| 1 | Initial Rehabilitation Works |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD technical specification cluase 201.1.including cost. , conveyance, royalty, Cess & taxes of all materials & cost of all labour & T&P required for the work etc complete as per specification & direction of Engineer-in Charge. |
| 3 | ROAD-A |
| 4 | ROAD-B |
| 5 | ROAD-C |
| 6 | Providing and laying spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the matrial with water at OMC in mechanical mix plant, carriage of mixed materials by tipper to site, laying in uniform layers with paver in subase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT & H specifications for Road & Bridge works (4th revision) |
| 7 | ROAD-A |
| 8 | ROAD-B |
| 9 | ROAD-C |
| 10 | Providing 37.5mm thick BUSG in one layers applying tack coat using 3.0 kg of bitumen /10 sqm, using 0.45 cum of25mm to 40mm size H.G. metal& 0.12 cum of 12mm size h.g. chips for 10 sqm . etc. complete. |
| 11 | ROAD-A |
| 12 | ROAD-B |
| 13 | ROAD-C |
| 14 | Earthwork in embankment with approved material obtained from borrow pits with a lift upto 1.50m, transporting to site by mechanical means with a leads of 2 km spreading grading to required slope & compacting to meet requirement etc complete. |
| 15 | ROAD-A |
| 16 | ROAD-B |
| 17 | ROAD-C |
| 18 | Construction of granular sub-base by providing well graded materia, spreading in uniform layers with motor grader on prepared surface, mixing by mix place method with rotavator at OMC and compacting with smooth wheeled roller to achive the desired dansity, as per technical specification. |
| 19 | ROAD-A |
| 20 | ROAD-B |
| 21 | ROAD-C |
| 22 | Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on concrete surface as per drawing and Technical Specification. |
| 23 | ROAD-A |
| 24 | ROAD-B |
| 25 | ROAD-C |
| 26 | Reinforced cement concrete M15grade kilometre stoneof standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MORD technical Specification Clause 1703as per direction of the Engineer in charge |
| 27 | Ordinary Kilometer Stone (Precast) |
| 28 | ROAD-A |
| 29 | ROAD-B |
| 30 | ROAD-C |
| 31 | 200 meter Stone (Precast) |
| 32 | ROAD-A |
| 33 | ROAD-B |
| 34 | ROAD-C |
| 35 | Guard Stone (Precast) |
| 36 | ROAD-A |
| 37 | ROAD-B |
| 38 | ROAD-C |
| 39 | Providing and fixing of retro reflective cautionary mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheetingvide Clause 1701.2.3 fixed over aluminium sheeting 1.5 mm thick supported on a mild steel angle iron post 75 mm x x75 mm x x6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x x450 mm x 600 mm, 600 mm below ground level as per drawing and Technical Specification Clause 801 |
| 40 | 600 MM Triangular |
| 41 | ROAD-A |
| 42 | ROAD-B |
| 43 | ROAD-C |
| 44 | 800x600 mm |
| 45 | ROAD-A |
| 46 | ROAD-B |
| 47 | ROAD-C |
| 48 | Earth work in excavation of foundation in hard or gravelly soil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed E.I.C. |
| 49 | ROAD-A |
| 50 | ROAD-C |
| 51 | Filling in foundation and plinth with sandwatered and rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete |
| 52 | ROAD-A |
| 53 | ROAD-C |
| 54 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specification Clause 802, 803, 1202 & 1203 |
| 55 | Foundation |
| 56 | ROAD-A |
| 57 | ROAD-C |
| 58 | Sub-Structure |
| 59 | ROAD-A |
| 60 | ROAD-C |
| 61 | Providing weep holes in Brick masonary / Plain / Reinforced concrete abutment, wing wall / returning wall with 100mm dia AC pipe, extending through the full width of the structure with slope of IV : 20H towards drawing foce, complete as per the direction of the E.I.C. |
| 62 | ROAD-A |
| 63 | ROAD-C |
| 64 | PERIODIC RENEWAL |
| 65 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 of MoRD.and as per direction of Engineer-In-Charge. |
| 66 | ROAD-A |
| 67 | ROAD-B |
| 68 | ROAD-C |
| 69 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) |
| 70 | ROAD-A |
| 71 | ROAD-B |
| 72 | ROAD-C |
| 73 | Emergency Works |
| 74 | Routine Maintenance |
| 75 | BT Works |
| 76 | 1st Year |
| 77 | Road A |
| 78 | Road B |
| 79 | Road C |
| 80 | 2nd Year |
| 81 | Road A |
| 82 | Road B |
| 83 | Road C |
| 84 | 3rd Year |
| 85 | Road A |
| 86 | Road B |
| 87 | Road C |
| 88 | 4th Year |
| 89 | Road A |
| 90 | Road B |
| 91 | Road C |
| 92 | 5th Year |
| 93 | Road A |
| 94 | Road B |
| 95 | Road C |
| 96 | CC Works |
| 97 | 1st Year |
| 98 | Road A |
| 99 | Road B |
| 100 | Road C |
| 101 | 2nd Year |
| 102 | Road A |
| 103 | Road B |
| 104 | Road C |
| 105 | 3rd Year |
| 106 | Road A |
| 107 | Road B |
| 108 | Road C |
| 109 | 4th Year |
| 110 | Road A |
| 111 | Road B |
| 112 | Road C |
| 113 | 5th Year |
| 114 | Road A |
| 115 | Road B |
| 116 | Road C |