| 1 | Rejuvenation ofKanthapori Mariyamman Kovil Kulam in Sittampoondi Pt |
| 2 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. |
| 3 | Earthwork excavation in all classes of soils except hard rock rerqurining blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidentail charges and sheeting, shoring. |
| 4 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 6 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 7 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 8 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 9 | Colour Washing two Coat with Exterior Emulsion Paint including all charges |
| 10 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 11 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 12 | Providing CC Pavement 17m @ Old Colony Street in Sittampoondi Pt |
| 13 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 14 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 15 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 16 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 17 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 18 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 19 | Provision for Bitumens Pad |
| 20 | Providing CC Pavement 25m @New Colony Street in Sittampoondi Pt |
| 21 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 22 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 23 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 24 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 25 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 26 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 27 | Provision for Bitumens Pad |
| 28 | Construction of Threshing Floor @ Puliyur Eri Near in Sittampoondi Pt |
| 29 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 30 | Supplying and filling in foundation and basement with good Gravel in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification |
| 31 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 32 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
| 33 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 34 | Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., |
| 35 | Brick work in cement mortor 1:5 mix using country bricks of size 22x11x7 cm including cost and conveyance of all materials and labour charges etc complete. |
| 36 | plastering with cement mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification |
| 37 | cost and supply og 50mm dia B class G I pipe for shed structural members including cost and conveyance etc |
| 38 | Labour charges for fabrication and fixing in postion as directed by the departmental officers etc, complete |
| 39 | Roofing with Galvanised iron corrugated sheets (including 15cm lapping) 0.8mm thick 80 nos of 20mmx6mm G.Ibolts and nuts and limpet washers; 20Nos of hook and nuts |
| 40 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 41 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 42 | Provision for Bitumens Pad |
| 43 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |