| 1 | Demolishing R.C.C. work manually/ by mechanical meansincluding stacking of steel bars and disposal ofnserviceablematerial within 50 metres lead as per direction of Engineer - in- charge. |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge ln cement mortar |
| 3 | Removal of sludge, kankar, brick bats, organic or inorganic material in faul position or in liquid mud including lead 30m and 3.00 meter lift with specials T&P labour etc. all complete. |
| 4 | Providing of Nala Bandha with local sand bags unit etc. all complete. (None Scheduled) |
| 5 | Providing of 8HP diesel pump for dewatering of nala with pump, driver etc. all complete. (NS) |
| 6 | Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30m form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) |
| 7 | Providing and laying cement concrete in 1:5:10 (1 cement :6 fine sand 12 stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter S.I. No. 01) |
| 8 | Class-150 (Non Modulao brick work in 1 :4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work (CP-6 S.I. No. 02) |
| 9 | RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth leuel:1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size)(5-Chapter S.I. No.-8) |
| 10 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level.(b) 10mm to 12mm tor. (Chapter No. 10 S.I. No. 504(B)) |
| 11 | 12mmcement plaster in single coat on rough site of single of half brick wall for interior plastering up to floor to levelIncluding internal rounded angles not excluding 80mm in girth and finished even and smooth.(b) 1cement : 6 Coarse sand.(Chapter No.13 Si.No. 1) |
| 12 | Mild steel of iron in heavy size such as trusses built up gates record reck, roof work gates etc. brought to required form including drilling holes revitting are welding where neccesary, and also including supply of steel bolts , nuts wastage etc. and there fixing required for completion of the work. |
| 13 | Cartage of Ballast, Kankar, Coal, Grit or Sand etc, including loading and unloading but excluding stackings on pucca roads.(Chapter No.3Si.No.8)8km. |
| 14 | Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (2 cm. Nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors. (5-Chapter S.I.NO6) |
| 15 | Providing and Iaying NP-3 pipe RCC concrete pipe for culverton first class in slngle row including fixing socket with cementmortar \"l:2 but excluding excavation, protection works\"backfilling, concrete and masonry works in head walls andparapets Clause 2900-2000m.m (MR) |
| 16 | Sub Total (A) |
| 17 | Deduction Cost of old brick |
| 18 | Deduction Cost of old brick bats |
| 19 | Sub Total (B) |
| 20 | Sub Total (A-B) = (C) |
| 21 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 22 | Grand Total |