| 1 | Preparation of Blocking arrangements. |
| 2 | Keel block removal / refitting. |
| 3 | Bilge block removal / refitting. |
| 4 | Docking & Undocking of vessel. |
| 5 | Electrical shore power supply fromShipyard. |
| 6 | KortNozzleandthrustersare tobechecked / serviced / repaired. |
| 7 | Labour Charges. |
| 8 | Costofspare(Actual+10%basisasrequired) / machining. |
| 9 | Chipped, wire brushed, scrapped of underwaterplate, Shipsideplate& other fitments after Ultrasonictesting & Inspection of IWT Surveyor to be recommended, as per report of Ultrasonic test. |
| 10 | For surface preparation and painting of the underwater hull,above water hull plate and side plate to be undertaken as per following standards : (i) Surface preparation:Bywaterjetcleaning (ii)Surfacepainting:-Marinequality paintingtobedoneindustfree environmentusingairlessspray machine as following -(a) 1st coat -100 micronprimer(b)2ndcoat-70micron tiecoat(c)3rdcoat-125micronanti follic paint (d) 4th coat -125 micron anti follicglossy paint.Allpipelinesshould be colored as per marine color code. |
| 11 | Theentireshipsideshellplatefrom LWL to main deck is to be chipped,wire brushed,scrappedfromKeeltoLWLas per report of Ultrasonic test. |
| 12 | Theentireshipsideshellplatefrom LWLtodeckplate,bathroom,galley inside, engine room, store, roof, railing, railingchain,bollard,draftmark, plimsoll mark, stairs, stair railings,air vents,soundingpipe,rooms,roofalong with other fitment etc,as following, (a.)1coatzincchromateprimer,(b.)1 coat epoxy paint (c) marine quality paint tobedoneindustfreeenvironment using airless spray machine of 100 microneach.Allpipelinesshouldbe colored as per marine color code. After it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of EIC/ Surveyor. |
| 13 | Labour Charges. |
| 14 | Costofpaint(Actual+10%basisasrequired). |
| 15 | Alltypeofpumpsaretobechecked/ repair / overhauling if required including labour and cost of spares. |
| 16 | All electrical motors are to be checked / repairing/overhaulingifrequired including labour and cost of spares. |
| 17 | Propellers |
| 18 | Both propellers and bushes to be opened, inspection and if found any defect same to be rectify and repaired / machining / renewed. |
| 19 | Labour Charges. |
| 20 | Costofspare(Actual+10%basisasrequired). |
| 21 | DP Test. |
| 22 | Rudder, rudder stock, tail / intermediate / thrust shafts, bushes, rudder key to be opened, inspection and if found any defect same to be rectify and repaired / machining / renewed. |
| 23 | Labour Charges. |
| 24 | Costofspare(Actual+10%basisasrequired). |
| 25 | Ultrasonic testing to be made hull , deck plate and hull to LWL Ship side plate for thickness as per directionof IWT surveyor. |
| 26 | Renewal of under water plate, deck plate,Shipsideplate&otherfitments afterUltrasonictesting&Inspectionof IWTSurveyortoberecommended,as per report of Ultrasonic test. |
| 27 | IRS Inspection charges |
| 28 | Fire extinguisher is to be serviced, tested(Hydraulic)andrefilledand certificate is to be produced. |
| 29 | Foam type - 9 kgs |
| 30 | DCP - 5 kgs |
| 31 | Water Co2 - 9 Ltr |
| 32 | RoutinemaintenanceofbothGen-set engine, Make - Kirloskar, Type 4R1040, are to be serviced. |
| 33 | Labour Charges. |
| 34 | Costofspare(Actual+10%basisasrequired). |
| 35 | RoutineMaintanceofBothmainand auxenginesMake-YANMAR,Model no.-6HA2M-WHT,BHP-718(359X2), are to be serviced. |
| 36 | Labour Charges. |
| 37 | Costofspare(Actual+10%basisasrequired). |
| 38 | Side railing pipe are bended. The bendedpipearestraightaned,welded and if required same is to be changed. |
| 39 | Inter cooler system of Main & Aux. Engine.toremovedfromitsbase,tube tobecheckedandchemicalcleanning to be done.The entire unit to be properly cleanedpaintedandrefittedbackon OEpositionincluding,labour&costof spares. |
| 40 | All electrical/electronics AC/DC line/wiring, contol panel of engine room switchboard,wheelhouse, accommodation (lights, fans etc) ,engineroom(includingemergency lights), general alarm bell, D.C. horn, air horn, battery charger, switch boards ,MCBs,switchboard,sensors,lighting, navigational lights, search light, halogen light,firealarm,siren,bedlight,table light, lightcover,exhaust fan,wipers & other fittings etc. are to be checked and rectified the defects, as per direction of EIC/ Surveyor. |
| 41 | Labour Charges. |
| 42 | Costofspare(Actual+10%basisasrequired). |
| 43 | Allwatertank, ballasttankaretobe Sewagetankwithpumplinearetobe checked,cleaned&repairedproperly as per direction of IRS / EIC. |
| 44 | Sea chest, mud box, strainer to be checked,repaired,cleaned and painted as per direction of IRS / EIC. |
| 45 | Labour Charges. |
| 46 | Costofspare(Actual+10%basisasrequired). |
| 47 | Allmainseasuctionvalve andline valve along with its entire pipe line to be checked, tested and serviced, repaired/ renewed including other fitment of valve inentireshipasperdirectionofIRS/ EIC. |
| 48 | Labour Charges. |
| 49 | Costofspare(Actual+10%basisasrequired). |
| 50 | All wooden doors, windows, windors glass,wardrobe lock/handle &wheel house&crewcabinslidingdooretc. same to be check and repaired / replaced if required. |
| 51 | Labour Charges. |
| 52 | Costofspare(Actual+10%basisas required). |
| 53 | Rubber gasket of all man hole cover to be replaced with required stud bolt including labour & cost of spares. |
| 54 | Rubberbeadingofhatchcovertobe replacedincluding labour & cost of spares. |
| 55 | Port & STBD anchor chain, chain locker tobelaidoutchipped,blasted,cleaned &painted.Theendsoftheanchors chains are to be changed. |
| 56 | Labour Charges. |
| 57 | Costofspare(actual+10%basisifrequired) |
| 58 | Firehydrantvalvesandlinearetobe checked/serviced/repairifrequired including labour and cost of spares. |
| 59 | Ramps, pulley, hinges & safetywire check/replace, aretobeserviced/ replace if required including labour and cost of spares. |
| 60 | Passenger seating chairs are to be checked if damaged, same to be repair /renewedincludinglabourandcostofspares. |
| 61 | LifeRaftaretobechecked/service/ renewed if required including labourand materials. |
| 62 | Renewal of Anodes - Zinc Anodes old one removal and new one fitment. |
| 63 | Labour Charges. |
| 64 | Costofspare(Actual+10%basisasrequired). |
| 65 | All plumbing work like as flushing systemoftoilet,waterline,taps,wash basins,soapstand,towellrail,hanger, hook, water jet, shower, water line point are to be checked and repaired / replaced as required as per direction of EIC |
| 66 | Labour Charges. |
| 67 | Costofspare(Actual+10%basisas required). |
| 68 | Supply of danforth anchor, 150 kg weight including cost of anchor, installation & transportaion charge. |