Water Resources and Irrigation Government Departments Closing in 0 days TDR #48521873

Tender For Re-Construction Of V.R.B. At Km. 17.000 Babarpur Drain - Earthworkin Foundation In Dry Ordinary Soilincluding Lift Upto 1.5M And Lead Upto 30M Including Backfilling Watering And Ramming Of Excavated Earth In To The Structure And Sides Of Founda

Issued by Government Departments · babarpur, Uttar Pradesh
Tender Value
33.65 Lakhs
Estimated cost
Bid Submission
07 Apr 2025
0 days left
EMD
67000
Bank guarantee accepted
Document Fee
944
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
babarpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Re-Construction Of V.R.B. At Km. 17.000 Babarpur Drain - Earthworkin foundation in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in chargeupto distance of 30m from thefoundation trenches for other structure. 2 Providing concrete for plain concrete M 10grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20-40 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete, including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 3 Providing concrete for plain concrete M 15grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 4 Providing concrete for Reinforced cement concrete M20grade use in ret wall , approach slabincluding cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 5 ProvidingReinforced cement concreteM25 grade use in rcc slab , raft foundation , box structure etcincluding cost of finishing and excluding reinforcement in 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 6 Providing plain or reinforced concrete in M 25 gradeuse in wearing coat or floor using 16 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing complete as per drawings and technical specifications ,including overhead charges & Contractors profit but excluding GST. 7 Centering shuttering in special type of RCC work such as curves,T-beams,Bridges and syphons etcincluding line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc 8 Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc 9 Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST. 10 Earth work in embankment by power transported earth or in leadupto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. 11 Earth work inin ordinary soil for bundha removal including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. 12 Finishing walls with putty and(Two coats) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr/10sqm curing, cost of all materials, labours, T&P etc.

BOQ

Name of Work: Re-construction of V.R.B. at km. 17.000 Babarpur drain.
Sl. No. Item Description
1Earthworkin foundation in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in chargeupto distance of 30m from thefoundation trenches for other structure.
2Providing concrete for plain concrete M 10grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20-40 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete, including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST.
3Providing concrete for plain concrete M 15grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST.
4Providing concrete for Reinforced cement concrete M20grade use in ret wall , approach slabincluding cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST.
5ProvidingReinforced cement concreteM25 grade use in rcc slab , raft foundation , box structure etcincluding cost of finishing and excluding reinforcement in 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST.
6Providing plain or reinforced concrete in M 25 gradeuse in wearing coat or floor using 16 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing complete as per drawings and technical specifications ,including overhead charges & Contractors profit but excluding GST.
7Centering shuttering in special type of RCC work such as curves,T-beams,Bridges and syphons etcincluding line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc
8Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc
9Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST.
10Earth work in embankment by power transported earth or in leadupto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders.
11Earth work inin ordinary soil for bundha removal including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.
12Finishing walls with putty and(Two coats) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr/10sqm curing, cost of all materials, labours, T&P etc.

AI Tender Summary

OUR REF NO 48521873
AUTHORITY Government Departments
TENDER VALUE 33.65 Lakhs
LAST DATE 07-04-2025
Authority
Authority Name Irrigation Department
Work Description Tender For Re-Construction Of V.R.B. At Km. 17.000 Babarpur Drain - Earthworkin foundation in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in chargeupto distance of 30m from thefoundation trenches for other structure. 2 Providing concrete for plain concrete M 10grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20-40 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete, including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 3 Providing concrete for plain concrete M 15grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 4 Providing concrete for Reinforced cement concrete M20grade use in ret wall , approach slabincluding cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 5 ProvidingReinforced cement concreteM25 grade use in rcc slab , raft foundation , box structure etcincluding cost of finishing and excluding reinforcement in 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 6 Providing plain or reinforced concrete in M 25 gradeuse in wearing coat or floor using 16 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing complete as per drawings and technical specifications ,including overhead charges & Contractors profit but excluding GST. 7 Centering shuttering in special type of RCC work such as curves,T-beams,Bridges and syphons etcincluding line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc 8 Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc 9 Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST. 10 Earth work in embankment by power transported earth or in leadupto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. 11 Earth work inin ordinary soil for bundha removal including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. 12 Finishing walls with putty and(Two coats) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr/10sqm curing, cost of all materials, labours, T&P etc.
Basic Detail
Tender No 09/EE/2024-25
Bidding Type Tender
Location
City babarpur
State Uttar Pradesh
Key Dates
Publish Date 02 Apr 2025
Submission Date 07 Apr 2025
Open Date 07 Apr 2025
Finance
Tender Value 33.65 Lakhs
Tender Fee 944
EMD 67000
Exemption Not Available
Document List
BOQ_1849771.xls
d9ea4da3-4f21-4a3d-b1c7-d4efa538a0e0.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Apr 02, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 07, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 07, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1849771.xls

html

d9ea4da3-4f21-4a3d-b1c7-d4efa538a0e0.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders