|
| 1 | Squirrel Cage Induction Motor for 0.5 to 2.5 HP (Burnt wire to be returned by the contractor0.800 Kg) |
| 2 | Motor Rewinding including labor charge for opening and reassembling complete with providing terminal leads up to connection plate. The work includes all material components required for up to satisfactory testing of motor on load |
| 3 | Replacement of Standard Connection Plate |
| 4 | Repairing of Motor Shaft by way of welding and turning/machining to make it suitable and fit for bearing size |
| 5 | Replacement of Air Cooling fan casted from Alluminium Alloy. |
| 6 | Replacement of bearing locks |
| 7 | Replacement of Stud |
| 8 | Replacement of bearing on Drive / Non Drive Side (Standard Size and make as per catalogue of Motors) |
| 9 | Pump Side for 0.5 to 2.5 HP |
| 10 | Labor Charge for opening and reassembling complete job |
| 11 | Replacement of Coupling |
| 12 | Replacement of Bearing (Any Standard Make) |
| 13 | Replacement of Gland Plate |
| 14 | Replacement of Shaft |
| 15 | Repairing of Lateral Ring (i) GM |
| 16 | Replacement of Stud |
| 17 | Replacement of Neck ring (Gun Metal) |
| 18 | Reconditioning of impeller |
| 19 | Gland Bush Gun Metal |
| 20 | Gland Sleeve |
| 21 | GM Check Nut |
| 22 | Key Strip |
| 23 | Squirrel Cage Induction Motor for 3.0 to 5.0 HP (Burnt wire to be returned by the contractor2.500Kg) |
| 24 | Motor Rewinding including labor charge for opening and reassembling complete with providing terminal leads up to connection plate. The work includes all material components required for up to satisfactory testing of motor on load |
| 25 | Replacement of Standard Connection Plate |
| 26 | Repairing of Motor Shaft by way of welding and turning/machining to make it suitable and fit for bearing size |
| 27 | Replacement of Air Cooling fan casted from Alluminium Alloy. |
| 28 | Replacement of bearing locks |
| 29 | Replacement of Stud |
| 30 | Replacement of bearing on Drive / Non Drive Side (Standard Size and make as per catalogue of Motors) |
| 31 | Pump Side for 3.0 to 5.0 HP |
| 32 | Labor Charge for opening and reassembling complete job |
| 33 | Replacement of Coupling |
| 34 | Replacement of Bearing (Any Standard Make) |
| 35 | Replacement of Gland Plate |
| 36 | Replacement of Shaft |
| 37 | Repairing of Lateral Ring (i) GM |
| 38 | Replacement of Stud |
| 39 | Replacement of Neck ring (Gun Metal) |
| 40 | Reconditioning of impeller |
| 41 | Gland Bush Gun Metal |
| 42 | Gland Sleeve |
| 43 | GM Check Nut |
| 44 | Key Strip |
| 45 | Squirrel Cage Induction Motor for 6.0 to 12.5 HP (Burnt wire to be returned by the contractor4.00Kg) |
| 46 | Motor Rewinding including labour charge for opening and reassembling complete with providing terminal leads upto connection plate. The work includes all material components required for upto satisfactory testing of motor on load |
| 47 | Replacement of Standard Connection Plate |
| 48 | Repairing of Motor Shaft by way of welding and turning/machining to make it suitable and fit for bearing size |
| 49 | Replacement of Air Cooling fan casted from Alluminium Alloy. |
| 50 | Replacement of bearing locks |
| 51 | Replacement of Stud |
| 52 | Replacement of bearing on Drive / Non Drive Side (Standard Size and make as per catalogue of Motors) |
| 53 | Pump Side for 6.0 to 12.5 HP |
| 54 | Labor Charge for opening and reassembling complete job |
| 55 | Replacement of Coupling |
| 56 | Replacement of Bearing (Any Standard Make) |
| 57 | Replacement of Gland Plate |
| 58 | Replacement of Shaft |
| 59 | Repairing of Lateral Ring (i) GM |
| 60 | Replacement of Stud |
| 61 | Replacement of Neck ring (Gun Metal) |
| 62 | Reconditioning of impeller |
| 63 | Gland Bush Gun Metal |
| 64 | Gland Sleeve |
| 65 | GM Check Nut |
| 66 | Key Strip |
| 67 | Squirrel Cage Induction Motor for 13.0 to 20.0 HP (Burnt wire to be returned by the contractor5.50Kg) |
| 68 | Motor Rewinding including labor charge for opening and reassembling complete with providing terminal leads up to connection plate. The work includes all material components required for up to satisfactory testing of motor on load |
| 69 | Replacement of Standard Connection Plate |
| 70 | Repairing of Motor Shaft by way of welding and turning/machining to make it suitable and fit for bearing size |
| 71 | Replacement of Air Cooling fan casted from Alluminium Alloy. |
| 72 | Replacement of bearing locks |
| 73 | Replacement of Stud |
| 74 | Replacement of bearing on Drive / Non Drive Side (Standard Size and make as per catalogue of Motors) |
| 75 | Pump Side for 13.0 to 20.0 HP |
| 76 | Labor Charge for opening and reassembling complete job |
| 77 | Replacement of Coupling |
| 78 | Replacement of Bearing (Any Standard Make) |
| 79 | Replacement of Gland Plate |
| 80 | Replacement of Shaft |
| 81 | Repairing of Lateral Ring (i) GM |
| 82 | Replacement of Stud |
| 83 | Replacement of Neck ring (Gun Metal) |
| 84 | Reconditioning of impeller |
| 85 | Gland Bush Gun Metal |
| 86 | Gland Sleeve |
| 87 | GM Check Nut |
| 88 | Key Strip |
| 89 | Squirrel Cage Induction Motor for 21.0 to 30.0 HP (Burnt wire to be returned by the contractor8.00Kg) |
| 90 | Motor Rewinding including labor charge for opening and reassembling complete with providing terminal leads up to connection plate. The work includes all material components required for up to satisfactory testing of motor on load |
| 91 | Replacement of Standard Connection Plate |
| 92 | Repairing of Motor Shaft by way of welding and turning/machining to make it suitable and fit for bearing size |
| 93 | Replacement of Air Cooling fan casted from Alluminium Alloy. |
| 94 | Replacement of bearing locks |
| 95 | Replacement of Stud |
| 96 | Replacement of bearing on Drive / Non Drive Side (Standard Size and make as per catalogue of Motors) |
| 97 | Pump Side for 21.0 to 30.0 HP |
| 98 | Labor Charge for opening and reassembling complete job |
| 99 | Replacement of Coupling |
| 100 | Replacement of Bearing (Any Standard Make) |
| 101 | Replacement of Gland Plate |
| 102 | Replacement of Shaft |
| 103 | Repairing of Lateral Ring (i) GM |
| 104 | Replacement of Stud |
| 105 | Replacement of Neck ring (Gun Metal) |
| 106 | Reconditioning of impeller |
| 107 | Gland Bush Gun Metal |
| 108 | Gland Sleeve |
| 109 | GM Check Nut |
| 110 | Key Strip |
| 111 | Squirrel Cage Induction Motor for 31.0 to 40.0 HP (Burnt wire to be returned by the contractor10.00Kg) |
| 112 | Motor Rewinding including labor charge for opening and reassembling complete with providing terminal leads up to connection plate. The work includes all material components required for up to satisfactory testing of motor on load |
| 113 | Replacement of Standard Connection Plate |
| 114 | Repairing of Motor Shaft by way of welding and turning/machining to make it suitable and fit for bearing size |
| 115 | Replacement of Air Cooling fan casted from Alluminium Alloy. |
| 116 | Replacement of bearing locks |
| 117 | Replacement of Stud |
| 118 | Replacement of bearing on Drive / Non Drive Side (Standard Size and make as per catalogue of Motors) |
| 119 | Pump Side for 31.0 to 40.0 HP |
| 120 | Labor Charge for opening and reassembling complete job |
| 121 | Replacement of Coupling |
| 122 | Replacement of Bearing (Any Standard Make) |
| 123 | Replacement of Gland Plate |
| 124 | Replacement of Shaft |
| 125 | Repairing of Lateral Ring (i) GM |
| 126 | Replacement of Stud |
| 127 | Replacement of Neck ring (Gun Metal) |
| 128 | Reconditioning of impeller |
| 129 | Gland Bush Gun Metal |
| 130 | Gland Sleeve |
| 131 | GM Check Nut |
| 132 | Key Strip |
| 133 | Squirrel Cage Induction Motor for 41.0 to 50.0 HP (Burnt wire to be returned by the contractor12.00Kg) |
| 134 | Motor Rewinding including labor charge for opening and reassembling complete with providing terminal leads up to connection plate. The work includes all material components required for up to satisfactory testing of motor on load |
| 135 | Replacement of Standard Connection Plate |
| 136 | Repairing of Motor Shaft by way of welding and turning/machining to make it suitable and fit for bearing size |
| 137 | Replacement of Air Cooling fan casted from Alluminium Alloy. |
| 138 | Replacement of bearing locks |
| 139 | Replacement of Stud |
| 140 | Replacement of bearing on Drive / Non Drive Side (Standard Size and make as per catalogue of Motors) |
| 141 | Pump Side for 41.0 to 50.0 HP |
| 142 | Labor Charge for opening and reassembling complete job |
| 143 | Replacement of Coupling |
| 144 | Replacement of Bearing (Any Standard Make) |
| 145 | Replacement of Gland Plate |
| 146 | Replacement of Shaft |
| 147 | Repairing of Lateral Ring (i) GM |
| 148 | Replacement of Stud |
| 149 | Replacement of Neck ring (Gun Metal) |
| 150 | Reconditioning of impeller |
| 151 | Gland Bush Gun Metal |
| 152 | Gland Sleeve |
| 153 | GM Check Nut |
| 154 | Key Strip |