|
| 1 | Name of work : Rajuvenation of Murugar kovil kulam, inlet outlet babyl pond Bathing Ghayt in Neivanatham Hanitation @ Neivanatham Panchayat of KilpennathurBlock in Package No19. KIL 2025-26 Tiruvannamalai District |
| 2 | Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete |
| 3 | Sectioning during forming bunds when earth moving machinery.lorres and rollers are used for consoloidation |
| 4 | Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc. |
| 5 | In Let & Out Let |
| 6 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 7 | Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 8 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 9 | Supplying and erection of centering for retaining wall and bathing ghatincluding cost and conveyance of all material and all labour charges etc, complete |
| 10 | providing and laying Reingorced cement pope NP2 for culverts on forst class bnedding of granulalr material in single row fixing collar 1:2 |
| 11 | Construction of Bhathing Ghat |
| 12 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
| 13 | Plain Cement Concrete 1:2:4 (one cement, twoM.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 14 | C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
| 15 | C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete |
| 16 | Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete |
| 17 | Provision for Name Board |
| 18 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |