| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. By Mechanical Means.Item / Page No : 11 / 23Specification No : MORTH-301Spec. Page No : 45-53 |
| 2 | Providing soling using 80 milimetre size trap metal in 15 centimetre layer including filling voids with crushed sand / grit, ramming, watering, excetra complete.Item / Page No : 40 / 118Additional Specifications : The work shall be carried out as per instructions of Engineer in-charge. |
| 3 | Providing and laying Cast in situ/Ready Mix, cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailling out water, formwork, laying/ pumping, compacting and curing, excetra complete, with fully automatic micro processor based Programmable Logic Controller with Supervisory Control and Data Aquisition enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) excetra complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed, excetra)Item / Page No : 1 / 131Specification No : Bd.E.1Spec. Page No : 287 - 288Additional Specifications : 1. With additional specifications for controlled concrete.2. If artificial / VSI crushed sand is used instead of natural sand; terms, conditions and specifications mentioned in Circular by Chief Engineer, Public Works Region, Pune bearing No CEP/D-2/Buildings-2/5940/2017 dated 17/10/2017 and Annexure-I attached to it and also Circular by Chief Engineer, Public Works Region, Nagpur bearing No 36 dated 15/01/2019 and Annexure-I attached to it will be appicable. |
| 4 | Providing and laying Cast in situ / Ready Mix cement concrete M-15 of trap / granite / quartzite / gneiss metal for bed blocks, foundation blocks and such other items including bailling out water, plywood / steel formwork, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing, excetra complete. The cement mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin, excetra (Wooden centering will not be allowed.) with fully automatic micro processor based Programmable Logic Controller with Supervisory Control and Data Aquisition enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) excetra complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc)Item / Page No : 8 / 131Specification No : Bd.E.4,B-7Spec. Page No : 289 - 290,38-40Additional Specifications : 1. With additional specifications for controlled concrete.2. If artificial / VSI crushed sand is used instead of natural sand; terms, conditions and specifications mentioned in Circular by Chief Engineer, Public Works Region, Pune bearing No CEP/D-2/Buildings-2/5940/2017 dated 17/10/2017 and Annexure-I attached to it and also Circular by Chief Engineer, Public Works Region, Nagpur bearing No 36 dated 15/01/2019 and Annexure-I attached to it will be appicable. |
| 5 | Providing and fixing heavy duty inter locking concrete rubber mould glossy paving blocks of 80 milimetre thickness of having a strength of 400 kilogramme per square centimetre of approved quality and shape on a bed of crushed sand of 25 milimetre to 30 milimetre thick including striking joints and cleaning, excetra complete.(using 100 percent crushed sand)Item / Page No : 54 / 160Specification No : Bd.MSpec. Page No : ---Additional Specifications : The work shall be carried out as per instructions of Engineer in charge. |
| 6 | Providing and fixing Road junction / Information sign board of size 0.90 metre X 0.60 metre prepared on 16 gauge mild steel sheet with angle iron frame of size 35 milimetre X 35 milimetre X 5 milimetre including painting with one coat of zinc cromate stoving primer and two coats each of green/ white back ground and back side gray stove enamelled, bonded with red retro-reflective sheet Engineering grade, border / letters / numeral / arrows, coated with non pealable crystal clear protective coat retaining 100 percent reflection including two angle iron post of size 50 milimetre X 50 milimetre X 5 milimetre of 3.65 metre long inflated at bottom drilled on top and painted in white and black bands of 30 centimetre. with 4 numbers high strength galvanised iron bolts and nuts of size 10 milimetre diameter and 20 milimetre long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete 1:4:8 block of 60 centimetre X 60 centimetre X 75 centimetre size as directed by Engineer-in-charge, excetra complete. Mild Steel Board with Engineering Grade.Item / Page No : 47 / 49Specification No : MoRTH-801Spec. Page No : ---Additional Specifications : The work shall be carried out as per instructions of Engineer in charge. |
| 7 | Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. (This Item is to be paid to the contractor only after he pays the Royalty amount to Revenue department and produces the required voucher.)Item / Page No : 3 / 0Additional Specifications : 1. Government of Maharashtra, Revenue and Forest Department Gazette Number 146 Dated 04/06/2021 and Government of Maharashtra Public Works Department State Schedule of Rates 2021-22 General Note Number A(v), Page 5.2. The amount of royalty charges will be paid only after submission of the receipt in original from Revenue authority for payment of royalty to Government, stating the name of work.3. Above / below percentage quoted by the contractor will not be applicable for this item. |
| 8 | Laboratory testing charges for various materials required for items of work, on the basis of testing frequency and charges fixed by Vigilence and Quality Control Circle, Pune.Item / Page No : 4 / 0Additional Specifications : 1. The amount of laboratory testing charges will be paid to contractor only after submission of the original receipt from the Vigillence and Quality Control Office with the name of work mensioned on it.2. Above / below percentage quoted by the contractor will not be applicable for this item. |
| 9 | Add insurance 0.50%Non-Dsr ItemAdditional Specifications : The work shall be carried out as per the instructions of Engineer in-charge. |
| 10 | Add G.S.T. 18%Non-Dsr ItemAdditional Specifications : The work shall be carried out as per the instructions of Engineer in-charge. |