| 1 | Supply and delivery of following materials at site:-Supplyand delivery at site 15 KVA, 3 phase oil cooled typeservo motor operated Voltage Stabilizer, having unbalance 200 - 500 V input voltage, and 415(±1%) output voltage , Auto/manual servo voltage stabilizer with U/V,O/V,O/L protection with MCB at output side, input MCCB, Ammeter Bell etc. as per I.E rules and as per instruction of EIC.Make :- As per approved vendor list of PHED vide no. 8864/79/F/2018 dated 28.06.2024 with latest amendments. |
| 2 | Supply & delivery at site of 100 Amp,400V 50Hz 4 pole 4 way industrial Aluminium Busbur chamber Make :- As per approved vendor list of PHED vide no. 8864/79/F/2018 dated 28.06.2024 with latest amendments. |
| 3 | Supply & delivery at site of 100 Amp, 4 pole on load change over switch Make :- As per approved vendor list of PHED vide no. 8864/79/F/2018 dated 28.06.2024 with latest amendments. |
| 4 | Supply & delivery at site In sheet enclosure100 Amp, 400V 50Hz TPN Main Switch rewireable & site handle type along with suitable fuse link. Make :- As per approved vendor list of PHED vide no. 8864/79/F/2018 dated 28.06.2024 with latest amendments. |
| 5 | 1.1 KV Grade 415 V, 4 core 16 sq.mm. PVC sheathed XLPE insulated Al. armoured cable conforming to IS:7098 (PART-1) 2011 with latest amendmends as applicable.Make :- As per approved vendor list of PHED vide no. 8864/79/F/2018 dated 28.06.2024 with latest amendments. |
| 6 | Installation of the above supplied itemInstallation of the above voltage stabilizer of item no. 1 on the foundation including all connection complete as per direction of E.I.C. |
| 7 | Fitting, Fixing the supplied Busbar( as in item no.2)at suitable position on wall of pump house by flat/angle iron frame with necessary power connection all complete as per direction of E.I.C. |
| 8 | Fitting, Fixing the supplied changeover switch( as in item no.3)at suitable position on wall of pump house by flat/angle iron frame with necessary power connection all complete as per direction of E.I.C. |
| 9 | Fitting, Fixing the supplied Main switch( as in item no.4)at suitable position on wall of pump house by flat/angle iron frame with necessary power connection all complete as per direction of E.I.C. |
| 10 | Laying of cable (as in item no. 4) on wall/surface incl. S & F of MS saddles with earthing attachment in 10 SWG GI (Hot Dip) wire, making holes etc. as necy. mending good damages and painting all complete as per direction of E.I.C. |
| 11 | Supplying and fixing of compression type gland complete with brass gland, brass ring & rubber ring for dust & moisture-proof entry ofcable (as in item no. 4) all complete as per direction of E.I.C. |
| 12 | Finishing the end of cable (as in item no. 4) by crimping method incl. supplying and fixing solderless socket (Dowels make), tapes, anticorrosive paste & jointing materialsall complete as per direction of E.I.C. |
| 13 | Connecting the equipments to earth busbar including S & F 25mmx6mm GI earth strip on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages. |
| 14 | Add GST @ 18 % |
| 15 | Add Cess @ 1 % |