}

Tender For Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Earth Work In Excavation I, saharanpur-Uttar Pradesh

J V Jain College Saharanpur has published Tender For Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Earth Work In Excavation I. Submission Date for this Tender is 21-04-2025. Toilet Bathroom Tenders in saharanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48683059
Tender For Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Earth Work In Excavation I
Open Tender
Indian
Uttar Pradesh
Saharanpur
21-04-2025

Tender Details

Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Reconstruction Of Facilitated Toilet Block For Boys Near Main Gate No. 01 At J.V. Jain College, Saharanpur , Earth Work In Excavation In Foundation , Cement Concrete With 4Cm. (11/2) Gauge Approved Stone Blast, Coarse Sand & Cement In The 1:4:8, Cement Concrete In Foundation , As In Item (283) Above But In R.C.C Raft Foundations And Footing With 4Cm. (1.5) Gauge Approved Stone Ballast.(1:1.5:3) , R.C.C. Work In Columns(1:1:2) Upto Plinth Level , R.C.C. Work In Beams & Columns(1:1:2) , P & L R.C.C. In 1:1:2 As 1 Part Cement 2 Parts Coarse Sand & 4 Parts Stone Aggregateinclude. Cost Of Material & Labor, Shuttering, Centering Etc. As Per Directions Of Engineer Incharge Required But Exclude. Cost Of Reinforcement (Plinth Band) , Brick Work (1:6) In Foundation , P & L 1St Class Brick Work In Super Structure In 1:6 Cement Mortar, 1 Part Cement 6 Parts Coarse Sand Including Cost Ofshuttering Material Labor T & P Etc.(One Brick Thick) , P & L 1St Class Brick Work In Super Structure In 1:6 Cement Mortar, 1 Part Cement 6 Parts Coarse Sand Including Cost Of Shuttering Material Labor T & P Etc.(Half Brick Thick) , P & L R.C.C. In 1:1:2 As 1 Part Cement 2 Parts Coarse Sand & 4 Parts Stone Aggregateinclude. Cost Of Material & Labor, Shuttering, Centering Etc. As Per Directions Of Engineer Incharge Required But Exclude. Cost Of Reinforcement (Door Band) , M.S. Or Iron Work In Heavy Sizes Such As Built Up Gates, Door Frames Including Cutting Welding And Wastage Including Supply Of Material, Labour T&P Etc. Required For Proper Completion Of Work. [S.I. No. 503] Design As Approved By Engineer In-Charge And Management.(Door Drame 40/40/6Mm). , Flush Doors 32 Mm Thick Both Side Laminated (Century Make/Bwp) Including All Fixtures And Labour , Sameas In Item 502 Above But Steel Z Section Window Including Glass Panes And Welded Grills 100Mm Centre To Centre.) Fixed Pannels2.) Openable Panels , P & L R.C.C. In Roof Slab (6 Thick) All Including Necessary Centering And Shuttering Etc. Including Cost Of Binding Wires, Nails Etc. Required For Proper Completion Of The Work As Directed By Engineer Incharge As Per On Site Requirements.(1:1.5:3) , As In Item (582) Above But With Cement And Fine Sand Of 1.25 Fineness Modulus Mortar In 1:6. , P & L 12Mm Thick Cement Plaster 1:4 Mortar As 1 Part Cement 4 Part Coarse Sand Over Ceiling & R.C.C. Joint Include. Supply Of All Material Labor T & P Etc. Required , Sand Filling In Plinth Including Supply Of Necessary Quantity Of Sand From A Distance Not Exceeding 8Kms. From The Site Of Work And Including Watering, Dressing Etc. Labor And T & P Etc. Required For The Proper Completion , As In Item (279) Above But In The Proportion Of 8 : 4 : 1.Stone Ballast,Coarse Sand And Cement.(100 Mm Thick) , (Supply And Fixing 6 To 8 Mm Thick Ivory Or Light Shades Vitrefied Tiles 600X600 M Size In Flooring And Skirting With 1:3 Approved Cement And Coarse Sand Morter Finished With In Its Cement Colour Slurry ,Jointing And Polished Of Approved Quality Complete ,Including Suppy Of All Materials ,Labour Tools And Plants Etc. Required For Proper Completion Of The Work. As Per Direction Of Engineer -In - Charge)Providing And Laying Vitrified Floor Tiles In 600X600mm Size (Thickness To Be Specified By The Manufacturer)With Water Absorptions Iess Then 0.08% And Conforming To Is : 15622 Of Approved Make In All Colours And Shades, Laid On 20Mm Thick Cement Morter 1:4 (1 Cement : 4 Coarse Sand) Including Grouting The Joint With White Cement And Matching Pigment Etc Complete.(Kajaria /Somany) Design And Color After Approval Of Building Consultant. , (Supply And Fixing 6 To 8 Mm Thick Ivory Or Light Shades Vitrefied Tiles 600X600 M Size In Flooring And Skirting With 1:3 Approved Cement And Coarse Sand Morter Finished With In Its Cement Colour Slurry ,Jointing And Polished Of Approved Quality Complete ,Including Suppy Of All Materials ,Labour Tools And Plants Etc. Required For Proper Completion Of The Work. As Per Direction Of Engineer -In - Charge)Providing And Laying Vitrified Floor Tiles In 600X600mm Size (Thickness To Be Specified By The Manufacturer)With Water Absorptions Iess Then 0.08% And Conforming To Is : 15622 Of Approved Make In All Colours And Shades, Laid On 20Mm Thick Cement Morter 1:4 (1 Cement : 4 Coarse Sand) Including Grouting The Joint With White Cement And Matching Pigment Etc Complete.(Kajaria /Somany) Design And Color After Aprooval Of Building Consultant. , Mild Steel Or Iron In Plain Work Suchas Reinforced Concrete Or Reinforced Brick Work (When Not Including In An Over All Rates.) Wrought To Required Shapes As Necessary Including Bending For Proper Completion Of The Work, And Including Supply Of Steel, Its Wastage Including Rolling Margin Bend, Hooks And Authorized Overlapping Shall Be Measured .(Apollo Make) , Demolition Of Old Brick Work And Rcc , 3 Coats Of Royal Emulsion Paint Of Asian, Silk Of Berger Or Impression Of Narolac After 3 Coats Ofwall Putty 2 Dry & 1 Liquid Of Birla White Or J K White Brand, As Approval Of Estate Officer On Walls And Ceiling Inside And 2 Coats Of Apex Weather Coat Of Asian Paints On Exterior , Add For Electrification Including Wiring Of Rooms ,Modular Switches(Legrand), M.C.Bs (Main/Ac)And Light Fixtures Using Either Of Havels Or Phillipsafter Approval Of Estate Officer @ 10 % , Add For Rain Water Pipe, Drainage System, Sanitation .Sanitary Ware Of Eccso Make And Fittings Of Jaquar)

Key Value

Document Fees
INR 1500 /-
EMD
INR 25000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail