Improvement To Bt Roads At Selvapuram 3Rd Cross Road 167004S011,Sathya Sai Nagar Main Road 167004R1049,Sathya Sai Nagar Extension Main Road 167004R1050,Sathya Sai Nagar Extension, 2Nd Cross Road 167004R1051,Vip Nagar 4Th Cross Main Road 167006R184,Vip Nag
Tender Overview
Project Description
Improvement to BT roads at Selvapuram 3rd cross road 167004S011,Sathya Sai Nagar Main Road 167004R1049,Sathya Sai Nagar Extension Main Road 167004R1050,Sathya Sai Nagar Extension, 2nd Cross Road 167004R1051,VIP nagar 4th cross main road 167006R184,VIP Nagar Main Road 167005R1142,VIP Nagar 1st Cross Road 167005R1143,VIP nagar 3rd cross main road 167006R183,Manikandan Nagar 10th Cross Road 1st Cross Road-2 167005R1159,Manikandan Nagar 4th Cross Road 167005R1160,Madheswaran kovil 2nd cross road (near AVK water service) 167006R220,Oor gowder street 16th cross 167006R202,Oor gowder street 7th Madheswaran kovil cross road to Sugumaran house 167006R193,Pavendar nagar main road 167006R205,Sri Ram Nagar 2nd Cross Road 167006R1202,Sri Ram Nagar 2nd Cross 1st Road 167006R1228 in Karamadai Municipality.
BOQ
| Sl. No. | Item Description |
| 1 | Advance Patch work 13.20mmProviding Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labourcharges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications |
| 2 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2kgs of bituminous Emulsion (RS)for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications |
| 3 | Providing and laying 50mmconsolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20 -2.36mm and 0.23 cum of 2.6mm & below and with 53.20 kgs of VG30/ VG 40 bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 505 MORTHRev-5 |
| 4 | Providing and laying Bituminous Concrete to 30mmthick using 0.13cum of 19.00- 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26 cum of 2.36mm & below and with 50.30 kgs of VG30/ VG 40 bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 40mm withmechanical paver to the specified grades and cross sections andconsolidated by 8-10 tonevibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 507 MORTHRev-5 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender