|
| 1 | Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T &P complete in all respect including required all material, labour etc. |
| 2 | Transportation, Erection and Dismanting of Rig Machine |
| 3 | Drilling by RC Rig Machine 600 mm dia0 to 60 mtr. Deep |
| 4 | 60 to 100 mtr. deep 500 mm dia |
| 5 | 100 to 165mtr. 500 mm dia |
| 6 | Tubewell AssemblyM.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug. clamp, reducer, central guide, support structer etc. As required & as per typed design complete in all respect |
| 7 | 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7. 1mm. |
| 8 | 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7. 1mm. |
| 9 | Supply of pea gravel |
| 10 | Logging of bore hole by departmental / approved electric logger. |
| 11 | Lowering of Tube well assembly duly welded including weldingelectrode and shurounding of pea gravel complete in all respect. |
| 12 | Lowering of 300mm dia pipe from GL to 60m deep BGL |
| 13 | Lowering of 200mm dia pipe from 60 to 100m deep BGL. |
| 14 | Lowering of 200mm dia pipe from 100 to 155m deep BGL |
| 15 | Development of Tubewell by compressor |
| 16 | Transportation, Installation and Dismantling of 600 PSI Compressor |
| 17 | Development of Tubewell by 600 PSI Capacity Air compressor. |
| 18 | Development of Tubewell By O.P. Unit |
| 19 | Transportation, Installation and Dismantling of 3 Cusec O.P. Unit & Yield Test. |
| 20 | Development of Tubewell by 3 Cusec Capacity O.P. Unit |
| 21 | Chemical and Bacterological test of water sample from departmental/ approved lab. |
| 22 | Site Clearance and gravel Shifting & other allied works. |
| 23 | Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. |
| 24 | SITC of Submersible pump set with 24m column pipe, NRV, CI DIF Bend 90 ,CI AVF Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset ,wiring of pump houseinternal and external, Chain pulley block, and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). |
| 25 | 40 H.P. |
| 26 | Servo voltage stabilizer (240v-500v) 30 KVA |
| 27 | 6 Mtr. long heavy duty size 150mm dia column pipe same asabove spare (for 12 mtr length |
| 28 | Copper cable size 2x3cx6 sq mm. flat for 12 m extra column pipe. |
| 29 | 4x 25 sq. mm Al. cable for power connection |
| 30 | Soft starter with RS-485 port-400V Class 15 Kw rating |
| 31 | Auto Phase reversal unit with inbuilt time delay and enclosure (100Amp.) |
| 32 | Motor operated actuator with sluice valve 150mm Sluice Valve |
| 33 | CE &UL Certified / HMT touch screen suitable to Communication with PLC/RTU Local display and control and process Parameter |
| 34 | CE & UL certified Inteligent Smart Energy Meter |
| 35 | CE & UL certified Electro magnatice flow Meter 150mm size |
| 36 | CE UL Certified hydro static type sub soil water level transmitter for Tubewell |
| 37 | CE & UL certified pressure transmitter |
| 38 | CE & UL certified Surge protecton for control panel |
| 39 | Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT |
| 40 | Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) |
| 41 | Add 18% GST |