i/c painting of pole S/Pole str. (Complete in all respect). |
| 6 | Re erection/erection of stay set (HT). |
| 7 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 8 | SAGGING OF ACSR CONDUCTOR 6/1/3.35mm (Single wire). |
| 9 | stringing & sagging, Binding with insulator (only). |
| 10 | Manual Carriage of material |
| 11 | For 1 KM H.T Line considering average distance from road to site of work 2.100 KM |
| 12 | Steel tubular pole. |
| 13 | Other line material. |
| 14 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 15 | Prov. Nuts & bolts. |
| 16 | Prov. Aluminium paint. |
| 17 | Prov. RCC Muffs 2Mtr. |
| 18 | Prov. Stay Clamp |
| 19 | Prov. Egg Insulator (HT) |
| 20 | Prov. stay Wire (7/3.15mm) |
| 21 | Prov. Disc Insulator sets on Dead End Str (Disc porcelain, BS 12KV, 90KN, including Dead End Clamps etc). |
| 22 | Prov. 22KV Pin Insulators (Porcelain,24Kv,10KN) with GI Pin. |
| 23 | Prov. Top Pole Bracket (on single pole Str.) |
| 24 | Prov. MS Angle Iron (50X50X6mm), Length: 2X950mm. |
| 25 | Dismentalement Charges of LT line. |
| 26 | Dismentalement charges of ST poles 8/9Mtr. (with complete accessories.) |
| 27 | De-saggingof ACSR conductor 6/1/2.59mm. (Removal of conductor & De stringing only) |
| 28 | ERRECTION OF L.T LINE ON 8/9Mtr. Long S.T pole. |
| 29 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles.Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 30 | ERRECTION OF STAY SET |
| 31 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 32 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). |
| 33 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 34 | Manual Carriage of material. For 1 KM L.T Line considering average distance from road to site of work 1.500 KM |
| 35 | Steel tubular pole 8/9 mtr. long. |
| 36 | Other line material. |
| 37 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 38 | Prov. RCC Muffs 2Mtr. |
| 39 | Prov. LT stay set. |
| 40 | Prov .Shakle Insulator (16KN) |
| 41 | Prov .D-Iron (U-Clamps) |
| 42 | Prov. Nuts & bolts. |
| 43 | Prov. Aluminium paint. |
| 44 | Prov. Stay clamp |
| 45 | Providing Egg Insulator. |
| 46 | Prov. stay Wire (7/3.15mm) |