Tender For Work Of Attending Breakdowns. Of Lines And Sub-Station Of 33Kv And 11Kv O/H And U/G Lines And All Related Works Under The Area Of Assistant Engineer-Iind And Iiird, 33 Kv And Electrical Safety, Kesco Kanpur - 1 Electrical Items : 2 Loading, Carriage and unloading of ST poles including old & used S.T. Pole from store to work site or vice-versa. 3 Erection of repaired/new S.T. Pole size 9.0 Mtr. to 13.00 Mtr. with the help of craneincluding digging of Pit back filling and ramming 4 Dismentalling of damaged S.T. Pole of very critical position with the help of crane after removing all the accessories from damaged pole and its all related work including digging of pit or by cutting with gas cutter. 5 Erection of Single/Stud Pole including fitting of all material. 6 Erection of Double pole structure as per standard specificationswith the help of craneincluding digging of Pit back filling and ramming 7 Erection of Double pole structure from existing Single Pole including fitting of M.S. Channel and other accessories etc. 8 Grouting of pole with cement brick ballast and coarse sand as per standard specification Including of all civil materials., 9 Making of pole plinth of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. 10 Painting of Steel Tubular Pole with one coat of red oxide and two coats of first enamel Alm. Paint upto fuse set including cost of all materials. 11 Earthing of pole as per standard specifications 12 Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. 13 Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. 14 Opening of L.T. Jumpers from the existing 3 Phase 4 Wire L.T. O.H. line for erection work. 15 Loading, Carriage and unloading of ACSR/ Panther Conductor from store to work site or vice-versa. 16 Loading, Carriage and unloading of Earth wire/G.I. wire from store to work site or vice-versa. 17 Laying, stringing, tensioning & final sagging ofEarth wire/G.I. wire 18 Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span) 19 Dismentalling of 33/11 KV V-Type X-arm/M.S Channel/ Guarding Angle/LT Bracket etc. from damage pole. 20 Excavation of ST pole (Old & Used) from ground by digging the pit or by cutting with gas cutter and its proper stacking. 21 Dismentalling of binding wire from insulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixedconductor & rolling into bundles. 22 Taking out 11 KV/0.4 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa. 23 Digging of Trench for laying of 11 KV/0.4 KV cable in normal soil in size of 30 cm. wide and 1 to 1.5 meter deep. 24 Digging of Trench for laying of 11 KV/0.4 KV cable in kharanja soil in size of 30 cm. wide and 1 to 1.5 meter deep. 25 Digging of Trench for laying of 11 KV/0.4 KV cable in metallic road in size of 30 cm. wide and 1 to 1.5 meter deep. 26 Digging of Trench for laying of 33 KV cable in normal soil in size of 30 cm. wide and 1 to 1.5 meter deep. 27 Digging of Trench for laying of 33 KV cable in kharanja soil in size of 30 cm. wide and 1 to 1.5 meter deep. 28 Digging of Trench for laying of 33 KV cable in metallic road in size of 30 cm. wide and 1 to 1.5 meter deep. 29 Laying of MS Pipe in digged trench. 30 Laying of 11 KV /0.4 KV XLPE cable in above digged trench covering with bricks and back filling and proper ramming. 31 Laying of 11 KV/0.4 KV XLPE Cable through M.S. pipe in digged trench. 32 Laying of 33 KVXLPE cable in above digged trench covering with bricks and back filling and proper ramming. 33 Laying of 33 KV XLPE Cable through M.S. pipe in digged trench. 34 Making indoor/outdoor joints of 11 KV/0.4 KV XLPE Cable where the cable is being laid. 35 Making indoor/outdoor joints of 33 KV XLPE Cable where the cable is being laid. 36 Making 11 kV/0.4 kV straight through joint including digging of pit upto 1.1 metre depth 37 Making 33 kV straight through joint including digging of pit upto 1.1 metre depth 38 Digging of pit using JCB for making straight through joint 1mx1mx1m 39 Loading, carriage and unloading of Aearial Bunched Cable from store to work site or vice-versa. 40 Laying of HT Aerial Bunched Cableincluding fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Poleetc. 41 Laying of LT Aerial Bunched Cableincluding fixing suspension clamp with eye hook , Dead end clamp with Eye hook on erected Steel Tubular Poleetc. 42 Mounting & Erection of single phase distribution box of AB Cable with Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. 43 Mounting & Erection of three phase distribution box of AB Cablewith Piercing Connector, L.T. Bare Neutral Connector, Alu. Lug 25 mm, L.T. Cable 1x25 mm etc. No. 44 Opening and reconnection of consumer service connections after replacement of line/ poles etc. 45 Erection of Distribution T/F on plinth/D/pole structure. 46 Connection of H.T. Jumper from fuse set to H.T. Bushing of the transformer. 47 Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B. 48 Connection of L.T. cable from L.T.D.B to L.T.O.H. 49 Dismentalling of existing distribution T/F (Upto 630 KVA) 50 Dismentalling of existing distribution T/F Fencing and erection and grouting of T/F Fencing on shifted T/F plinth 51 Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. 52 Making of H.T. Jumpers with3 Phase 3 Wire H.T. O.H. line after erection of work. 53 Making of L.T. Jumpers from 3 Phase 4 Wire L.T. O.H. line for erection work. 54 Making section in existing Upper Busbar with ACSR Dog/Panther Conductor for dual source supply including mounting of disc insulator string. 55 Loading Carraige, Fabrication & modifications of M.S. Items as per requirement of site conditions. 56 Chopping of tree branches lying in the route of HT/LT line touching the tree branches to the phase line conductor making fault to the feeder, for 75mm dia to 450mm dia or as per requirement of site. All arangemant with skiled menpower provided by contractor. 57 Fitting of Cross bracing on double pole structure and related work. 58 Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia B-Class 40 feet long with socket cutter, earth wire 7/14 SWG, Nut & bolts with connection of pipe to distribution T/F Neutral or Body all material shall be provided by contractor with cost of all material. 59 Deep Bore GI Pipe Earthing including supply ,Size GI Pipe 40mm dia B-Class 80 feet long with socket cutter, 50x6 mm MS flat , nut & bolt, welding work, charcole , salt with connection of pipe to power transformer neutral or bidy poperly . All material shall be provided by contractor with cost of all material. 60 Fabrication, erection & grouting of T/F fencingof frame size 3x2.4 mtr. including cost of M.S. Angle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil and dust. 61 Carriage of all concerning stock material except mentioned above from Kesco. Store to site or vice-versa. 62 Connecting of newly erected network with Kesco mains including testing, commissioning and energization of the same completely. 63 Taking out 33 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa. 64 Dismentalling of 33 KV cable box from existing 33 KV Jarjar VCB 65 Connecting of 33 KV Cable box on newly erected 33 KV VCB after erection work. 66 Dismentalling of 33 KV indoor type VCB at control room including all related work. 67 Shifting of 33 KV VCB from unloading point to control room. 68 Shifting of 11 KV VCB from unloading site to meter room/Control room. 69 Shifting of 33 KV old & used indoor type VCB/OCB from control room to loading point. 70 Shifting of 11 KV old & used indoor type VCB/OCB from control room to loading point. 71 Erection of 33 KV VCB in swithch yard 72 Erection and grouting of 11 KV VCB/Control Relay Panel in meter room/control room. 73 Making riser from existing earth mate of control room for making earthing support to newly erected 33 KV VCB in control room with 50X6 sq mmMS flat . All materialprovided by contractor including cost of material . 74 Carriage of 11/6.6 KV S/G Panels/ Control Panel New & (Old & used) from Store to Site of work as and when required or back to store from site. 75 Dismentalling of jumpering from cable box to line, cable support switchgear panels. 76 Dismentalling of earthing of 11/6.6 KV S/G Panels/ Control Panel. 77 Dismentalling of connected cable box with S/G Panel/ Control Panel. 78 Opening of internal connection to 11/6.6 KV S/G Panels. 79 Dismentalling of old/damaged existing 11/6.6 KV S/G Pannels. 80 Connection of earthing of 11 KV switchgearPanels with MS flat 50x6 sq mm. All materialprovided by contractor including cost of material . 81 Mounting of cable box on S/G Panels with handing of concerning cable and its proper fixing. 82 Making jumpers from cable box to line, cable support switchgear panels, section poles of each phase. 83 Laying of 11 KV 3x70sq mmCable Cable (All size) Over head (Pole to Pole)with Fixing of Holding Clampon existing /newly erected ST Pole. 84 Laying of 11 KV 3x185 mm2Cable Over head (Pole to Pole)with Fixing of Holding Clampon existing /newly erected ST Pole 85 Laying of 11 KV 3x300 mm2Cable Over head (Pole to Pole)with Fixing of Holding Clampon existing /newly erected ST Pole 86 Laying of 33 KV 3x120-400 sq mm Cable Over head (Pole to Pole)with Fixing of Holding Clampon existing /newly erected ST Pole 87 Dismentalling of Aerial Bunched Cable from L.T. O/H (damage) line. 88 Re-sagging of conductor, on old line after erection of pole, binding of conductor etc. 89 Laying, stringing, tensioning and binding of Weasel conductor for H.T./L.T. O.H. 90 Laying,stringing tensioning and binding of ACSR Dog conductor for H.T./L.T. O.H. 91 Laying, stringing, tensioning and binding of Panther conductor 92 Fixing of guarding angle/guarding channel for laying of guarding 93 Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span) 94 Restoration of Metallic/RCC road after proper repairing with appropriate materials. 95 Erection of Tri-Pole structure including all fittings and proper alignment. 96 Erection of four pole structure including all fittings as well as proper alignment of structure. 97 Painting of M.S. structures fitted on pole such as channel, angle, brackets 98 Erection of O/D type Metering unit on D/P Structure. 99 Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa. 100 Disconnection of H.T./L.T. Lines, Shifting of T/F from ground/plinth to a safe place for construction of T/F plinth. 101 Shifting of T/F from ground to plinth or vice versa and re-connection/disconnection of H.T. L.T. Lines as well as earthing for proper completion. 102 Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth. 103 Fabrication and Erection of X-bracing on Four pole structure with fixing of bracing clamp. 104 Fabrication of Isolator structure with M.S. Channel, M.S. Angle, M.S. Flat etc. in required size and length including cutting, drilling holes, welding and assembling as per drawing. 105 Erection and grouting of Isolator structures with 1:4:8 CC 25 mm brick ballast in required size in proper alignment and making plinth of all structure in 1:2:4 CC mix with 20 mm stone grit, 15 Cm ground level to smooth finish and its proper curing including cost of cement. 106 Erection of 33 KV Line Isolator equipment on erected structure in proper alignment. 107 Erection of 33 KV Bus Isolator equipment on erected structure in proper alignment. 108 Loading, Carriage and unloading of Isolator from Kesco. Store to site of work or work site to store including old & damage materials. 109 Earthing of Isolator Structure or other MS structure with M.S. Flat by welding and connecting to existing earth mate of yard. 110 Fabrication of Post Insulator/L.A./C.T/P.T Structure. 111 Fabrication of Cable Support Structure. 112 Fabrication of Earthing Electrodes 3 mtr. long with 40 mm diaM.S. Round Bar making one end pointed upto 15 Cm. 113 Fabrication of Busbar Gantry 114 Fabrication of Neutral Support Structure. 115 Erection of Post Insulator/L.A./C.T/P.T Structure. 116 Erection of Cable Support Structure. 117 Erection of Busbar Gantry with the help Crane. 118 Erection of Neutral Support Structure. 119 Erection of 33 KV L.A. 120 Erection of Post/Pin Insulator with E clamp in Post Insulator Structure/Cable Support Structure. 121 Erection of 33 KV C.T/P.T with the help of Crane. 122 Erection of CT/PTjunction box 123 Lowering of ACSR dog Conductor of 33 KV single line for adjusting of V cross arm of single Ckt. line for converting double Ckt. line. 124 Fixing of V-Type cross arm on erected/existing double/try/four pole. 125 Fixing of M.S. Channel on erected/existing double/try/four pole. 126 Fixing of M.S. Angle on erected/existing double/try/four pole. 127 Fixing of G.I. Pin and Pin Insulator on erected/existing double/tri/four pole. 128 Opening the binding for taking out the conductor and dismantling the concern X-arm/bracket from pole/rail. 129 Dismentalling of existing Jarjar Al. Conductor from existing damaged O.H. Line 130 Painting of Post Insulator/L.A./C.T/P.T Structure. 131 Painting of Isolator Structure. 132 Painting of Cable Support Structure. 133 Painting of Busbar Gantry 134 Painting of Neutral Support Structure. 135 Loading, Carriage and Unloading of 33 KV C.T/P.T. from store to site and vice versa 136 Loading, Carriage and Unloading of 33 kV single CRP from store to site and vice versa 137 Loading, Carriage and Unloading of 33 kV double CRP from store to site and vice versa 138 Loading, Carriage and Unloading of Rail Pole for bus bar gantry from store to site and vice versa 139 Loading carriage & unloading of main tank of 3/5/6/8/10 MVA, 33/11 KV power T/F alongwith radiators & its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. 140 Mounting of 33 KV Pin Insulator 141 Mounting of 11 KV Pin Insulator 142 Mounting of 11 kV B&S type Disc Insulator 143 Digging of Pit 2x2x1 mtr. for laying of cable through HDD Method. 144 Laying of 33/11 KV 3x300/400/185/120/70 sq.mm XLPE with HDPE Pipe through HDD Method and also marking feeder name on pipewith Paint at the interval of each 100 mtr.Along with supply of pipe 145 Laying of 33/11 KV 3x300/400/185/120/70 sq.mm XLPE without HDPE Pipe through HDD Method and also marking feeder name on pipewith Paint at the interval of each 100 mtr. 146 Repairing of 33 KV Old Isolator by replacing the jaws, operatingmechanism and blades or by oiling and greasing of moving parts or by adjustment of moving mechanism or by leveling the whichever is required for smooth operation of isolator and its all related work. 147 Dismantling of 33 KV outdoor CT/PT with the help of Crane. 148 Erection of Lower Bus bar with ACSR Panther/DOG conductor 149 Erection and Grouting of 33 KV VCB Structure on Plinth 150 Erection of 33 KV VCB on erected structure with the help of Crane. 151 Erection of 33 KV single control relay panel in control room 152 Erection of 33 KV double control relay panel in control room 153 Pegging of 3 mtr. long Earth Electrodes40 mm dia in to ground by hammering keeping its head 0.5mtr. below the ground level. 154 Laying of earthing strip of 50x6 mm M.S. Flat after cutting, bending, shaping and welding with earth electrodes with welding of U Clamps on each electrodes and making proper joints overlapping with 40 cm each other it includes welding of riser from making earth mate to structure of both side. 155 Laying of 40 mm2 M.S. rod after cutting bending, shaping and welding with earth electrodes with welding of U clamps on each electrode and making proper joint overlapping 15 Cm each electrode for main earthmate. 156 Erection of new Upper Busbar with ACSR Dog/Panther Conductor including mounting of disc insulator string. 157 Making of 33KV V.C.B. plinth in size of 1.5x2.4x1.0 meter with brick work cement, sand ratio 1:6 making proper pockets for anchor bolts grouting its plastering around with smooth finish including cost of civil material. 158 Connecting of main earthing of control room & jointing with switch gear panel by welding of M.S. flat size 50x6 mm including all materials. 159 Filling of soil for leveling of S/S Switch yard as per site requirement. 160 Final leveling of yard and removal of wastage material and soil from switch yard. 161 Proper Earthing ofPower T/F at three points by extending the existing M.S. Flat 50x6 mm with main earth mat by welding properly. All material provided by contrector including cost of material 162 Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer. 163 Dismantling of Rail Poles of existing bus bar gantry 164 Dismantling of Upper Bus Bar 165 Dismantling of lower bus bar 166 Erection of TPMO 167 Dismantling of TPMO 168 Dismantling of 33 kV Isolator 169 Unmounting of Pin/Disc Insulator 170 Making of 11/33 kV Fuse Point 171 Laying of Ist class bricks after proper ramming of soil including cost of materials. 172 Filling of sand above laid bricks on edge including cost of materials. 173 Loading, carriage & unloading of distribution Transformers (Upto 630 KVA) from Store to site, site to site & vise-versa. 174 Unloading of following power T/F main tank filled with oil, along with its all accessories like radiators, conservator tank T/F oil vent pipe etc. from Truck by crane and proper stacking of 10/8/6 MVA, 33/11/6.6 KV T/Fwith 2 No crane 175 Unloading of following power T/F main tank filled with oil, along with its all accessories like radiators, conservator tank T/F oil vent pipe etc. from Truck by crane and proper stacking. Of 5/3/1.5 MVA, 33/11/6.6 KV T/F 176 Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking of 10/8/6 MVA, 33/11/6.6 KV T/F 177 Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking of 5/4/3 MVA, 33/11/6.6 KV T/F 178 Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking of 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane 179 Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking of 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane 180 Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer 8/6 MVA, 33/11/6.6 KV T/F 181 Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer 5/4 MVA, 33/11/6.6 KV T/F 182 Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane 183 Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane 184 Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer. 3/1.5 MVA, 33/11/6.6 KV T/F 185 Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. Of 8/6 MVA, 33/11/6.6 KV T/F 186 Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. Of 5/4 MVA, 33/11/6.6 KV T/F 187 Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance of 10/8/6 MVA, 33/11/6.6 KV T/Fwith 2 No crane &trolla 188 Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. Of 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane&trolla 189 Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. Of 3/1.5 MVA, 33/11/6.6 KV T/F 190 Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work of 10/8/6 MVA, 33/11/6.6 KV T/F 191 Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work of 5/4/3 MVA, 33/11/6.6 KV T/F 192 Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work of 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane 193 Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work of 5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane 194 Dismentalling of earthing of running/damaged transformer at two points with the help of gas cutter. 195 Dismentalling and taking out the cable support structure by cutting with gas cutter for shifting of T/F including cutting of earthing of cable support structure wherever is required including its all related work. 196 Dismentalling and taking out the neutral support structure by cutting with gas cutter alongwith removing of flexible copper bond and its proper stacking. 197 Erection and welding of cable support structure with the help of welding including earthing of support in proper alignment and all related work. 198 Erection & welding of neutral support structure with the help of welding including earthing in proper alignment and all related work and fixing of flexible copper bond. 199 Earthing of T/F at two points by extending the existing M.S. Flat size 50x6 mm with main earthmate by welding. All material provided by controcter 200 Fabrication of neutral support structure with M.S. Angle and M.S. Flat. 201 Erection and grouting of neutral support structure with 1:4:8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish. 202 Fabrication of isolator structure as per standard design. 203 Erection and grouting of Isolator structure in proper alignment and making plinth 15 Cm. above ground level with smooth finish. 204 Construction of power T/F plinth suitable for 5/10 MVA 33 KV T/F in size of 3 x 3 x 1.5 Mtr. Digging of pit in size of 3.5 x 3.5 x 1.2 Mtr. Of CC work at bottom in size of 3.5 x 3.5 x .15 Mtr. With ratio of 1:4:8 its proper ramming and curing thereafter brick work in size of 3 x 3 x 0.8 Mtr. with 1 : 6 CC Sand ratio, thereafter CC work on top in size of 3 x 3 x .25 Mtr. thereafter plastering all around the open portion, grouting of rail and M.S. Angle in top CC work and its proper curing.All civil materil provided by contractor. 205 T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening. 206 Supply and Erectiion of HTPB 207 Repairing of damage of H.T./L.T. S.T. Pole comprising Opening the binding for taking out the conductor and dismantling the concern X-arm/bracket from pole/rail. 208 Repairing of damage of H.T./L.T. S.T. Pole comprising Taking out the damaged pole from ground by digging the pit or by cutting with gas cutter and its proper stacking. 209 Repairing of damage of H.T./L.T. S.T. Pole by providing M.S. ANGLE 65x65x6 mm(3 feet),Ms pole Clamp with Nut & Bolt(Clamping of both Ends), Concreting for Grouting and Muffing of pole with all material (2FEET Grouting And 1 feet Muffuing) and its welding including its all related work. All material provided by controcter. 210 Erection of repaired/new S.T. Pole size 9.0 Mtr. to 13.00 Mtr. including digging of Pit back filling and ramming. 211 Mounting of 33 KV, 11 KV & L.T. X-arm/bracket on the pole/rail. 212 Dismentalling /Replacement of 33KV or 11KV pin insulator with G.I. Pin from damaged pole/ X-arm opening of binding from Insulator. 213 Repairing of 33 KV or 11KV damaged X-arm and proper shaping including drilling of holes whatsoever is required with the help of gas healing and welding. 214 Centrifusing of T/F Oil of Power Transformer. 215 Digging of cable trench for taking out old/damaged XLPE/PILCA, 3x50 to 3x400sqmm 33/11KV cable & taking out the above Cable from digged trench and back filling of digged trench and relaying the same cable. 216 Making special pole plinth of double pole of size 2 mtr. x0.5 mtr. Including all civil material. 217 Erection of ST pole 16 Mtr. Long incuding all accessoris and hardware fitting as per standerd specification. 218 Erection of pale fancing of substation switchyard as per standerd specification including cost of material .All materialprovided by contractor.