|
| 1 | Improvements of Samathuva Burial Ground atModugulahalliH/O Modugulahalli. |
| 2 | Construction of Waiting Shed |
| 3 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary as per SS 20 B |
| 4 | Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. |
| 5 | Cement concrete 1:2:4 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. |
| 6 | Brickwork in CM 1:5 mix using new country bricks including cost and conveyance of all materials to site and alllabour charges for mixing, laying and curing etc., complete. |
| 7 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X \"3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. |
| 8 | Column upto Gl |
| 9 | Column |
| 10 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors etc., complete |
| 11 | Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 12 | Plastering with cm 1:3 mix using 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 13 | Plastering with cm 1:5 mix ( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 14 | Weathering Course with Brick jelly lime concrete 20mm thickincluding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 15 | Pressed tiles with Brick jelly lime concrete 20mm thickincluding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 16 | Granolethick floor finish in CM 1:2:4 mix using 10-12mm thickincluding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 17 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete . |
| 18 | Construction of Compound wall |
| 19 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary as per SS 20 B |
| 20 | Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. |
| 21 | Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 22 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X \"3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. |
| 23 | Column upto Gl |
| 24 | Column |
| 25 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors etc., complete |
| 26 | Brickwork in CM 1:5 mix using country bricks 23x11/x7 cm including cost and conveyance of all materials to site and alllabour charges for mixing, laying and curing etc., complete. |
| 27 | Brick Partition Wall in CM 1:3 mix using new country bricks 83/4\"x41/\"x23/4\" including cost and conveyance of all materials to site and alllabour charges for mixing, laying and curing etc., complete. |
| 28 | Plastering with cm 1:5 mix ( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 29 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete . |
| 30 | Providing Cement Concrete Pavement |
| 31 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary as per SS 20 B |
| 32 | Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. |
| 33 | CENTERING BELOW GL: Supplying and erecting CENTERING for sides of road kerb walls including all cost etc., Complete |
| 34 | Cement concrete 1:3:6 mix using 20mm gauge hard broken granite stone including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. |
| 35 | Cement concrete 1:2:4 mix using 20mm gauge hard broken granite stone including cost and conveyance of all materials to site labour charges for laying consolidation curing etc. |
| 36 | Provision for Name Board |
| 37 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |