| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding, (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified . |
| 2 | Material & Labourfor light shade vitrified coloured tiles10mm thick (square /rectangular) area of each tile exceeding 0.18sqm but not exc 0.38 sqm in floors etc.set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar inCM 1:6 for laying floor tiles complete all as specified |
| 3 | Material & Labourfor light shade vitrified coloured tiles 10mm thick (square/rectangular) polished, area of each tiles not exceeding 0.36 sqm, as in skirting etc, set and jointed in neat cement slurry and pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4complete all as specified |
| 4 | Material & Labour for non skid ceramic coloured tiles7 to 8mm thick (square /rectangular) area of each tile exceeding 0.18sqm but not exc 0.38 sqm in floors etc.set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar inCM 1:6 for laying floor tiles complete all as specified |
| 5 | Material & Labour for non skid ceramic coloured tiles7 to 8mm thick (square /rectangular) area of each tile exceeding 0.18 sqm but not exc 0.38 sqm as in skirting etc.set & jointed in neat cement slurry & pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4complete all as specified |
| 6 | M&L for non skid ceramic coloured tiles7 to 8mm thick (square /rectangular) area of each tile exceeding 0.11sqm but not exc 0.18 sqmin flooringetc.set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar inCM 1:6 for laying floor tiles complete all as specified |
| 7 | M&L for non skid ceramic coloured tiles7 to 8mm thick (square /rectangular) area of each tile exceeding 0.11sqm but not exc 0.18 sqm as in skirting etc.set & jointed in neat cement slurry & pointed in white or coloured cement to matchincluding 10 mm thick cement plaster in CM 1:4complete all as specified |
| 8 | M&L for glazed ceramic coloured tiles 350 x 250 x 7 /450 x300x7 mm thick on skiriting/ dado, set & jointed in neat cement slurry & pointed with white/coloured to match including 10 mm thick cement plaster in CM 1:4complete all as specified |
| 9 | Dismantling of Stone slabs and tiles of any description or thickness in floors, aprons etc laid bedded and pointed in any mortar complete all as specified . |
| 10 | M&Lmachine cut kota stone slab flooring 20-22 mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab over 20 mm thick screed bed or bedding layer of mortar inCM 1:6 for laying kota stone , including rubbing andpolishing complete all as specified and as directed |
| 11 | All as per item No. 10 above but as in dado/ skirting, riser etc to be cutting required size including 20 mm thick becking layer in CM (1 : 4) complete as specified |
| 12 | Demolition of cement concrete of any description and in any position not otherwise specifically provided as specified . |
| 13 | M&L 25mm thick P.C.C (1:2:4) type B-0 using 12.50 mm graded stone aggregate as in floor finished fair & even complete all as specified and as directed. |
| 14 | M&L 40mm thick P.C.C (1:2:4) type B-0 using 12.50 mm graded stone aggregate as in floor finished even and smooth surface using extra cement complete all as specified. |
| 15 | M&L for 38 mm width and 1.50mm thick plastic dividing strips complete all as specified . |
| 16 | Supply & Fix in repairs vitreous china squatting pan \" Orissa Pattern\" size 580 x 440 mm white with integral foot restincluding connection to trap,and to flushing pipe, anti-syphonage pipe,etc. complete including making good to floor (excluding flushing cistern and flush pipe) complete all as specified |
| 17 | S& F in repair 75 mm dia PVC (SWR) floor trap, plain with grating including jointing with solvent cement complete all as specified . |
| 18 | Taking down shutter from the frame exc 1.00 Sqm and n exc 2.0 Sqm each complete all as specified |
| 19 | Refixing of shutter exc 1 Sqm but n. exc 2 Sqm after necessary repairs in the same opening all as specified. |
| 20 | NOTES :-1.The amount of schedule of credit shall be deducted from the total of this BOQ for arriving at contract sum.2.Unless otherwise specified the rates for PCC shall deemed to include the cost of formwork shuttering etc, required for complete and proper execution of the work. Refer Schedule \"A\" notes for details. |