| 1 | Dismantling of old 80 mm thick precst cement concrete I-Shape interlocking tiles including stacking of ofd bricks |
| 2 | Dismantling old brick work or stone work in lime or cement mortar and including stacking of materisals |
| 3 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm layers including compaction with road roller to desired density and dressing the surface to required levels and slopes and also including 1.50M lift and 30M lead. the earth from cutting to be used in making embankment or to be deposited as spoil bakes with in 30M distance as directed by the E/I 8 Km Carriage. as per S.I.No.253(a)+231(a) |
| 4 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.as per S.I.No.273 |
| 5 | First class Brick Work in 1:4 cement & fine sand 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work.above Item No. 305 but in 1:4 coarse sand.as pre S.I.No.305(a) |
| 6 | Construction of granular sub base by providing well graded material spreading in uniform layers with mortar grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desire density complete as per technical specification clause. as per S.I.No.MORD 401 |
| 7 | Laying C C Road Slab 10 CM (4\") thick consisting of 1:2:4 cement, coarse sand of 2.20 F.M. & approved 2 CM (3/4\") gauge hard stone grit and including supply of all materials, labour and T & P etc. spreading the cocrete with shpveles, rakes, compacted using plate and needle vibrators and finished in continuous operation including provision of joint filler board 20 mm thick as per I.S. 1838 bitumen sealant curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and required for proper completion of work, finished to required template as directed by Engineer-in charge and including complete shifting of material and concret and also including 125 micron thick Polythene flim but excluding cost of metal required for rectification of the sub-grade. as per S.I.No.20.18(b) |
| 8 | R.C.C. work with Cement approved coarse sand and 2 cm.(3/4\") gauge approved stone ballast in the proportions of 1:2:4 in lintels fo doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W. G.G.I., binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work. Excluding cost of Binding wire.as per S.I.No.284 |
| 9 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for propershape as necessary including bending for proper complition of the work and including supply of all steel & wastage , bend, hooks, and authorised overlapping shall be measured. (Labour rate only but including cost of binding wire).as per S.I.No.504 |
| 10 | 12 mm thick plaster with cement and coarse sand of 2.20 F.M. mortar in 1:4 over brick work minimum thickness nor to be less than 1 cm. including supply of all materials, labour, T & P. etc. required for proper completion of the work.as per S.I.No.584(New) |
| 11 | P.C.C work with 2 CM. gauge stone grit, coarse sand of 2.20 F.M. & cement in the propoertion of 4:2:1 and including supply of all materials, labour, T & P. etc. required for proper completion of the work.as per S.I.No.279(a) |
| 12 | Available old interlocking itles of 60 to 80 mm thick |
| 13 | Available old bricks |
| 14 | Available old brick bats |
| 15 | Add 18% GST |