| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1 |
| 2 | Removing of old white or colour wash by scraping sand papering and preparing the surface smoothincluding necessary repair to scratches etc. complete as per DSR-2023 S.I.No-13.88 |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead as per DSR-2023 S.I.No.15.56. |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar as per DSR-2023 S.I.No.15.7.4. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per DSR-2023 S.I.No. 4.1.8 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) as SI No-5.2.2 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level & above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. SI .No. 5.22A.6 |
| 8 | Brick work with common burnt clay (non modular) bricks of designation-7.5in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per DSR-2023 SI No- 6.1.1 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) as per DSR-2023 S.I.No.6.4.1. |
| 10 | 12 mm cement plaster of mix in 1:4 (1 cement: 4 coarse sand) as per DSR-2023 S.I.No.13.4.1 |
| 11 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coats applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) as per DSR-2023 S.l. No.13.46.1 Two Coats |
| 12 | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer,over the plasterd wall surface even and smooth surface as perDSR-2023 S.l. No.13.80 |
| 13 | Supply at site Angle Iron Post & stru of required size including bottom to be split and bent at right angle in oppositedirection for 10 cm lengrh and drilling holes upto 10 mm dia as perDSR-2023 S.l. No.16.19. |
| 14 | Fencingwith G.I. Barbed wire with Angle Iron post placed at required distance embeded in cement concrete blocks, every 15 th post, last but one end post and corner post shall be strutted on both side and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wire, of barbed wire weighing 9.38 kg per 100 M.length ,between the two postfitted and fixed with G.I.Staples, turn bucket etc. complete ( excluding cost of posts, struts, earthwork & conctrete work ). as per DSR-2023 S.I.No.16.18.1. |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture asper DSR-2023 S.I.No.13.62.1 |
| 16 | Supply and fixing of M.S sign board of prescribed size 1.20m *2.75 m with angle 40*40*6 mm iron angle and 1 mm thick ms iron sheet including painting and letter writing complete. As per SE RED Meerut, Sanction letter No.1108 Dated 09.10.18 |
| 17 | AddGST 18% Rs |