| 1 | Transportation of Rig Machine from district hade quarter mau to tubewell site. |
| 2 | Transportation of T&P of Rig Machine from store mau to site by Truck and return trip of empty truck from site to store. |
| 3 | Loading & unloading of T&P as item no.- (ii) |
| 4 | Toeingof Welding plant by Tractor from district hade quarter Mau to site |
| 5 | Transporation of Air Compressor from store mau to tubewell site by Tractor and return trip of Tractor from site to store. |
| 6 | Transportation of T&P of Air Compressor by Truck and return trip of empty truck from site to store |
| 7 | Loading & unloading of T&P of Air Compressor as item no.- (ii) |
| 8 | Transportation of T&P of O.P. Unit by Truck and return trip of empty truck from site to store |
| 9 | Transportion of O.P. unit by Tryck and return trip empty |
| 10 | Loading & unloding of T&P of O.P. unit as item no ii |
| 11 | Transportation of T/w assembaly hade quarter frommau to Tubewell site by truck in ltrips and return trip of empty truck from site to store. |
| 12 | Loading & unloading of T/W assembaly |
| 13 | 625 mm. dia size from G.L. to 48 m. BGL. |
| 14 | 500 mm. dia size from 485 m. BGL. to 80 m. BGL. |
| 15 | 500 mm. dia size from 80 m. BGL.to 120 m. BGL. |
| 16 | 500 mm. dia size from 120 M. BGL. to 160 m. BGL. |
| 17 | 500 mm. dia size from 160 m. BGL. to 200 m. BGL. |
| 18 | 500 mm. dia size from 200 m. BGL. to 240 m. BGL. |
| 19 | 500 mm. dia size from 240 m. BGL. to 275 m. BGL. |
| 20 | Lowering of 300 mm. dia Housing Pipe from G.L. to 48M. BGL. |
| 21 | Lowering of 150 mm. dia Plain/Slotted Pipe from 42M. to 80 m. BGL. |
| 22 | Lowering of 150 mm dia Plain/Slotted Pipe from 80 m. to 120 m. BGL. |
| 23 | Lowering of 150 mm dia Plain/Slotted Pipe from 120 M. to 160 M. BGL. |
| 24 | Lowering of 150 mm dia Plain/Slotted Pipe from 160 M. to 200 M. BGL |
| 25 | Lowering of 150 mm dia Plain/Slotted Pipe from 200 M. to 240 M. BGL and shrouding of pea Granel. |
| 26 | Lowering of 150 mm. dia dia Plain/Slotted Pipe from 240 M. to 250 M. BGL. |
| 27 | 300 mm. dia MSERW Housing Pipe thickness 7.1 mm |
| 28 | 150 mm. dia M.S. Plain Pipe thickness 7.1 mm |
| 29 | 150 mm. dia M.S. Slotted Pipe thickiness 7.1 mm |
| 30 | 300×150 mm. dia M.S.Reducer made by 12mm M.S Plate |
| 31 | 150 mm. dia.Bail Plug made by 12 mm M.S. Plate |
| 32 | 300 mm. dia M.S. Clamp made by 12 mm M.S. Plate |
| 33 | 300 mm. dia Well Capmade by 12 mm M.S. Plate |
| 34 | 300 mm. dia M.S. Ring 125 mm wide 12 mm Thick |
| 35 | 150 mm. dia MS Ring 100 mm. wide 12 mm. Thick |
| 36 | 300 mm. dia tube well assembly supporting frame structure fabricated by 150 mm. × 3 mts. long MS channel |
| 37 | Center guide M.S. Ring of 150 mm. size |
| 38 | Over to 1.60 mm. to 4.80 mm. size pea gravel of Lalkuwan quarry duly screened, washed and proper stacking at site. |
| 39 | Installation of compressor including leveling & dressing of site and camp equipage. |
| 40 | Development of T/W by 600 P.S.I. Air Compressor. |
| 41 | Sodium Hexametaphasphate |
| 42 | Dismantling of Air Compressor after completion work |
| 43 | Installation of O.P. Unit including leveling and dressing of site and camp equipage. |
| 44 | Development of T/W by O.P. unit |
| 45 | Geophysicl logging of bore hole by electric logging machine. |
| 46 | Submersible pump set suitable for pumping clear and cold water with bronze impeller confirming to grade LTB2 and shaft conforming to grade AISI 410 and builtin non- return valve of Discharge 1000 lpm, head45 m 2900 rpm coupled with Electric motor confor |
| 47 | Switch Gear comprising of three phase main switch fuse unit, single phasing preventer, suitable size capacitor and Auto transformer starter suitable for 20 H.P., metering equipment with internal wiring along with no volt & over load relays etc complete in |
| 48 | Main piping & valves with 100 mm dia 30 mts. M.S. Flanged column pipe with 100 mm dia sluice valves, Reflex valves, Tee, Bend, D/F Pipe, M.S. Clamp, Orifice pipe, Nut bolts etc. |
| 49 | Commissioning, Trial and Testing |
| 50 | Two coat Painting of pumping Plant with approved anticorrosive and specified color paint. |
| 51 | One month watch and ward during the period of Installation. |
| 52 | S/F Submersibal Cable 6 mm 3 Core Copper |
| 53 | S/F cable 12 mm 4 core |
| 54 | Supply of Fixing of Bord/silapatt including all materials etc. |
| 55 | Building work, Pump Housh Including all materials, Labour & all complete etc. |
| 56 | Add GSt 18% |