Supply, Delivery, Installation, Testing And Commissioning Of Various Machines And Equipment At Cfc Footwear Park, Bantala.
Tender Overview
Project Description
Supply, Delivery, Installation, Testing And Commissioning Of Various Machines And Equipment At Cfc Footwear Park, Bantala.-A Phase 1: Upper Preparation + Lasting Section 1 Single Step Cylinder Knife Skiving Machine 2 Linear Fusing Press Machine 3 Four Station Counter Moulding Machine 4 Vamp Conditioning Machine 5 Forepart Lasting Machine for Pre Applied Adhesive System 6 Hand Lasting Stand 7 Seat & Side Conditioning Machine 8 Heat Seat Lasting Machine for Pre Applied Adhesive System 9 Heat Setting Chamber with inbuilt Conveyor 10 Roughening Machine 11 Unlasting /Delasting Machine (Pneumatic) 12 Assembly Conveyor-(with a tunnel drier for drying of pre cemented upper and insole). Final length can be determined only after setting of operating machines. Estimated length 80ft 13 Top Line Forming Machine with hot & cold moulds B Phase 2: 24 Station PU Injection Machin 1 24 Station PU Injection Machine for Lasted Upper 2 OPTIONAL ‘ROBOTICS’ a Roughing work station for roughing uppers edge directly on injection machine b Touch screen with system for Off-Line setting on Roughing robot 3 OPTIONAL ACCESORIES a Oven for POL/ISO pre-heating (cap. 4 drums) with 4 metal trolleys b Stirrer for PU material preparation c Drop-meter d Screw cleaning unit e Mold cleaning unit including sand blasting unit & Blast media 4 OPTIONAL MOULDS a 12 pairs of aluminium moulds for shoes with soles C Phase 3: Furniture & Accessories 1 Wooden Horse / Metal with wheel 2 Component Tray 3 Hand Trolley 4 Large Table for keeping Leather & other materials 5 Table for components (besides different machines) 6 Cupboard for tools & spare parts 7 Sitting tools for different machines (Skiving, Stitching etc.) 8 Last Rack 9 wheeled rack for insoles 10 wheeled rack for closed uppers 11 Trolley for carrying Lasts 12 Hand Trolley for miscellaneous transportation purpose 13 Wheeled Iron Rack for arranging complete shoes from PU Injection machine for spue cutting Phase 3: Power Accessories 1 Air Compressor - 120 cfm 2 Servo Stabilizer - 800KVA
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-May-2025 | Corrigendum | Other | 03-May-2025 |
| 2 | 02-May-2025 | 2nd Corrigendum | Other | 03-May-2025 |
| 3 | 06-May-2025 | Date Corrigendum | Date | 17-May-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply, delivery, installation, testing, trial run and commissioning of various machines and equipment etc. for CFC Footwear Park (Bantala) as per tender documents on all complete-all inclussive turnkey-basis as per technical specifications, complying all sorts of Govt. requirements and ditections of the EIC. |
| 2 | Doing comprehensive repairing-renovation-maintenance works of the entire works mentioned in serial number (1) above as per tender documents on all complete-all inclussive turnkey-basis as per technical specifications, complying all sorts of Govt. requirements and ditections of the EIC. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender