}

Tender For Civil Works Of Construction Increasing Capacity From (2X63) Mva To (3X63) Mva At 132 Kv Sub Station, Teelamore, Ghaziabad. - 1 Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Dept, ghaziabad-Uttar Pradesh

Uttar Pradesh Power Transmission Corporation Limited has published Tender For Civil Works Of Construction Increasing Capacity From (2X63) Mva To (3X63) Mva At 132 Kv Sub Station, Teelamore, Ghaziabad. - 1 Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Dept. Submission Date for this Tender is 05-05-2025. Paver Blocking Tenders in ghaziabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48677499
Corrigendum : Tender For Civil Works Of Construction Increasing Capacity From (2X63) Mva To (3X63) Mva At 132 Kv Sub Station, Teelamore, Ghaziabad. - 1 Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/Manual Means Over Areas (Exceeding 30 Cm In Dept
Open Tender
Indian
Uttar Pradesh
Ghaziabad
05-05-2025

Tender Details

Tender For Civil Works Of Construction Increasing Capacity From (2X63) Mva To (3X63) Mva At 132 Kv Sub Station, Teelamore, Ghaziabad. - 1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) All kinds of soil including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2 Supplying and filling in plinth withsand under floors, including watering, ramming, consolidating and dressing complete. 3 Providing and laying in position cement concrete of specified grade1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level : 4 Providing and laying in position cement concrete of specified grade 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)excluding the cost of centering and shuttering - All work up to plinth level : 5 Providing and laying in position specified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 6 Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete 7 Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 8 Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). 9 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. 10 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand). 11 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 12 12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand). 13 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. 14 Demolishing cement concrete (Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)) manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15 Demolishing brick work In cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 16 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. 17 Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. 18 Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof workgates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment but when steel is to be provided by the department. 19 Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266)900 mm. long with base plate (75x75x6mm) welded with anchor boltsincluding its threading upto a length of 10cm. and also supplyof a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work 20 Fixing and grouting28 mm and above dia bolts in properalignment level and setout with help of a template completeincluding supply of all labour & T&P etc. required for propercompletion of the work.(labour rates only) . 21 Supply of 25 mm. dia M.S. Anchor bolts (conforming to IS 266)500 mm. long with base plate (50x50x6mm) welded with anchor boltsincluding its threading upto a length of 10cm. and also supplyof a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work 22 Fixing and grouting 25 mmand below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . 23 Grouting of 90/105 lbs M.S. railincluding cost of all materials,labour & T&P for fixing of rail in proper alignment, leveland position in transformer plinth foundation etc. as perdirection of Eng I/C. (Rail to be supplied by thedept.)(labour rates only) . 24 S/F in position 105 lbs M.S. Rail for transformer plinth including cost of all labour, material and T&P etc. required for proper completion of the work. 25 Grouting of vertical or inclined post of pale/chain/security fencing in true level, alignment and in plumb or inclination as required, including cost of all labour, materials and T&P required for proper completion of work. ( Post and concrete for grouting shall be measured separately) 26 Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . 27 Fixing of template in position level and alignment for groutingof Anchor bolt in main gantry (labour rate only). 28 Fixing of template in position level and alignment for groutingof Anchor bolt in auxiliary gantry (labour rate only). 29 Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). 30 Fabrication of template for main gantry foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only). 31 Fabrication of template forauxiliary foundation including cost of all labour, and T&P etc. required for proper completion of the work. Steel shall be arranged by contractor free of cost. This template shall be property of contractor.(Labour rate only). 32 2.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm gradedapproved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement andmarble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels ifany and giving them a uniform finish including supply of all materials, labour and T&P etc, required forproper completion of the work. without base CC 33 Dismantling of existing pale / security / chain link fencingincluding post and stacking properly as per direction of theEngineer - in - charge. Including all labour and T&P etc.required for proper completion of the work. 34 Placing of trench cover of all size in proper position including transportation from different places withinthe S/S area including all labour, T&P etc. required for proper completion of the work as per direction ofEngineer - in - charge. 35 Beldar(Labour) add 10% CP

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 01-05-2025 Date Extended Date 05-05-2025
2 26-04-2025 DATE EXTEND 01-01 Date 01-05-2025

Key Value

Document Fees
INR 3540 /-
EMD
INR 55000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail