| 1 | Earth work in hard soil or gravelly soil within 50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost of all labour ,T & P sundries and labour cess etc complete and as per direction of Engineer-in-Charge. |
| 2 | Solingroadsurfacewithgranite stonesofsizenotlessthan 0.0025 cumpickedupincludingfillingtheintersticeswithsand well watered & rammedincluding cost,conveyance, royalty, T&P, sundries, lead, lift, delift and labour cessetccomplete and as per direction of Engineer-in-Charge. |
| 3 | Cement concrete (1:3:6) with 40mmsize HGCB metal including cost, conveyance, royalty,lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete and as per direction of Engineer-in-Charge. |
| 4 | Close deep chipping and cleaning to R.C.C. surface for receiving cement plaster or cement concrete including all labour, T&P, sundries and labour cess etc completeand as per direction of Engineer-in-Charge. |
| 5 | Cleaningtheexistingconcretingsurfacewithremovalofforeignmaterialswithbroomorsoftbrushesandfinallydustingwitholdgunnybagsand/orcompressedairtoreceivenewconcreteincludingall labour, T&P, sundries,broom,brush,compressor&labour cessetc complete and as per direction of Engineer-in-Charge. |
| 6 | Cement concretework ofM-20grade with20mm size and down gradeblackhardgranitecrusherbrokenstonechipsincludinglayingwithprovisionof providing 15 mmthick thermocolinexpansionjointsincludingcostofallmaterials, coveyance, royalty, T&P, sundries, alllead,lift, delift, labour, labour cess and curing etccomplete and as per direction of Engineer-in-Charge. |
| 7 | Rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including cost ofallmaterials complete including all labour, T&P, sundries, lead,lift,delift andlabourcess etc complete and as per direction of Engineer-in-Charge.(RCC Foundation, plinth band and footing bases of columns, mass concrete and precast RCC Slabs, etc.) |
| 8 | Disposalofbuildingrubbish / malba / similarunserviceable,dismantledorwastematerialsorexcavatedearthetcbymechanicalmeans,includingloading,transporting, unloadingtoapprovedmunicipaldumpinggroundor asapprovedbyEngineer-in-chargewithin5.00 Kmawayfromtheworksiteincludingcostofalllabour, conveyance , T&P,sundries, lead, lift, delift,labour cessetc complete. |
| 9 | RepairofDoubleleafM.SGatesincludingcutting& refixingbyweldingincludingalllabour, T & P,sundries, lead, lift anddeliftandlabourcessetccomplete and as per direction of Engineer-in-Charge. |