| 1 | HAND PUMP MACHINE &PVC PIPE STRAINER &BLINDE PIPE WHOLE MATERIAL UPTO SITE |
| 2 | Pit digging by casine |
| 3 | casine boring == 0-30 |
| 4 | 30-60 |
| 5 | LOWERING OF PVC PIPE STRAINER & BLIDE PIPE== 0-30 |
| 6 | 30-60 |
| 7 | SUPPLY OF CORASE SEND &TAKE SURROUND OF STRAINER PVC PIPE |
| 8 | FILLING OF BENDONITE POWDER BETWEEN BORE HOLE &CASING PIPE |
| 9 | SUMMER SEVIL FITTING |
| 10 | DEVELOPMENT WORK UPTO SATISFACTION OF ENGG INCHARGE OF HAND PUMP AFTER ESTABLISH OF HAND PUMP |
| 11 | SANITARY FITTING WORK PLUMBER OR LABOUR |
| 12 | 110MM PVC PIPE |
| 13 | 110 MM PVCSTARINERPIPE |
| 14 | STRAINER CLOTH |
| 15 | ASTER |
| 16 | END CAP |
| 17 | SOLMENT |
| 18 | DORI |
| 19 | Submersible (1.5 hp) |
| 20 | PAINAL |
| 21 | Cable |
| 22 | SUPPORT WEIR |
| 23 | ADOPTER |
| 24 | Electric fitting with panel light inside and outside |
| 25 | 32MM G.I. PIPE |
| 26 | KILEMP |
| 27 | E/W Excavationin ordinary soils with cutting and lead lift all complete s.i.no 251 |
| 28 | C.C. in 1:6:12 cement fine sand with 40mm gauge brick ballast in foundation & under base including supply of all material and T&P etc. as per SI. No.273. |
| 29 | 1st b/work 1:4 in side wallswith c/c.sand mortar all complete as per s.i. no 305 |
| 30 | 12mm thick plasters 1:4with cement/c.sand mortar all complete as per s.i.no 584(1) |
| 31 | 6mm white china glazzed tiles on floor and skirting at s.i.no628 |
| 32 | R.c.c.1:2:4 in slabs on septic tankall complete as per s.i.no 284 |
| 33 | Mild steel work in slabs all complete s.i.no.504 |
| 34 | steel work welded in built up sections /framed work,including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer using structural steel etc.as required.sch.no.503 |
| 35 | Supply of 125 mm long hinges (Suply sch 18) |
| 36 | S & F of following material as filter media in the recharge pit including supply all material, labour and T&P etc.complete as per drawing and direction of Engineer in charge |
| 37 | sign.board for information |
| 38 | Blue star/Usha water cooler(storage capacity 150 ltr,cooling capacity 150 ltr,width 825mm,depth700mm,hieght 1225mm,weight 100kg,Automatic thermo state,glasses per hour 750) |
| 39 | V-guard stablizers 5 kva (automatic copper wiring,90-240 volt,) |
| 40 | Supply & hoisting of sintex or equivalent high density polythylene seamless tank |
| 41 | colour painting |
| 42 | Tray for waste water stainless steel sheet |
| 43 | Plumbering and fitting material such as pipe,elbow,t,cross as per require) |
| 44 | cost of drain for waste water flow |
| 45 | Mantinance charges |
| 46 | wiring point for water cooler main switches & material etc. |
| 47 | Safety Locking |
| 48 | Rectro reflecting sheet three side(left,right and front side) |
| 49 | Transportation Exp. |
| 50 | Installation/framing of steel structure and loading and unloading charges at site |
| 51 | Loading and unloading charges M.s.structure,water cooler and other materials |
| 52 | Labour for fitting charge with grouting of safty cover |
| 53 | maintance charge 1 year |
| 54 | Earthing work all materials and labour as per P.W.D schedhule |