| 1 | Cleaning and grubbinig road land including uprooting rank vegetation, grass,bushes,shrubs,saplings and trees grith up to 300mm,removal of stumps of trees cut earlier and disposal of unservicable material and stacking of serviceable material to be used or auctioned upto a lead of 100 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 2 | Providing supplying and fixing the Pre-cast SFRC(Pre-tansioned steel Fibre Reinforced Concrete) round wall with Pre-caast RCC pole having finished dimension of 175mmX175mmX3000mm providing the construction joint at the interval of 15.4mm made in M-30 grade concrete in OPC with 6nos of 4mm dia HTPC (High Tension pre coated) wire,fixed in cast-in-situ CC M-30 concrete in footing of size 600mm dia 600mm depth form top cover 150mm P.C.C of proportion in C.C(1:3:6) of size 600mm dia , 150mm depth at bottom and 600mm dia depth , 100mm sand filling in all kind of soil of size 600mm dia and 850mm depth including watering & curing for required days along with supplying fitting ,fixing of pre-cast , pre -tensioned SFRC Slab having dimension of 2100mm(long)X300mm(wide)X50mm(thick) (7nos of slab +300mmX150mm downward u-shaped copping ) per span made with M-30 grade concrete having 433 dia GI HTPC wire 4 nos covering the top of compound wall pole with Pre castSFRC Cover of size (300mmX300mmX150mm) in order to keep the panelsin position etc. complete in all respect including cost of pre-castSFAC top cover ,slab pole including both side painting two coats of approved weather coat paint over coat of a primers including cost and conveyance of all materials royalties taxes all labourcess, T&P required for the work etc. Complete as per direction of Engineer - in - charge. |
| 3 | Excavation of foundation in hard soil with50 m initial lead and1.5m initial lift including rough dressingand spreading outside foundation. |
| 4 | Filling foundation and plinth with sand and well watered and rammed including cost,conveyance and royalty etc complete as per direction of Engg-in -charge. |
| 5 | Cement concrete (1:4:8)with 40mm size CBHG metal including cost,conveyance and royalty etc. complete as per direction of Engg-in-Charge. |
| 6 | RCC M-20 grade using 20 mm and down grade black crusher broken hard granite chips including hoisting, laying , rigid and smoothcentering and shuttering including false work, dismantlingetc complete. |
| 7 | Footing |
| 8 | Columns |
| 9 | Supplying,fitting and placing uncoated HYSD bar reinforcement as per drawing and technical specification including cost,conveyance and all taxes of steel and binding wire etc.complete as per direction of Engg-in-Charge . |
| 10 | Footing & columns |
| 11 | Fly Ash Brick masonry in C.M. 1:6 in F&P including cost ,conveyance and royalty of materials curing etc. complete as per the direction of the Engg-in-Charge. |
| 12 | 1st Class fly ash brick masonry work in superstructure thoroughly soaked in water ,with cement mortar (1:6) including scaffolding , racking out joints,curing etc complete as per specification/drawing and as per the direction ofEngg-in- charge. |
| 13 | 12mm cement plaster in cement mortar (1:6) including necessary scaffolding curing etc.as per direction of Engg-in-charge. |
| 14 | Supplying and fixing of steel M.S. grill with all fixtures including cost of cutting holes in the brick masonry and RCC columns and making good to damage etc. as per the direction of Engg-in - Charge. |
| 15 | Priming of one coat with any approved red oxide over steel iron. |
| 16 | Painting 2 coats with any approved iron paint on new iron work. |
| 17 | Priming one coat with any approvedprimer over new plaster work. |
| 18 | Apply two coats with approved weather coat on new plaster work. |