| 1 | Name of the Work : Improvements of Pond, Construction of Bathing Ghat, Liningwall, Teowall & Strengthining the Bund at Sivayam Kuttai, H/o. Thimmampatti - Under AGAMT - II - 2025-26 |
| 2 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc.Pg 27 PWD (W-0003), |
| 3 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification Pg No 30 ( W-0085) PWD - Pond, Main Pond & Baby Pond |
| 4 | Construction of Lining wall at Sivayam Kuttai H/O Thimmampatti |
| 5 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 6 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge handbroken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying withstandard specfication |
| 7 | Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical |
| 8 | Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge handbroken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying withstandard specfication |
| 9 | Construction of Bathing Ghat at Sivayam Kuttai H/O Thimmampatti |
| 10 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification etc complete |
| 11 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 12 | Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 13 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Ht for plain surfaces including struting etc., complete. |
| 14 | Provision for Writing Name Board |
| 15 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks.at 18 % GST. |