| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10with standard specifications. |
| 2 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 3 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 4 | Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 40% of 40mm size and 60% of 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 5 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size9 ” x 4 3/8 “x 2 3/4 ”from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.(For 10 M3) |
| 6 | Collection supply and filling of well gravel filling approved quarry including cost andConveyance of all materials to site and all labour charges for filling etc., Complete. |
| 7 | Plastering in Cement Mortor 1:5 Mix (one cement, five sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. |
| 8 | Supplying and fixing in position of steel doors & windows including cost & conveyance and all labour charges for fixing the furniture including all other incidental charges, etc. complete complying with std. Specification |
| 9 | Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specificationsfor 10 sqm |
| 10 | Painting two coats with ready mixed synthetic enamal paint including cost & conveyance and all other incidental charges etc. complete for iron work |
| 11 | Supplying and delivery of the 1.5 HP submercible Motor 50 LPM 60 metres head ISI mark as per standard specification |
| 12 | Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading ,tranportation and labour charges for fixing 2000 Ltr Tank |
| 13 | Errection of 1.5HP submersible motor with necessary fittings. |
| 14 | Supply and delivery of Panel Board including cost & Conveyance all labour charges etc.,complete |
| 15 | Drilling of 150mm dia deep bore well in hard rock area to required depthincluding cost and all labour charges and all other incidental charges etc complete. Upto 150 m from GL |
| 16 | Upto 150 m from below GL |
| 17 | 151m upto 180m |
| 18 | 181 m to 210 m |
| 19 | 211 m to 240 m |
| 20 | Supply and Fixing of 180mm OD 6KSC PVC Pipe for casing Pipe for Medium depth in to drilled bore well. |
| 21 | Supply and Delivery of 4.0 Sqmm Flat type Cable for Submergible motor including cost and conveyance of all materials etc. complete. |
| 22 | Supply and delivery of 1 1/2\"(40mm ) UPVC pipeincluding cost andConveyance of all materials to site and all charges for filling etc., Complete |