Tender For Clearance Of Flood Water Of Village Bambulia Through Underground 3550 Mm Dia Hdpe Pipeline From Rd 0 To 4085 Out Falling Into Jsb Escape Channel At Rd 5750/R., Rohtak-Haryana
TDR : 48568363
Tender Notice
Corrigendum Details
BOQ
Expired
Rohtak
Haryana
Corrigendum : Tender For Clearance Of Flood Water Of Village Bambulia Through Underground 3550 Mm Dia Hdpe Pipeline From Rd 0 To 4085 Out Falling Into Jsb Escape Channel At Rd 5750/R.
Name of Work: Clearance of flood water of Village Bambulia through under ground HDPE pipe line Dia 355 mm from RD 0 to 4085 out falling into JSB Escape Channel at RD 5750-R.
Sl. No.
Item Description
1
Supplying, erection, testing and commissioning of Submersibe Horizontal open well dewatering pumping set of flood water having head 30 m as requirements of discharge in LPM and power capacity in BHP as ISI Marked, 6000 LPM x 70 BHP @ RS. 10000 per BHP.
2
Supplying erection, testing of fully automatic electric control panel board suitable for 3 No. pumping machinery of 6000LPM 70 BHP 30 mtr. head including Bus Bar consisting of MS sheet to thickness 14 gauge day painted box type floor mountedmadeofangleFrameContaining1no.fully automatic air brake starter suitable for Motor of the following capacity, Main switch of suitable range with HRC fuse, 1 no. volt meter (0 to 500 volts), 1 No. Amp. Meter of U to 100 amp. sets or Suitable electric as Such including wiring single phase complete in all respect as per specification given in Schedule No.3including MCB, Suitable, Capacitor etc as per site animating lamp capacitor of suite. preventers with the timer switch incusing wiring in panel board and Suitable electric energy meter wiring in Eclectic control Panel Board requirement complete in all respect as ISI Marked, 3 no. sets 6000 LPM x 70 BHP.
3
Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of 355 mm outer dia of PE-80 grade and PN-4 for water supply as per IS 4984-2016 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends , tees required during laying of pipe line along required alignment
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.