Tender For Cleaning/De-Silting Of Various DRAINS In Charkhi Dadri City.-- 1 HSR Item 4.14.1-Earth work in excavation by mechanicalmeans (Hydraulic excavator) / manual means in foundationtrenches or drains (not exceeding 1.5 m in width or 10 sqm onplan), including dressing of sides and ramming of bottoms, liftup to 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of50 m. 1. All kinds of soil.HSR Rate(Rs.) 83.00 Through Rate 2 HSR Item 6.34.3-Steel reinforcement for R.C.C. work, wherenot included in the complete rate of RCC, includingstraightening, cutting, bending, placing in position, binding,wastage, overlaps, welded joints, spacer bars, chairs, stays,hangers and annealed steel wire etc. complete in all respectabove plinth level Note:- Reinforcement shall be measured inlength including hooks, if any, separately for differentdiameters as actually used in work , excluding overlaps.Wastage, overlaps, couplings, welded joints, spacer bars,chairs, stays, hangers and annealed steel wire or othermethods of binding & placing shall not be measured and costof these items shall be deemed to be included in the rates forreinforcement. 3. Cold twisted barsHSR Rate(Rs.) 68.00 Through Rate 3 HSR Item 6.30.3-Centering and shuttering including strutting,propping etc. and removal of form for 3. Suspended floors,roofs, landings, balconies and access platformHSR Rate(Rs.) 208.00 Through Rate 4 HSR Item 6.16-Reinforced cement concrete work in beams,suspended floors, roofs having slope up to 15° landings,balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level up to floorfour level, excluding the cost of centering, shuttering, finishingand reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).HSR Rate(Rs.) 6113.00 Through Rate 5 HSR Item 11.11.2-12 mm cement plaster finished with afloating coat of neat cement of mix : 2. 1:4 (1 cement: 4 finesand)HSR Rate(Rs.) 135.00 Through Rate 6 HSR Item 7.20.1-Brick work with common burnt clay modularbricks of class designation 10.5 in foundation and plinth in: 1.Cement mortar 1:4 (1 cement : 4 coarse sand)HSR Rate(Rs.) 4287.00 Through Rate 7 HSR Item 13.29.2-Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer usingstructural steel etc. as required. 2. In gratings, frames, guardbar, ladder, railings, brackets, gates and similar worksHSR Rate(Rs.) 83.00 Through Rate 8 HSR Item 14.67-Hoisting and placing precast R.C. concreteslab or stones in position on outlets or W.C. culverts bymechanical/ mannual meansHSR Rate(Rs.) 81.00 Through Rate 9 HSR Item 3.1.3-By Mechanical Transport including loading,unloading and stacking 3. Manure or sludgeHSR Rate(Rs.) 108.00 5km