|
| 1 | Safe carriage and erection of following material from Store Centre/Sub Store centre to site /JE store with loading & unloading at both ends respectively with providing all required accessories by contractor. |
| 2 | Cartage of Line material (ACSR Weasel/DOG/Rabit Conductor) from ESC Bijnor to above site including loading & unloading at the both end . |
| 3 | Cartage of Line material (LT PVC Cable 3.5x70 sqmm) from ESC Bijnor to above site including loading & unloading at the both end . |
| 4 | Cartage of Line material (ABC Cable 3x50+1x35+1x16 sqmm) from ESC Bijnor to above site including loading & unloading at the both end. |
| 5 | Cartage of 25 KVA Transformer from ESC Bijnor to above site including loading & unloading at the both end . |
| 6 | Cartage of Line material XLPE 33KV (3X300) Cable from ESC Bijnor to above site including loading & unloading at the both end . |
| 7 | Laying and sagging of ACSR weasel/Rabbit/Dog conductor in 33KV/11KV/LT line including its binding on Insulators ets complete work. (as per respo norms) |
| 8 | Laying and sagging ofXLPE 33KV (3X300) Cable in 33KV/11KV/LT line including its binding on Insulators ets complete work/Underground work. (as per respo norms) |
| 9 | Laying and sagging of Line material (ABC Cable 3x50+1x35+1x16 sqmm) from ESC Bijnor to above site including loading & unloading at the both end. |
| 10 | 3 Phase DO Fuse Set (as per respo norms) |
| 11 | Distribution Box( as per respo norms) |
| 12 | Laying and sagging of LT PVC Cable 3.5x70 sqmm in LT line including its binding on Insulators ets complete work. (as per respo norms) |
| 13 | cartage and Erection of STP/PCC Pole 8.5/09/11/13 Mtr. Long(as per respo norms) |
| 14 | Digging of pits STP/PCC Pole 8.5/09/11/13 Mtr. Long (as per respo norms) |
| 15 | Grouting of PCC/STP Poles (as per respo norms) |
| 16 | Cartage and Errection and Making of 33 kv Jointing KitIncoming and outgoing. (as per respo norms) |
| 17 | Digging of Stay (as per respo norms) |
| 18 | Earthing of PCC/STP Poles. (as per respo norms) |
| 19 | Grouting of Earthing/Stay (as per respo norms) |
| 20 | 33/11 KV Pin Insulator with nut bolt fixing(as per respo norms) |
| 21 | 33/11 KV Disc Insulator with nut bolt fixing(as per respo norms) |
| 22 | M/s Angle ( 50x50x6mm) |
| 23 | Installtion of LT Distribution Box (as per respo norms) |
| 24 | Sr. No. 25 to 36Material Provided and Fixing by Contractor with all Accessories (as per respo norms). |
| 25 | Providing & fixing of danger board at each location as per specification of the drawing. |
| 26 | Chemical Earthing |
| 27 | Stone pad |
| 28 | Lock for Distribution Box |
| 29 | Holding Clamps with Nut and Bolts. |
| 30 | All Type Clamps (Suspension/Dead/I Hook/I Bolt/PG Clamps/Stay Clamp/F clamp/stay Insulator etc) |
| 31 | I hook for LT ABC Line |
| 32 | Stay Insulator and stay clamp |
| 33 | 90 IBS Rail Pieces for T/f (4464kg/M) |
| 34 | concreating and plinth making for 10 MVA T/F |
| 35 | Power Transformer Oil Certrifuging |
| 36 | Power Transformer Shifting from one place to another place by crane |
| 37 | Back Cartage of Old used Damaged Material on sites and ABCfrom work Site to store/sub store including its loading and unloading |
| 38 | Back Cartage of Old used Material(10 KVA Tf) on sites from work Site to store/sub store including its loading and unloading |