}

Tender For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda, doda-Jammu And Kashmir

Power Development Department has published Tender For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda. Submission Date for this Tender is 11-04-2025. Material Handling Service Tenders in doda Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

48494368
Tender For Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda
Open Tender
NCB
Jammu And Kashmir
Doda
11-04-2025

Tender Details

Handling And Fabrication Of Various Materials In Divisional Stores At Doda Under The Jurisdiction Of Electric Division Jpdcl Doda- 1.00 Unloading of PCC Poles 11 Mtr Long 2.00 Unloading of PCC Poles 9 Mtr Long 3.00 Unloading of PCC Poles 8 Mtr Long 4.00 Unloading of ST Poles 13 Mtr Long 5.00 Unloading of ST Poles 11Mtr Long 6.00 Unloading of ST Poles 9 Mtr Long 7.00 Unloading of ST Poles 8 Mtr Long 8.00 Loading of PCC Poles 11 Mtr Long 9.00 Loading of PCC Poles 9 Mtr Long 10.00 Loading of PCC Poles 8 Mtr Long 11.00 Loading of ST Poles 13 Mtr Long 12.00 Loading of ST Poles 11Mtr Long 13.00 Loading of ST Poles 9 Mtr Long 14.00 Loading of ST Poles 8 Mtr Long 15.00 Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking 16.00 Unloading of /New ACSR Conductor 17.00 Loading of Old/New ACSR Conductor 18.00 Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking 19.00 Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking 20.00 Unloading of 25 KVA Transformer(New/Write BackTransformer) 21.00 Unloading of 63 KVA Transformer(New/Write BackTransformer) 22.00 Unloading of 100 KVA Transformer(New/Write BackTransformer) 23.00 Unloading of 250 KVA Transformer(New/Write BackTransformer) 24.00 Unloading of 400 KVA Transformer(New/Write BackTransformer) 25.00 Unloading of 630 KVA Transformer(New/Write BackTransformer) 26.00 Loading of 25 KVA Transformer 27.00 Loading of 63 KVA Transformer 28.00 Loading of 100 KVA Transformer 29.00 Loading of 250 KVA Transformer 30.00 Loading of 400 KVA Transformer 31.00 Loading of 630 KVA Transformer 32.00 Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 33.00 Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 34.00 Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly 35.00 Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly 36.00 Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 37.00 Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 38.00 Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 39.00 Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 40.00 Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 41.00 Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 42.00 Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking 43.00 Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking 44.00 Unloading of Channel/Angle/Flat Iron 45.00 Loading of Channel/Angle/Flat Iron 46.00 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly 47.00 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking 48.00 Unloading of Link/Knife/HG/DO/LA Set 49.00 Loading of Link/Knife/HG/DO/LA/GO Set 50.00 Unloading of CT/PT Unit 51.00 Loading of CT/PT Unit 52.00 Unloading of DPC CU/AL Wire 53.00 Unloading of Bush Rods and other allied workshop material 54.00 Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc) 55.00 Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc) 56.00 Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly 57.00 Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material 58.00 Unloading/Loading of Bammboo Ladder 59.00 Unloading/Loading of Single/Three Phase Meters 60.00 Unloading of PVC Cable single core 95/120/185mmsq 61.00 Unloading of PVC Cable single core 300/400/630mmsq 62.00 Loading of PVC Cable single core 95/120/185mmsq 63.00 Loading of PVC Cable single core 300/400/630mmsq 64.00 Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines 65.00 Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines 66.00 Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines 67.00 Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines 68.00 Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly 69.00 Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly 70.00 Loading of Aluminium and Copper wire 71.00 loading of Bush Rods and other allied Workshop material 72.00 Unloading/Loading of Single phase/three phase meters 73.00 Stacking of Single/Three phase meters 74.00 Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines 75.00 Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc 76.00 Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc 77.00 Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc 78.00 Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. 79.00 Unloading of Cement Bags 80.00 Carrigae of Cement Bags from unloading site to stacking site(Upto 50 Mtr) 81.00 Stacking of Cement bags 82.00 Loading of Cement Bags 83.00 Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents 84.00 Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store 85.00 Straightening of tilted fencing posts in the store premises for repair of fecning 86.00 Insertion of new fencing Posts in the store for repair of fencing 87.00 Dismantling of existing mesh fencing 88.00 Fixing of mesh Fencing 89.00 Fixiing of CGI Sheets 90.00 Dismantling of CGI sheets 91.00 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA 92.00 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA 93.00 Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking 94.00 Painting(Red oxide/Aluminium Paint) of Fabricated Material. 95.00 Unloading of old loose conductor and making bundles 96.00 Checking & maggering of 11Kv LA set HG set GO set CT/PT unit 97.00 Fabrication of Channel Cross Arms of sorts from MS Channel100x50x6 98.00 Fabrication of Angle iron braces /Belts/Guard Netting angles, fencing posts etc from angle iron of sizes 99.00 Fabrication of Channel Cross Arms of sorts from MS Channel75x40x6 100.00 Fabrication of Mukhi clamps from MS flat (suitable for 9mtr,11mtr and 13 mtr poles) 101.00 Fabrication of U- clamps from MS flat 102.00 Fabrication of Guy Rods from MS round iron 103.00 Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards 104.00 Fabrication of earthing spikes from MS tor steel of sorts as perREC Standards 105.00 Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards 106.00 Painting(Red oxide/Aluminium Paint) of Fabricated Material.

Key Value

Document Fees
INR 1000 /-
EMD
INR 25000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail