|
| 1 | fo|qr forj.k [k.M&\"k\"Ve] cqyUn\"kgj ds dk;Z{ks= esa fo0fo0m0[k0&izFke] vkSjxkackn@f}rh;] VkaM+k] ds vUrxZr iw.kZ tek ;kstuk en esa ¼jfuax fufonk½ fuos”k fe=@>ViV iksVZy ij vkosnukuqlkj la;kstu fuxZr djus gsrq ykbZu fuekZ.k laca/kh vU; dk;ZA |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 3 | STP Pole 11mtr Long. |
| 4 | PCC Pole 8.5 mtr Long. |
| 5 | PCC Pole 11mtr Long. |
| 6 | STP Pole 13 mtr Long. |
| 7 | Carriage of All line Material from store center BSR to at site ACSR Weasel/Rabit/dog conductor, XLPE Cable ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 8 | Erection ofSingle pccpole 8.5 mtr/ 11 mtr stp support including completeIT fittings with channelas per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | Erection ofSingle pcc pole 11 mtr support including completeIT fittings with channelas per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Erection of 11mtr pcc/13Mtr. STP Double pole/Scation Pole support including completeIT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Erection of 8.5mtr pcc double Pole support including completeIT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 14 | Cutting /drilling /fabrication of channel and angleWelding of MS Angle iron for making guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST pole for construction of the line. |
| 15 | Carriage and mounting of 10/25/63/100 KVA T/F/CT/PT Unit fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 16 | ALL. 1X16 Sq mm AB Cable |
| 17 | 3x50+1x35+1x16 Sq mm AB Cable |
| 18 | 3x95+1x35+1x16 Sq mm AB Cable |
| 19 | 3x120+1x95+1x16 Sq mm AB Cable |
| 20 | 25/63/100 KVA T/F . & CT/PT Unit |
| 21 | 10 KVA TF & CT/PT Unit Various Ratio |
| 22 | fixing of 11 Kv Stay rod with Stay wire in proper way with Nozelling. |
| 23 | Grouting of 11 Kv Stay rods. |
| 24 | fixing of 33 Kv Stay rod with Stay wire in proper way with Nozelling. |
| 25 | Grouting of 33 Kv Stay rods. |
| 26 | Laying, sagging. Stringing and binding and jumpering of ACSR Weisal , rabbit, dog newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 27 | Fixing of Earthing Complete |
| 28 | ACSR rabbit/Dog conductor |
| 29 | ACSR Weasel conductor |
| 30 | Received back old and use ACSRWeasel/rabbit/LT AB Conductor |
| 31 | Received back old and use ms iron scarpe |
| 32 | Fixing of 11 Kv DP Fues Set |
| 33 | Fixing of Droper Channel/Top Chennal/T-off chennel |
| 34 | Fixing of 11 Kv Pin Insilator with pin and nut |
| 35 | Fixing of 11 Kv Disc Insilator with fitting |
| 36 | Fixing of 33 Kv Pin Insilator with pin and nut |
| 37 | Fixing of 33 Kv Disc Insilator with fitting |
| 38 | Fixing of TF Base Angle/bracing |
| 39 | Fixing of 25/63/100 KVA T/F . & CT/PT Unit |
| 40 | Fixing of 10 KVA TF & CT/PT Unit Various Ratio |
| 41 | Fixing of 3- Phase Distribution Box. |
| 42 | Laying/sagging/strenghting of overheadXLPE Cable 3*70/ 120 sqmm |
| 43 | Guarding of GIwireswg |
| 44 | GI PIPE FIXING AND PROVIDING |
| 45 | Fixing of 11 Kv Cross Arm |
| 46 | Laying of 11 kv XLPE cable of various size via Cutt-open method. |
| 47 | Laying of 33 kv XLPE cable by cutt-open method. |
| 48 | providing & Laying of 33 kv XLPE cable with HDPE Pipe Method |
| 49 | Making/filling of 11 kv jointing kit 3x185mm etc. (I/D & O/D) |
| 50 | Laying1X16 Sq mm AB Cable |
| 51 | Laying 3x50+1x35+1x16 Sq mm AB Cable |
| 52 | Laying 3x95+1x35+1x16 Sq mm AB Cable |
| 53 | Laying 3x120+1x95+1x16 Sq mm AB Cable |
| 54 | Dismantling old T/F from site to esc store. |
| 55 | The folloing material is required to be Providing & Fixing by contractor. |
| 56 | Danger Board with clamps |
| 57 | LT Shakle Insilator |
| 58 | Ded endClamps with GI hook |
| 59 | Suspention clamps with GI hook |
| 60 | PRC |
| 61 | Holding clamp with Nut&bolts |
| 62 | F-Bracket with clamps |
| 63 | Barbed Wire |
| 64 | MS nut & Bolt off size. |
| 65 | providing and Fixing oftelness unit with proper grouting of Required and Earthing. |