| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile orto deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc.complete as per direction of the Engineer-in-charge. (a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dryor moist / slushy silt / sticky soil. |
| 2 | Supplying to site empty cement polythene bags (Capacity 50kg) in good condition including stacking, incedental charges etc. all complete (Capacity 50 kg). |
| 3 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand oragreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 4 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 5 | Supplying Nylon cage netting 1 metre x 1 metre x 0.4 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.a) For 1m. x 1m. x 0.4m nominal size crate. |
| 6 | Labour Charges for Dumping and placing in position properly filled in nylon crates with filled in HDPE bags (maximum 13 nos.) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m and all lifts in river slope or bed by utting trenches upto 15 cm depth, if necessary, or by boat including cost of hire charges of boats with boatmen and other necessary equipment and also including cost of bags, carriage and charges of filling bags with earth/sand but excluding ost of nylon crate as per direction of the engineer- in - charge. N.B- Volume of each earth/sand filled HDPE bags should not be less than 0.0328 cum . size of nylon crate is 1 metre x 1 metre x 0.40 metre. Considering 85% filling of each bag for compaction in the crate for slope pitching as per guideline. (a) Where boats are not necessary. |
| 7 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete. Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of useof this item in the estimate.” |
| 8 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be lessthan 0.0328 cum). |
| 9 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.. |
| 10 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3.Size of Nylon crate is 1metre X 1metre X 1metre. |
| 11 | Providing and Laying Reinforced Cement Concrete Pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clouse 1106 of Rural Roads of MORD including carriage, loading unloading complete. (D) 1000 mm dia. |
| 12 | Supplying and laying brick Khoa of ordinary bats of size (38 mmx 63 mm) of approved quality in 100 mm layer (loose) filling in gaps with small ones rammed and compact as directed true to level and grade. |
| 13 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.a) Beyond 1.00 km and upto 2.00 km |
| 14 | Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard. (a) Up to 17.5 cm. diameter. |