| 1 | Removing of old & Damaged 1×150 mm² & 3×300 mm² , 6.6KV , PVC Sheathed, XLPE Power Cables fromTrenches/Cable Gallery & Ground & Shifting to same in Store or allotted Place . |
| 2 | 1×150 mm², 6.6KV,PVC Sheathed & XLPEPower Cable (Armoured). |
| 3 | 3×150 mm², 6.6KV,PVC Sheathed & XLPEPower Cable (Unarmoured). |
| 4 | Shifting of6.6KV New/Old Power Cables drums of following Size from Central Store/Site Store/ other Place to Work Site area & vice versa and then laying /dressing. |
| 5 | 1×150 mm² , 6.6KV,PVC Sheathed & XLPEPower Cable (Armoured). |
| 6 | 3×150 mm² , 6.6KV,PVC Sheathed & XLPEPower Cable (Unarmoured). |
| 7 | Laying /dressing/tagging & Lugging ofPower /Control Cable size up to 35 mm² . |
| 8 | Making End Termination joint of 6.6KV Power Cablesof following Sizes. |
| 9 | 1×150 mm² , 6.6KV,PVC Sheathed & XLPEPower Cable (Armoured). |
| 10 | 3×150 mm² , 6.6KV,PVC Sheathed & XLPEPower Cable (Unarmoured). |
| 11 | Making Straight through joint of6.6KV New/OldPower Cables of following Size. |
| 12 | 1×150 mm² , 6.6KV,PVC Sheathed & XLPEPower Cable (Armoured). |
| 13 | 3×150 mm² , 6.6KV,PVC Sheathed & XLPEPower Cable (Unarmoured). |
| 14 | Shifting of0.4 KV New/Old Power Cables drums following Size from Central Store/Site Store/ other Place to Work Site area & vice versa and then laying /dressing. |
| 15 | Laying /dressing/tagging & Lugging ofPower /Control Cable size up to 35 mm². |
| 16 | Laying /dressing/tagging & Luggingof Power Cable size above 35 mm²to 630 mm². |
| 17 | Laying /dressing/tagging & Lugging ofdifferent size (1.5mm to 6mm) PVC wires in Conduits. |
| 18 | Laying /dressing/tagging & Lugging of GI earthing wire. |
| 19 | Laying & proper fixing ofNew Cable Tray. |
| 20 | 0.4KV Cable Jointing of following Size. |
| 21 | Making Straight through joint of 0.4KVPower Cable size from 25 mm²to 150mm²(ALL CORE). |
| 22 | Making Straight through joint of 0.4KV Power Cable size above 150 mm²to 630 mm² (ALL CORE). |
| 23 | Making end termination of 0.4KV Power Cable size from 25 mm² to150 mm²(ALL CORE). |
| 24 | Making end terminationof0.4KV Power Cable size above 150mm² to 630 mm² (ALL CORE). |
| 25 | Housekeeping of Cable Gallery/Trenches of Unit 8 & 9 and BOP area excluding coal handling plant. |
| 26 | Up keeping of Zero metre Cable galleries of Unit 8 & 9. |
| 27 | Up keeping of 8.5 metre Cable galleries of Unit 8 & 9. |
| 28 | Up keeping of 8.5 metre Cable galleries of both ESP Unit 8 & 9. |
| 29 | Up keeping ofBoiler side Cable Trenches, Cable racks and Cable trestles of Unit 8 & 9. |
| 30 | Up keeping of Turbine side and BOP area Cable Trenches, Cable racks and Cable trestles of Unit 8 & 9 excluding coal handling plant. |
| 31 | Proper dressing of Power & Control Cables that laying down & hanging in Cable Gallery at Zero Metre. |
| 32 | Proper dressing of Power & Control Cables that laying down & hanging in Cable Gallery at 8.5 Metre Unit 8 &9. |
| 33 | Closing of holes of Cable entry & repairing offire sealing of Cable gallery Zero &8.5 Mtr. |
| 34 | Proper filling of bottom Holes/Gaps in 0.4 KV Switchgear MCC with POP (Plaster of paris). |