| 1 | SUPPLY PART |
| 2 | SUPPLYOF AUTOMATIC CHANGEOVER PANEL INCLUDING SDF UNITS Supply of changeover panel including ATS(160A) ,SDF(125A) units -2NosMutifunction meter: -1NosIndicating lamps,Manual Mode (operating handle) |
| 3 | Design, fabrication (14 SWG or 2 mmsheet steel) supply,installing and commisioning offree standing floor mounting cubicle panel pedestal type dust & vermin proof, wheather proof, powder coated switchboard.The size of the main bus (phase and neutral) should be: X-section x 0.8 ≥ 200.(Aluminium)The switchboard shall be with bus chamber,Cable chamber andMCB chamberas per attached technical specification, scope of work, general terms & conditions. The Switch Board must contain, 200A,4P,36KA LSIG MCCB as incomerOut goingsa) 63A- 4Nos,TM 4P MCCBs, b) 40A- 1Nos,TM 4P MCCBs,c) 40A- 4 Nos, TM 4P MCBs, d)Multi Function Energy meter - 1No.e) Indication Lamps - 3 Nos (R,Y,B) f) Timer, contactor ,Auto manual selector switcharrangement forcontrolling street light - 1 Nos |
| 4 | Supply of one run 4core X 120 Sq.mm A2XFYAluminium Conductor , XLPE Insulated, |
| 5 | Supply of one run 4core X 2.5 Sq.mm copper conductor, XLPE Insulated, |
| 6 | Supply of8 SWG Copper wireconductorfor earthing. |
| 7 | Supplying and making end termination with brass singlecompression gland, Earthing the gland and heavy dutylong barrel lugsfor following size of XLPE insulated, aluminium/ Copper conductor, |
| 8 | a) Supply of glands and termination accessoriess for cable 4C x 50mm2 XLPE armoured Aluminium cable |
| 9 | b) Supply of glands and termination accessoriess for cable 4C x 120 mm2 XLPE armoured Aluminium cable |
| 10 | c) Supply of glands and termination accessoriess for cable 4C x16mm2 XLPE armoured Aluminium cable |
| 11 | d) Supply of glands and termination accessoriess for cable 4C x 6mm2 XLPE armoured Aluminium cable |
| 12 | e) Supply of glands and termination accessoriess for cable 4C x 2.5XLPE armoured copper cable |
| 13 | Supply of Maintenance free earthing Make: Cape / Erico / Furse/ OBO |
| 14 | Supply of 25*3mm copper strip for Switch board earthing |
| 15 | Supplyof GI pipe 100NB for UG CABLE |
| 16 | Installation Part |
| 17 | Installation and commissioning of switch boards |
| 18 | Laying of one run 4core X 120 Sq.mm A2XFYAluminium Conductor , XLPE Insulated, on wall surface |
| 19 | Laying of one run 4core X 120 Sq.mm A2XFYAluminium Conductor , XLPE Insulated, direct in ground including excavation , sand cushioning,Protective covering, laying of pipeand refilling the trench etc as required |
| 20 | Laying 8 SWG Copper wireconductorfor earthing |
| 21 | Layingof one run 4core X 2.5Sq.mm armoured CopperConductor , XLPE Insulated,metal /HUME pipe including excavation, laying of pipe and refilling the trench etc. as required |
| 22 | Glanding & termination of all XLPE Armouredcables using heavy dutycopper lugs, brass cable gland ,Earthing the gland etc. complete.The cable gland shall be earthed as per ISS/IER. All materials required for the work shall be supplied by the contractor. |
| 23 | a)Glands and termination accessoriess for cable 4C x 50mm2 XLPE armoured Aluminium cable |
| 24 | b) Glanding and termination of existing incomer cable 4 x 120mm2 XLPE armoured Aluminium cable |
| 25 | c) Glanding and termination of existing cables 4C x 16mm2 XLPE armoured Aluminium cable |
| 26 | d) Glanding and termination of existingcables 4C x 6mm2 XLPE armoured Aluminium cable |
| 27 | e) Glanding and termination accessoriess for cable 4C x 2.5XLPE armoured copper cable |
| 28 | Intsallation of maintenance free earthing |
| 29 | Laying and installation of 25*3mm copper strip for earthing |
| 30 | Dismantling of existing switch boards, disconection of all cableswith all accessories and transporting to site specified by engineer in charge. |