| 1 | Earthwork in cutting or in embankment in ordinary soil excavation to be the form of regular pit not exceeding 1/2 meter in depth and e/w in embankment to be in 20cm layers,i/c ramming/rolling and dressingthe surface to required levels and slopes and also including 1.5m lift and 30 m lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the E/I. |
| 2 | Construction of granular sub-base by providingready mix material spreading in uniform layers with motor grader on prepared surfaceand compacted with 80-100 KN Smooth wheel static rollar to achieve the desired density at OMCcomplete as per Technical specification Clause 401. |
| 3 | Providing, laying, spreading and compacting stone aggregates of 63 mm to 45 mm sizes to water bound macadam (WBM II) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.. |
| 4 | Providing, laying, spreading and compacting stone aggregates of 53 mm to 22.4 mm sizes to water bound macadam (WBM III) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(WBM III) |
| 5 | Providing and applying primer coat with Slow Setting bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.700 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 6 | TACKCOAT: Providing and applying tack coat withBitumen VG-10 using emulsion distributor at the rate of 0.35 Kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates (Dalla aggregate) using VG-10 grade bitumen @ 1.46 Kg / sqm to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type c as per Technical Specification Clause 508. |
| 8 | Providing and laying seal coatType C sealing the voids in a bituminous surface with crushed stone chipping of 6.7 mm size defined as 100 % passing through 9.5 mm sieve & 100 % retained on 2.36 mm sieve applied @ 0.09 cum / 10 sqm & Bitumen VG-10 @ 6.50 kg / 10 sqm on bituminous surface laid to the specified levels, grade and cross fallas per Technical Specification Clause 510 |
| 9 | Earthworkon Patari ordinary soil excavation to be the form of regular pit not exceeding 1/2 meter in depth and e/w in embankment to be in 20cm layers,i/c ramming/rolling and dressingthe surface to required levels and slopes and also including 1.5m lift and 30 m lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the E/I. |
| 10 | Excavation in foundation in soil mixed with moorum/kanker/B.C soil etc. requiring the use of special T&P such as pickaxe, subbalsetc.including lift up to 1.50 Mandlead up to 30 M complete as per direction of E/I. and as per S.I. No. 252 |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ( PCC grade- M 10 ) (Nominal Mix 1:3:6) |
| 12 | C.R. with cement and coarse sand mortar in the proportion of 1:4 respectively in foundation & plinthincluding costof all material, labour, T&P etc. required for proper completion of the work. |
| 13 | C.Cwith cement, coarse sand and 20 mm gauge stone ballast in the proportion of 1:2:4 respectively including cost of material, labour, T&P etc. required for proper completion of the work |
| 14 | Supplying, laying, jointing and fixing of 900 mm dia NP3 class hume pipe with collar including its cost and carriage upto site etc complete as per direction of E/I. |
| 15 | Supplying, laying, jointing and fixing of 600 mm dia NP3 class hume pipe with collar including its cost and carriage upto site etc complete as per direction of E/I. |
| 16 | 15 MM thick plaster with cement and fine sand mortar in the proportion of 1:4 respectively including all material, labour, T&P etc. complete as per direction of E/I. |
| 17 | Raised cement pointing with cement and fine sand mortar in the proportion of 1:3 respectively over stone masonary including all material, labour, T&P etc. required for proper completion of work. |