|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. |
| 2 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, rammingcompleteincludingthecostofsupply of sand. (payment to bemade on measurement of finished quantity)Do - by fine sand |
| 3 | Supplyingand laying Polythene Sheet (150gm/ sq.m.) over dampproof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 4 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor [Pakur Variety] , 1:3:6 proportion. |
| 5 | Ordinary Cement concrete (mix1:1.5:3) with graded stone chips (20mm nominal size)excluding shuttering and reinforcement ifany, ingroundfloor as per relevant IS codes. Pakur Variety |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)Steel shuttering or 9 to12 mm thick approved quality ply board shuttering in any concrete work. |
| 7 | 25 mm to 30 mm shuttering without staging in foundation |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary),cutting to requisite length,hookingand bending tocorrect shape, placing in proper position and binding with16 gauge black annealed wire at every intersection, complete as per drawing and direction.Tor steel/Mild Steel |
| 9 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming toIS:226, IS:808&SP(6)-1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in charge complete including cutting to requisite shape and length, fabrication with necessary bolting,metal arc welding conforming to IS:816-1969&IS:1995 using electrodes of approved make and brand conforming to IS:814-2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes,gas and hire charge of all tool sand plants and labour required for thework including all incidental chages such as electricity charges, labour insurance charges etc.For structuralmembersof specifiedsectionsweighing less than 22.5 Kg./m |
| 10 | GST-18% (SGST=9% & CGST=9%) ADD |
| 11 | LABOUR WELFARE CESS = 1% ADD |