Tender For Mod 3 Tg Scrubber 1/3 And 2/3 Pipes, Tg Ventry Replm With Be, Hazira-Gujarat

Arcelor Mittal Nippon Steel India Limited has published Tender For Mod 3 Tg Scrubber 1/3 And 2/3 Pipes, Tg Ventry Replm With Be. Submission Date for this Tender is 09-04-2025. Pipe Laying Tenders in Hazira Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

48540382
Tender For Mod 3 Tg Scrubber 1/3 And 2/3 Pipes, Tg Ventry Replm With Be
Open Tender
NCB
Gujarat
Hazira
09-04-2025

Tender Details

Tender For Mod 3 Tg Scrubber 1/3 And 2/3 Pipes, Tg Ventry Replm With Be 27021856 30 10 10 FABRICATION OF PIPE 6,400 IND 20 ERECTION OF PIPE 10,600 INM 30 DISMANTLING OF PIPE 10,600 INM 40 OPENING & CLOSING OF FLANGE. 2,400 IND 50 VALVE REMOVAL 2,100 IND 60 VALVE RE-FIXING 2,100 IND 70 SCAFFOLDING WITH MATERIAL FOR UPTO 10MTR 6,000 M3 80 SCAFFOLDING WITH MATERIAL FOR UPTO 20MTR 3,000 M3 90 SCAFFOLDING WITH MATERIAL ABOVE 20 MTR 3,000 M3 Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : SCOPE OF WORK - PIPING JOBS Scope of work vendor. Technical: Job Quantum: TYPE OF JOB JOINT TYPE PIPE SCHEDULE FABRICATION OF PIPE MS-MS 40 ERECTION OF PIPE MS-MS 40 DISMANTLING OF PIPE MS-MS 40 • Work height to be consider 5 to 10 meters. • Shifting of the pipes from stores / yard to site to be done by hydra and Trailer, hydra and Trailer will be given by AMNS. • Confirm the route of the pipeline to be erected as per the instruction of AMNS engineer • Doubling of the pipes to be done at ground level to speed-up the job of erection. • Structure support to be fixed on the pipe rack at the distance of 18 Mtr. • All the welding joint root welding will be DP tested by the agency and will be certified by AMNS engineer. • After root joint DP certification final welding will be started. • After final welding pipe welding joint to be painted with red oxide / paint given by the department • Pipe to be clamped by pipe clamping on the structural support. • The welding electrodes to be used should be AMNS approved only, (GEE, ESAB, ADOR, L<(>&<)>T). • Gas line to be tested with DP test for all welding joints as well as pressure test while starting the plant. • Any leakage observed during the plant start-up to be arrested. • All the scrap pipe / plates to be removed and shift to scrap yard. GENERAL SCOPE: • • All tools, tackles, consumables like cutting gas, welding electrodes including DP test kit if required is in the scope of the contractor. • • Cutting set, welding machines is in the scope of contractor, cutting set should be with backfire arrester and welding machine should be with 4 core power cable to be certified by department electrical engineer. • Scaffolding require in the job is in the scope of contractor. • Agency has skill manpower with height pass certified. • During work over roof piping jobs, lifeline provided by contractor. • All the scrape to be shifted to scrape yard and balance unused items to be shifted to workshop as per the in-charge instruction. • Contractor to arrange competent manpower only including supervisor for carrying out the job. • Agency has to comply all safety and security rules as and when persist. • Agency must arrange valid gate pass through SCRUM only. AMNS’S SCOPE: • Consumables like bolts <(>&<)> nuts, packing, RTV sealant, gaskets Page 2 of 9 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000131461 Date 02.04.2025 Submission Date 09.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details sheets, • Special welding electrodes will be the free issue from the AMNS. • Air, power, water will be made available at source by AMNS. • Scope of Work for Scaffolding • The Contractor shall supply at the appropriate time equipment, manpower <(>&<)> supervision. • All tools <(>&<)> tackles, materials, manpower for completion of jobs in all respect shall be in Contractor scope. • Adequate manpower consisting of skilled <(>&<)> appropriate labour in various trades and qualified supervisors. • All safety PPE’s such as safety belts, hard hats, goggles, shoes, boiler suit, etc. • All the material required for erection of scaffolding is in contractor’s scope. • All other materials required to complete and commission the facility successfully. • Each scaffolding without green tag (Certified ) incomplete. • All workmen to undergo safety training and necessary medical tests before commencement of job. • Transportation of all material, tools <(>&<)> tackles on contractor scope. • Highest standard of housekeeping must be maintained at the Workplace allotted to contractor. • • AMNS will not entertain any idling charges due to non-availability of work clearance. For AMNS steel - HBI plant • Movement of Manpower / Associates at our Hazira Site. • No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. • Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. • Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. Safety. • No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. • Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. • All PPE’S will be in vendor scope. • Vendor shall comply with the health, safety <(>&<)> environment policy as laid down by AMNS. • Contractor shall provide following safety gears <(>&<)> PPE’S with specifications approved by AM/NS: § Safety helmet: color (AM/NS with provide) § Safety shoes. § Hand gloves: cotton, leather, culver etc. § Safety jacket (As per AM/NS standard). § Dust mask. § Safety goggles. Page 3 of 9 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000131461 Date 02.04.2025 Submission Date 09.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details § Ear plug OR muff. Statutory • Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. • AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. • WC <(>&<)> Group insurance policy. • Manpower should be competent as per competency matrix as per latest MSA. • Following company rules and regulation provided by AM/NS Management time to time related to safety HSE and other rules and regulation. Penalty • Specific penalty for non-performance by vendor and must be strictly measured. • Penalty will be imposed in case of non-compliance / violation of HSE Norms and supervisor and Associates incompetency. • If job compliances are not within specific timing and as per requirement of AMNS India, penalty will be imposed as per AM/NS India norms. • If any Associate / supervisor misbehave with AM/NS employees or other associates’ penalty will be imposed as per AM/NS India norms. • Unauthorize mobile phone / sleeping case / theft case / vehicle speed greater than 20 Km/Hr. will be penalize as per AM/NS INDIA norm. • Deduction from bill shall be made for delay for plant start up due to the job compliance. • Specific penalty for noncompliance of housekeeping After finishing the work. Scope of Work AMNS India 1. All required work permits provided by AMNS steel India ltd. 2. All the consumables like bolts <(>&<)> nuts, packing, RTV sealant, gaskets sheets, special welding electrodes will be the free issue from the AMNS. 3. Air, power, water will be made available at source by AMNS. 4. For shifting of pipes and erection of pipes hydra / Crane will be given by AMNS FOR AMNS - HBI plant Item Note : 2 27021861 40 20 10 TG Ventry replm with bellow-sleeve, TGD 1 LO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : SCOPE OF WORK FOR THE REPLACEMENT OF M-03 FC TOP GAS VENTURY, TGS INLET BELLOW AND INLET SLEEVE PIPE, REMOVING/FIXING TGD LINERS TGS VENTURY REPLACEMENT: Drg. No.: ES-M4-57-40042-01-REV-6 Overall dimension of the TGS Ventury: Max OD: Ø 2606 MM Min OD: Ø 970 MM Height: 12130 MM Approximate weight – 8.5 MT TOTAL WEIGHT-11.2 MT+ PLATFORM WEIGHT+ SUPPORT WEIGHT-01 MT=12.2 MT. Ventury throat area dimension: Maximum OD: Ø 1090 MM Minimum OD: Ø 970 MM. Height : 1200 MM. Page 4 of 9 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000131461 Date 02.04.2025 Submission Date 09.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details SCRAFFOLDING REQUIRED: 530 CU-MTR. Assembly drawing - - ES-M4-57-40042-01-REV-6 ELEVATION: +37MTR. TO +47 MTR FOR VENTURY JOB CONTRACTOR’S SCOPE 1. Necessary works permit to taken before starting the job. 2. Safety talk, HIRAC <(>&<)> Toolbox Talks to be carried out before starting the job 3. Shifting of all materials to the work area as per instruction of area in charge. 4. TGS Ventury, Bellow and Sleeve pipe to be replaced as per Drawing. 5. Before cutting and removing TGS Ventury top part of top gas duct / Bottom Inlet pipe to be supported properly to avoid damage to the bellow. TGD inside help of scaffolding at 51 mtr deck liner or any erosion to be checked and repaired. 6. After properly locking top and bottom portion of TGS ventury, cut the top and bottom weld joint of ventury as per marking or instruction by AMNS engineer. 7. Remove the Ventury after cutting. 8. For bellow and Sleeve pipe removal, first of all top side 8-10 Meter long and 1.5 meter cone to be cut and shifted at side.(For bellow and sleeve replacement). 9. Cut top cone of Bellow and shift to side and lock the same with proper support welding. 10. Remove bellow by cutting/gauging. 11. Remove inside sleeve by chain block. 12. Clean/Grind the top surface area of TGS top side dome pipe. 13. Insert sleeve and same fixed and check with AMNS Engg. Maximum OD: Ø 1310 MM Minimum OD: Ø 1200 MM. Height : 1200 MM. SCRAFFOLDING REQUIRED: 720 CU-MTR. Assembly drawing - - ES/QM2/57/400041A-01 REV-0, ES/QM2/57/400041-01-REV-02, ES/QM2/57/400042-01-REV-02. ELEVATION: +40 MTR. TO +48 MTR FOR VENTURY JOB <(>&<)> +65 MTR. FOR TGD liner Job. CONTRACTOR’S SCOPE 1. Necessary works permit to taken before starting the job. 2. Safety talk, HIRAC <(>&<)> Toolbox Talks to be carried out before Page 5 of 9 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000131461 Date 02.04.2025 Submission Date 09.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details starting the job 3. Shifting of all materials to the work area as per instruction of area in charge. 4. TGS Ventury, Bellow and Sleeve pipe to be replaced as per Drawing. 5. Before cutting and removing TGS Ventury top part of top gas duct / Bottom Inlet pipe to be supported properly to avoid damage to the bellow. 6. After properly locking top and bottom portion of TGS ventury, cut the top and bottom weld joint of ventury as per marking or instruction by AMNS engineer. 7. Remove the Ventury after cutting. 8. For bellow and Sleeve pipe removal, first of all top side 8-10 Meter long and 1.5 meter cone to be cut and shifted at side.(For bellow and sleeve replacement). 9. Cut top cone of Bellow and shift to side and lock the same with proper support welding. 10. Remove bellow by cutting/gauging. 11. Remove inside sleeve by chain block. 12. Clean/Grind the top surface area of TGS top side dome pipe. 13. Insert sleeve and same fixed and check with AMNS Engg. 14. Fix bellow at its position and lock with stitch welding and same check with AMNS Engg. All care is to be taken for not damaging the bellow. No arc striking is to be done on or near the bellow. 15. After fixing bellow, top side cone to be positioned and same to be align with bellow. 16. Alignment and fitment to be check with AMNS Engg. after clearance by AMNS Engg. welding will be start. 17. Top gas Ventury to be lift and install up to its position. 18. After position, Ventury must be align with top and bottom cone. 19. Alignment and fitment to be check with AMNS Engg. after clearance by AMNS Engg. welding will be start. 20. Welding of the bellow to the duct to be carried out by suitable welding electrode Approved by ar. ( bellow to duct 312 electrode and duct to duct SS310 ) The root run and the surface welds are to be done by manual metal arc welding. 100% DP test is to be done for root as well as surface welds. 21. Install the tie rods and adjust them as per instructions of engineer in charge. 22. Top Gas duct inside inclined liners to be removed and anchor welding to be done after inside scaffolding preparation Job done by refractory dept. 23. Top Gas duct inside curved liners to be replaced after scaffolding preparation near hatch area. 24. In other welding, E 7018 welding rods to be used. Electrodes will be under contractor’s scope. 25. Any structural cutting/welding involved for carrying out the job is in contractor’s scope. Any structure cut for carrying out the job has to Page 6 of 9 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000131461 Date 02.04.2025 Submission Date 09.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details be fixed back by the contractor, at no extra cost. For other details refer ANNEXTURE - I ANNEXTURE - I 1) New equipment shifting from workshop / store to site and shifting of old equipment to store / workshop is under contractors scope. 2) Any cutting / welding required will be in contractors scope. AMNS will supply special welding electrode where ever it is mentioned. 3) Housekeeping should be carried out after completion job. All used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in-charge. 4) All safety rules and precaution of AMNS should be followed by the contractor and his men. 5) All welding are to be done by qualified welders approved by AMNS. 6) D. P. Test of the welding will be in contractor’s scope. 7) Any scaffolding required will be in contractors scope. 8) Any portion of structure / deck cut for the should be perfectly welded back by contractor and it is under contractors scope. 9) Most care should be taken during the job to avoid damage to the equipment / structure near by . 10) AMNS will provide only permanent material. 12) Free supply of air, water and electricity will be provided at single point. Adequate lighting will also be provided. 11) All tools, tackles like welding machines cutting sets, chain block, slings, spanners, hammers, hydraulic pumps, jacks, etc. will be in contractors scope. 12) All consumable like diesel, gas, welding electrode, gauging rods, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 13) All safety items like safety shoes, safety helmets, safety belts, hand gloves etc. Are to be arranged by the contractor. 14) Any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. 15) All joint should be leak proof. 16) Contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. GENERAL: All the jobs under the scope of work shall be done as per the instruction of the area engineer in - charge and as per quality judged by our area engineer and his decision shall be final abiding. Time is essence of the contract and total job shall have to be finished within time allotted. Penalty shall be imposed in case of any delay in completing the job. FOR AMNS INDIA LIMITED cleaning to start the job and during the job is the scope of contractor. Item Note : Page 7 of 9 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000131461 Date 02.04.2025 Submission Date 09.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 3 27021861 80 30 10 TGS assembly replacement 1 LO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : SCOPE OF WORK FOR THE TOP GAS SCRUBBER REPLACEMENT - MOD III SCOPE OF CONTRACTOR: - DRAWING NO. ES/M4/5740002-01-Rev-3, ES/M4/5740003-01-Rev-4 - MATERIAL SHIFTING FROM STORAGE TO THE SITE. - ALL WELDING IS TO BE DONE BY QUALIFIED WELDERS APPROVED BY AMNS. - ANY SCAFFOLDING REQUIRED FOR THE JOB WILL BE IN THE SCOPE OF CONTRACTOR. - ALL TOOLS AND TACKLES AND ALL CONSUMABLES ARE IN SCOPE OF CONTRACTOR. - ANY MODIFICATION OR ANY DEVIATION FROM THE DRAWING / SCOPE OF WORK SHOULD NOT BE DONE WITHOUT THE PROPER AND PRIOR APPROVAL OF AMNS. - IF THE JOBS ARE NOT DONE AS PER THE DRAWING / INSTRUCTION ANY REWORK IS DONE BECAUSE OF THE SAME IT SHALL NOT BE TREATED AS EXTRA WORK. - ALL JOINTS SHOULD BE LEAK PROOF. - ALL THE SCRAP IS TO BE SHIFTED TO SCRAP YARD AT SMP PLANT OR THE LOCATION SHOWN BY THE AMNS ENGINEER. - UTMOST CARE SHOULD BE TAKEN DURING THE JOB TO AVOID DAMAGE TO THE EQUIPMENT / STRUCTURE NEARBY. - OVERFLOW LINE 1000MM DIA BELLOW LOCKED AND PIPELINE REMOVED SAFELY, REMOVAL BELLOW INSPECTED IF FOUND OK THEN EDGE TO BE PREAPRED AND PRESERVED. - SCAFFOLDING TO BE MADE AT PDC DECK TO REACH CONE AND CYLINDER AREA THEN LOCKED CYLINDER AND FOR CONE REMOVAL NECCESARY CHAIN BLOCKS TIED ON FABRICATED WELDED EYES. - CONE CUT DOWN 8 TO 10 PIECES, THEN TAKE IT AT O LEVEL - LOCKED CYLINDER CUT DOWN IN PIECES AND THEN TAKE IT AT O LEVEL - AS PER DRAWING AND EXISTING STRUCTURAL MODIFIED AND CYLINDER ERECT AND SUPPORTING. - CYLINDER TO BE PLACED IN DECK BETWEEN AT 42 MTR TO 24 MTR FROM N/S WITH LIFTING BY 700 MT /500MT CRANE, REQUIRE MOVING APPARATUS AND CERTIFIED CHAIN BLOCK USING. - ALL JOB UNDER THE SCOPE OF WORK SHALL BE DONE AS PER INSTRUCTION OF THE AREA INCHARGE AND AS PER QUALITY JUDGE BY OUR AREA ENGGINEER AND HIS DECISION SHALL BE FINAL AND BINDING.THE DELAYES IF ANY OR EXTENSION OF THE WORK OR POOR QUALITY OF WORK DUE TO POOR WORKMENSHIP OR INADEQUATE. RESOURCES ON YOUR ACCOUNT SHOULD BE PANALIZED SUITABLY. BY CLIENT. Page 8 of 9 ArcelorMittal Nippon Steel India Pvt Ltd AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FTC013787 Request for Quotation Number 6000131461 Date 02.04.2025 Submission Date 09.04.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details TGS REPLACEMENT PROCEDURE- FOR TGS AS MICRO PLANNING / ESTIMATION Scope of works for Mod -IV shutdown. 1 Dismantling of Existing Top gas duct from EL -L58 m level 2 Dismantling of Existing Top gas bellow from EL 54M level 3 Dismantling of Existing Top gas ventury from EL 47 M level 4 Dismantling of Existing top gas bottom bellow, sleeve, and duct 5 Dismantling of Existing scrubber inlet ducting 16 connection piping systems. 6 Dismantling of Existing scrubber outlet duct, 16 connection piping systems. 7 Dismantling of Existing Top gas Scrubber cylindrical part by cutting in pcs. Approx. wt of 25 MT. 8 Dismantling of Existing Top gas Scrubber cone part by cutting in pcs. Approx. wt of 25 MT. 9 Dismantling of Furnace structures at EL - 52 M, EL47M, EL42M, EL 37M <(>&<)> EL30M Elevations 10 Dismantling of Top gas Ventury and scrubber Piping systems 11 Fabrication <(>&<)> Installation of skid for moving TGS from North to south manually approx. having weight of 25-30Mt structure shall be Erected <(>&<)> welded on above the EL 30M Furnace building as per approved sketch/drawing./// 12 Dismantling of Fabricated skid after completion of scrubber work. 1 Erection alignment and welding of Top gas duct. 2 Erection, alignment, and welding of Top gas ventury. bellow 3 Erection, alignment, and welding of Top gas Ventury 4 Erection, alignment and welding of top gas bellow, sleeve, and duct 5 Erection, alignment and welding of scrubber inlet ducting and 16 ‘‘Piping systems. 6 Erection, alignment and welding of scrubber outlet duct and 16 connection piping systems. 7 Erection of Top gas Scrubber Part 1 Top cylindrical Part (Approx wt 25 Mt:- The part 1 shall be placed at EL 30 M floor with the help of suitable crane ( 700MT capacity) from north side of the Furnace structure and moved manually on above the fabricated skid until it comes center of the furnace building. Then scrubber levelled, positioned, aligned and welded. 8 Erection of Top gas Scrubber Part 2 Top conical Part (Approx wt 25 Mt:- The part 2 shall be placed at EL 30 M floor with the help of suitable crane ( 700MT capacity) from north side of the Furnace structure and moved manually on above the fabricated skid until it comes center of the furnace building. Then scrubber levelled, positioned, aligned, and welded. 9 Erection of Furnace structures at EL - 52 M, EL47M, EL42M, EL 37M <(>&<)> EL30M Elevations 10 Erection of Piping systems at Top gas Ventury <(>&<)> Top gas Scrubber cleaning to start the job and during the job is the scope of contractor

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail