| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 4km. (Including all taxes. Labour cess but excluding GST) |
| 2 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including all taxes. Labour cess but excluding GST) |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. (Including all taxes. Labour cess but excluding GST) |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including all taxes. Labour cess but excluding GST) |
| 5 | Providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in machenical mix plant carriage of mixed material by tipper to site , laying of 1% OPC cement and 3.5% emulsion in uniform layers with paver in sub-base / base course on well prepared surface and compacing with vibratory roller to achieve the desired density. (Including all taxes. Labour cess but excluding GST) |
| 6 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including all taxes. Labour cess but excluding GST) |
| 7 | Dense Graded Bituminous Macadam Grading-2Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including all taxes. Labour cess but excluding GST) |
| 8 | Bituminous Concrete Grading-2Providing and laying bituminous concrete withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including all taxes. Labour cess but excluding GST) |
| 9 | Construction of Deep Drain, RCC Culvert, HP Culvert 600mm & 1000mm as per drawing. Instruction of E/IEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including all taxes. Labour cess but excluding GST) |
| 10 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including all taxes. Labour cess but excluding GST) |
| 11 | RCC Grade M20 using batching plant transit mixer & manual placing. (Including all taxes. Labour cess but excluding GST) |
| 12 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including all taxes. Labour cess but excluding GST) |
| 13 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification. (Including all taxes. Labour cess but excluding GST) |
| 14 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including all taxes. Labour cess but excluding GST) |
| 15 | Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. As per SOR No-574. (Including all taxes. Labour cess but excluding GST) |
| 16 | RCC Grade M-25 using batching plant transit mixer & Concrete pump. (Including all taxes. Labour cess but excluding GST) |
| 17 | Providing & laying HP 600mm dia NP-3 with coller etc. complete. (Including all taxes. Labour cess but excluding GST) |
| 18 | Providing & laying HP 1000mm dia NP-3 with coller etc. complete. (Including all taxes. Labour cess but excluding GST) |