| 1 | Reconductoring one km LT Sph 2 wire OH old line with new ACSRRabbit conductor incl. conveyance of materials. |
| 2 | Insertion of one LT PSC pole in existing Sph OH line incl. digging &back filling pit, fitting cross arm, insulator, binding etc. |
| 3 | Providing Stay for LT poles incl. digging & back filling pit. |
| 4 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 5 | Loading LT PSC pole from the stacking place and unloading the same atwork site (transport by vehicle). |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 poles excluding loading & unloading. |
| 7 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite |
| 8 | Additional rate for excavation of one Pit for LT Pole/LT Stay in HardLaterite. |
| 9 | Additional rate for excavation of one Pit for LT Pole/LT Stay in SoftRock. |
| 10 | Transporting LT ABC by hired vehicle to a distance up to 5 km andcarring up to 2 drum including loading and un loading using crane |
| 11 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messenger through existing poles |
| 12 | Dismantling (without damage) one km LT 3ph 4 wire OH line, crossarms, insulators and stacking the conductors in rolls. |
| 13 | Dismantling (without damage) one km LT Sph 2 wire OH line, crossarms, insulators and stacking the conductors in rolls. |
| 14 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 15 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 16 | Renewal of existing damaged/old LT PSC/RCC (Sph line) pole with newPSC pole in place and refitting of all items incl. conveyance (except pole). |
| 17 | Renewal of existing damaged/old LT TW/RSJ/Rail (Sph line) pole withnew PSC pole in place and refitting of all items incl. conveyance (exceptpole). |
| 18 | Renewal of existing damaged/old LT PSC/RCC (3ph line) pole with newPSC pole in place and refitting of all items incl. conveyance (except pole). |
| 19 | Renewal of existing damaged/old LT stay with new stay in place andrefitting of all items and conveyance of all materials. |
| 20 | Providing WP support with PSC pole incl. digging & back filling pit. |
| 21 | Dismantling and reconnecting Sph service connection from the OH lineincl. lowering down the WP portion. |
| 22 | Dismantling and reconnecting 3ph service connection from the OH lineincl. lowering down the WP portion. |
| 23 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmmwith bare/insulated Messenger through existing poles |
| 24 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 25 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 26 | Providing End Caps |
| 27 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 28 | Erection of suspension clamp for LT ABC of any size |
| 29 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fittinginsulators and binding the same with LT Line. |
| 30 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fittinginsulators and binding the same with LT Line. |
| 31 | Fitting one No. Section fuse on LT line with dropping cables, crimpingsockets, connecting with bolt&nut etc. |
| 32 | Providing Cable Tie |
| 33 | Installation of Pre-insulated lugs for 25sqmm |
| 34 | Installation of Pre-insulated lugs for 70sqmm |
| 35 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 36 | Installation of Pre-insulated straight through joints for 25sqmm cable |
| 37 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 38 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 39 | Providing one Coil Earth using GI earth wire, digging separate pit atstandard distance away from the pole/structure & backfilling. |
| 40 | Dismantling one ordinary street light/CFL/LED fitting from existing poleand refitting the same on newly erected pole and reconnecting. |
| 41 | Straightening one Slanted LT Cut pole after unbinding the line andrebinding the line after work. |
| 42 | Straightening one Slanted LT pole after unbinding the line and rebindingthe line after work. |
| 43 | Providing Fly stay for LT pole using LT PSC pole incl. digging & backfilling pit. |