Tender For Widening and strengthening work from 0000 to 2840 of Babatpur road via Hathiwar to Churpur. - Excavation in soil for making trenches for widening of road using hydraulic excavator C.K. 90 and tipper with disposal upto 1000 m :- Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 2 Construction of Embankment with Material Deposited from Roadway Cutting:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 3 Construction of Embankmentwith Material obtained from BorrowpitsConstruction of embankment with approved materials obtained from borrowpits with all lifts and leads, transporting to site , speading grading to required slope and compating to meet requirement of table 300-2. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 4 GSB Work for widening of road-By Mix in Place Method (for GSB Grading-1 material)Construction of granular sub-base (Grade-1 G.S.B.) by providing well graded material, spreading in uniform layers @1.28 times the specified compacted thicknes with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 5 Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density, complete as per Technical Specification Clause 406(b)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 6 Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density, complete as per Technical Specification Clause 406 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 7 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of0.25kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per Technical Specification Clause 502(i) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 8 Bituminous Concrete Grade II:-Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 9 Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 10 Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in abatching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 11 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I .(For Construction of Gule Culverts Single Row 350mm Dia) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 12 Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work.(For Construction of Gule Culverts Single Row 350mm Dia) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 13 Supply & Laying of 25mm brick ballast mixed with sand below pipe as bedding in 15cm thickness and in haunch of pipe upto1/10 of outer dia pipe. (For Construction of Gule Culverts Single Row 350mm Dia)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 14 M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. (For Construction of Gule Culverts Single Row 350mm Dia)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 15 Struck pointing in 1:2 cement & fine sand mortar on brick work including supply of all materials, labour and T&P etc Requuired for proper completion of work .(For Construction of Gule Culverts Single Row 350mm Dia)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 16 Plain/Reinforced cement concrete RCC-M-20 in super-structure complete as per drawing and Technical Specifications 1500, 1700 & 2200. (For Construction of Gule Culverts Single Row 350mm Dia)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 17 12mm thick plaster with cement mortor with cement and coarse sand of mortor in 1:4 . (For Construction of Gule Culverts Single Row 350mm Dia) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 18 Supply of 350 mm dia NP-3, S&S Hume Pipe including cartage upto site laoding, unloading and all Taxes etc. (For Construction of Gule Culverts Single Row 350mm Dia) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 19 Dismantling old Structure in cement mortar. (For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 20 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 21 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per Technical Specification Clause 2100 (For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 22 M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. (For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 23 R.C.C with 1:1.5:3 For Slab , Bed Block. as per Technical SI No-13.5(For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 24 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specification Clause 1600(For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 25 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.(For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 26 Pointing with cement mortar (1:2 ) on brick work in substructure as per Technical Specifications. (For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 27 Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Clause No-2706 & 2200(For Widening of RCC Slab Culvert 1.50 m Span) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 28 E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I. (For Construction of drain 600x600mm) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 29 Providing and laying of sand including cost of material, labour, water charges and T&P etc. required for proper completion of work as per S.I. No. 255.(For Construction of drain 600x600mm) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 30 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per technical specification clause no-2100. (For Construction of drain 600x600mm) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 31 Plain/Reinforced Cement Concrete M-20in Open Foundation complete as per Drawing and Technical Specifications. Clause Si No-13.5 (For Construction of drain 600x600mm) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 32 M.S. or Iron in plane work such as in reinforced concrete to required shaps as necessary including bending for completion of work and inlcuidng supply of tor steel its westage bend hooks and authoriesd over labpping shall be ineasued up to floor two level. As per technical specification clause no-1600 (For Construction of drain 600x600mm) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 33 PART BMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. 34 1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. 35 2nd year - maintainance cost 0.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. 36 3rd year - maintainance cost 0.50% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. 37 4th year - maintainance cost 0.75% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. 38 5th year - maintainance cost 1% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.