Name of Work: Annual Maintenance of NavigationalAids at Kadmath, Kiltan, Chetlat & Bitra Islands for the Year 2025 – 26
Sl. No.
Item Description
1
Installationofchannel marker buoy/ skirt keel buoys/ twin point mooring buoy removed from the channel before monsoon Agathiincluding transporting the buoys and accessories from dept stack yard to installation point,all labour charges minor tool, hire charges of boat, etc complete
2
Twin point Mooring Buoy
3
Kadmath
4
Bitra
5
Kiltan
6
Chetlath
7
Channel Marker Buoy
8
Kadmath
9
Buoy with in lead of 1KM
10
Buoy above 1KM lead
11
Bitra
12
Buoy with in lead of 1KM
13
Buoy above 1KM lead
14
Kiltan
15
Buoy with in lead of 1KM
16
Buoy above 1KM lead
17
Chetlath
18
Buoy with in lead of 1KM
19
Buoy above 1KM lead
20
Removal ofchannel marker buoy/ skert keel buoys/ twin point mooring buoy from installation positionin the lagoonof Agathi and bangaram and transporting the same to seashore and stacking dept yardproperly as per direction of engineer in charge etc completeincluding cost of all labour charges minor tool, hire charges of boat etc complete(beforemonsoon during May 2025
21
Twin point mooring buoy
22
Kadmath
23
Bitra
24
Kiltan
25
Chetlath
26
Channel marker buoy
27
Kadmath
28
Buoy with in lead of 1KM
29
Buoy above 1KM lead
30
Bitra
31
Buoy with in lead of 1KM
32
Buoy above 1KM lead
33
Kiltan
34
Buoy with in lead of 1KM
35
Buoy above 1KM lead
36
Chetlath
37
Buoy with in lead of 1KM
38
Buoy above 1KM lead
39
Chipping, Scrapping and thoroughly cleaning the old steel surfacewith chipping hammer, scrapper etc; and cleaning with wire brush and cotton wasteand painting the external surface of twin point mooring buoyfrom lagoonwith one coat of primer followed by two coats of approved/anticorrosive/epoxy black paint and white paint providing liners one after another on top as triangular and sides of equal length and width as directed by the Engineer-in-charge including cost of all labour charges, cost of paint, painting brush minor tools like scrapers wire brushchipping hammer and transportation charge of materials to work site etc. complete ( After monsoon during August 2025)
40
Twin point mooring buoy
41
Kadmath 1no (in lagoon) 10Sqm/job
42
Bitra 1no (in lagoon) 10Sqm/job
43
Kadmath 1no (Yard)
44
Chetlath 2no (Yard)
45
Kiltan 1No (Yard)
46
5000 DWT Mooring Buoy
47
Kadmath 1no (in lagoon) 10Sqm/job
48
Bitra 1no (in lagoon) 10Sqm/job
49
Kadmath 1no (Yard)
50
Painting out side surface of channel marker buoy withtwo coats ofmarine quality antifouling bitumen based colour paints over old surfaceas directed by the Engineer in Charge including cost of all labour charges, painting, cost of colour paints and thinner brushes, minor tools etc; complete(After monsoon during May 2025)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.